Smlouvy Dotace Platy Úřady Zakázky Politici Sponzoři & firmy Kauzy, analýzy
❤ Podpořte nás Přihlásit se Registrace

Textová podoba smlouvy Smlouva č. 1296985: Grantová dohoda č.732064 - DataBio - H2020-ICT-2016-2017

Příloha SML5200010516.docx

Upozornění: Text přílohy byl získán strojově a nemusí přesně odpovídat originálu. Zejména u strojově nečitelných smluv, kde jsme použili OCR. originál smlouvy stáhnete odsud

                        EUROPEAN COMMISSION
Communications Networks, Content and Technology
Data
Data Policy & Innovation
GRANT AGREEMENT NUMBER — 732064  —
 
DataBio
This 
Agreement 
(‘the Agreement’) is 
between 
the following parties:
on the one part,
the 
European Union 
(‘the EU’), represented by the European Commission ('the Commission'),
represented
 
for
 
the
 
purposes
 
of
 
signature
 
of
 
this
 
Agreement
 
by
 
Acting
 
Head
 
of
 
Unit,
 
Communications Networks, Content and 
Technology, 
Data, Administration and Finance, Gustav
 
KALBE,
and
on the other part,
1. 
‘the
 
coordinator’:
INTRASOFT  INTERNATIONAL  SA  (INTRASOFT)  
SA,  472324870,  established  in  
 
RUE
MONTOYER 40, BRUXELLES 1000, Belgium, VAT number BE0472324870, represented for the purposes of signing the Agreement by CEO, Alexandros Stergios MANOS
and the following other beneficiaries, if they sign their ‘Accession Form’ (see Annex 3 and Article 56):
2. 
LESPROJEKT SLUZBY SRO (LESPRO) 
SRO, 47537256, established in MARTINOV 197, 
ZARYBY 
27713, Czech
 
Republic,
3. 
ZAPADOCESKA UNIVERZITA V PLZNI (UWB)
, 3141991/49777513, established in UNIVERZITNI 8, PILSEN 30614, Czech Republic, 
VAT 
number
 
CZ49777513,
4. 
FRAUNHOFER GESELLSCHAFT ZUR FOERDERUNG DER 
ANGEWANDTEN 
FORSCHUNG 
E.V. 
(Fraunhofer) 
EV, VR4461, established in HANSASTRASSE 27C, MUNCHEN 80686, Germany, 
VAT 
number
 
DE129515865,
5. 
ATOS
 
SPAIN
 
SA
 
(ATOS)
 
SA,
 
M64516,
 
established
 
in
 
CALLE
 
DE
 
ALBARRACIN
 
25,
 
MADRID 28037, Spain, 
VAT 
number
 
ESA28240752,
6. 
STIFTELSEN SINTEF (SINTEF ICT) 
NO1, 948007029, established in STRINDVEIEN 4, TRONDHEIM 7034, Norway, 
VAT 
number
 
NO948007029MVA,
7. 
SPACEBEL 
SA (SPACEBEL) 
SA, LG165621, established in RUE DES CHASSEURS ARDENNAIS 6, LIEGE ANGLEUR 4031, Belgium, 
VAT 
number
 
BE0435536532,
8. 
VLAAMSE INSTELLING VOOR TECHNOLOGISCH ONDERZOEK 
N.V. 
(VITO) 
BE31, 244195916, established in 
BOERETANG 
200, MOL 2400, Belgium, 
VAT 
number
 
BE0244195916,
Grant Agreement number: 732064 — DataBio — H2020-ICT-2016-2017/H2020-ICT-2016-1
Associated with document Ref. Ares(2016)6013200 - 19/10/2016
2
9. 
INSTYTUT CHEMII BIOORGANICZNEJ POLSKIEJ AKADEMII NAUK (PSNC)
, 000849327, established in NOSKOWSKIEGO 12-14, POZNAN 61 704, Poland, 
VAT 
number PL7770002062,
10. 
CIAOTECH Srl (CiaoT) 
SRL, 1000785, established in VIA 
PALESTRINA 
25, ROMA 00189, Italy, 
VAT 
number
 
IT06963331001,
11. 
EMPRESA DE TRANSFORMACION AGRARIA SA (TRAGSA) 
SA, 37224, established
 
in CALLE MALDONADO 58, MADRID 28006, Spain, 
VAT 
number
 
ESA28476208,
12. 
INSTITUT FUR 
ANGEWANDTE 
INFORMATIK 
(INFAI) 
EV 
(INFAI) 
EV, VR4342, established in HAINSTRASSE 11, LEIPZIG 04109,
 
Germany,
13. 
NEUROPUBLIC AE PLIROFORIKIS & EPIKOINONION (NP) 
AE, 45219, established in METHONIS 6 KAI SPILIOTOPOULOU, PEIRAIAS 18545, Greece, 
VAT 
number
 
EL999608870,
14. 
Ústav pro hospodářskou úpravu lesů Brandýs nad Labem (UHUL FMI)
, 00020681, established in Nábřežní 1326, Brandýs nad Labem 250 01, Czech Republic, 
VAT 
number CZ00020681,
15. 
INNOVATION 
ENGINEERING SRL (InnoE) 
SRL, 1238966/CF1053833100, established in 
Via 
Palestrina 25, Rome 00189, Italy, 
VAT 
number
 
IT10538331009,
16. 
Teknologian tutkimuskeskus VTT Oy (VTT) 
FI21, 26473754, established in VUORIMIEHENTIE 3, Espoo 02150, Finland, 
VAT 
number
 
FI26473754,
17. 
SINTEF FISKERI OG 
HAVBRUK 
AS (SINTEF Fishery) 
AS, 980478270, established in Brattørkaia 17B, TRONDHEIM 7465, Norway, 
VAT 
number
 
NO980478270,
18. 
SUOMEN METSAKESKUS-FINLANDS SKOGSCENTRAL (METSAK)
, 24409214, established in ALEKSANTERINKATU 18A, LAHTI 15140, Finland, 
VAT 
number
 
FI24409214,
19. 
IBM ISRAEL - SCIENCE AND TECHNOLOGY 
LTD 
(IBM)
, 51-096471-1, established in 94 DERECH 
EM-HAMOSHAVOT, 
PETACH 
TIKVA 
49527, Israel, 
VAT 
number
 
IL95432408,
20. 
MHG SYSTEMS OY - MHGS (MHGS)
, 19626097, established in 
PATTERISTONKATU 
-
 
C/ O MIKPOLI MC - 2, MIKKELI 50100, Finland, 
VAT 
number
 
FI19626097,
21. 
NB ADVIES BV (NB Advies) 
BV, 65961900, established in ZUIDERDIEP 222, 2E EXLOERMOND 9571 BM, Netherlands, 
VAT 
number
 
NL856335022B01,
22. 
CONSIGLIO
 
PER
 
LA
 
RICERCA
 
IN
 
AGRICOLTURA
 
E
 
L'ANALISI
 
DELL'ECONOMIA AGRARIA (CREA)
, 1246261, established in VIA PO 14, ROMA 00198, Italy, 
VAT 
number IT08183101008,
23. 
FUNDACION AZTI - AZTI FUNDAZIOA (AZTI) 
ES3, F38, established in TXATXARRAMENDI
 
UGARTEA
 
Z/G,
 
SUKARRIETA
 
48395,
 
Spain,
 
VAT
 
number
 
ESG48939508,
24. 
KINGS 
BAY 
AS (KingsBay) 
AS, 879946832, established in ., LEINOY 6094, Norway, 
VAT 
number
 
NO879946832MVA,
25. 
EROS AS (Eros) 
AS, 977390176, established in 6092 
FOSNAVAAG, 
HEROY 1515, Norway, 
VAT 
number
 
NO977390176MVA,
26. 
ERVIK & SAEVIK AS (ESAS) 
AS, 990136556, established in MMC BYGGET MJOLSTADNESET, 
FOSNAVAG 
6092, Norway, 
VAT 
number
 
NO990136556MVA,
27. 
LIEGRUPPEN
 
FISKERI
 
AS
 
(LiegFi)
 
AS,
 
979468970,
 
established
 
in
 
GRONAMYRVEGEN
 
2, STRAUME 5353, Norway, 
VAT 
number
 
NO979468970MVA,
28. 
E-GEOS 
SPA 
(e-geos) 
SPA, 
67388/CF01032180778, established in CONTRADA TERLECCHIE, 
MATERA 
75100, Italy, 
VAT 
number
 
IT01032180778,
29. 
DANMARKS TEKNISKE UNIVERSITET (DTU)
, 30060946, established in ANKER ENGELUNDSVEJ
 
1
 
BYGNING
 
101
 
A,
 
KGS
 
LYNGBY
 
2800,
 
Denmark,
 
VAT
 
number
 
DK30060946,
30. 
FEDERUNACOMA SRL UNIPERSONALE (Federu) 
SRL, 408195, established in VIA ALDO MORO 64 TORRE 1, BOLOGNA 40127, Italy, 
VAT 
number
 
IT04227291004,
31. 
CSEM CENTRE SUISSE D'ELECTRONIQUE ET DE MICROTECHNIQUE SA - RECHERCHE ET DEVELOPPEMENT (CSEM) 
SA, CH64510005639, established in RUE JAQUET DROZ 1, NEUCHATEL 2002, Switzerland, 
VAT 
number CHE106080392TVA, 
as ‘beneficiary not receiving EU funding’ (see Article
 
9),
32. 
UNIVERSITAET
 
ST.
 
GALLEN
 
(UStG)
,
 
N/A,
 
established
 
in
 
DUFOURSTRASSE
 
50,
 
ST
 
GALLEN 9000, Switzerland, 
VAT 
number CHE115978205, 
as ‘beneficiary not receiving EU funding’ (see Article
 
9),
33. 
NORGES SILDESALGSLAG SA (Sildes) 
SA, 951206091, established in 
SLOTTSGATEN 
3, BERGEN 5003, Norway, 
VAT 
number
 
NO951206091MVA,
34. 
EXUS 
SOFTWARE 
LTD 
(EXUS)
, 07932357, established in OLD BROAD STREET 25 TOWER 42, LONDON EC2N 1PB, United Kingdom, 
VAT 
number
 
GB141852815,
35. 
CYBERNETICA
 
AS
 
(CYBER)
 
AS,
 
10140133,
 
established
 
in
 
MAEALUSE
 
2,
 
TALLINN
 
12618, Estonia, 
VAT 
number
 
EE100322358,
36. 
GAIA EPICHEIREIN ANONYMI 
ETAIREIA 
PSIFIAKON YPIRESION (GAIA) 
AE, 128737001000, established in 2, LEOFOROS KIFISIAS KAI 
PARADEISOU 
STR., MAROUSI 15125, Greece, 
VAT 
number
 
EL800548182,
37. 
SOFTEAM (Softeam) 
FR39, RCS 
PARIS 
B 352 649 339, established in 
Avenue Victor 
Hugo 21, 
PARIS 
75016, France, 
VAT 
number
 
FR69352649339,
38. 
FUNDACION
 
CITOLIVA,
 
CENTRO
 
DE
 
INNOVACION
 
Y
 
TECNOLOGIA
 
DEL
 
OLIVAR 
Y DEL ACEITE 
(CITOLIVA)
 
ES3, JA860, established in CALLE SIERRA MORENA MANZANA
 
PARQUE
 
CIENTIFICO
 
TECNOLOGICO
 
GEOLIT
 
EDIFICIO
 
CTSA
 
MODULO
 
1
 
11, MENGIBAR JAEN 23620, Spain, 
VAT 
number
 
ESG23490584,
39. 
TERRASIGNA SRL 
(TerraS) 
SRL, J4093892001, established in STRADA COZLA 6 BL A8 SC 2 ET 1 AP 21 SECTOR 3, BUCURESTI 032733, Romania, 
VAT 
number
 
RO14283349,
40. 
ETHNIKO KENTRO EREVNAS KAI TECHNOLOGIKIS ANAPTYXIS (CERTH) 
GR8, PD772000,
 
established
 
in
 
CHARILAOU
 
THERMI
 
ROAD
 
6
 
KM,
 
THERMI
 
THESSALONIKI
 
57001, Greece, 
VAT 
number
 
EL099785242,
41. 
METEOROLOGICAL
 
AND
 
ENVIRONMENTAL
 
EARTH
 
OBSERVATION
 
SRL
 
(MEEO) 
SRL, 184122, established in VIALE VOLANO 195A IN2, FERRARA 44123, Italy, 
VAT 
number IT01629630383,
42. 
ECHEBASTAR FLEET SOCIEDAD 
LIMITADA 
(ECHEBF) 
SL, BI40934, established in VP/ MUELLE ERROSAPE, S/N, BERMEO 48370, Spain, 
VAT 
number
 
ESB95337432,
43. 
NOVAMONT 
SPA 
(Novam) 
SPA, 
171484/CF08526630150, established in VIA GIACOMO 
FAUSER 
8, 
NOVARA 
28100, Italy, 
VAT 
number
 
IT01593330036,
44. 
Senop
 
Oy
 
(Senop)
 
OY
 
OYJ,
 
FI17959269,
 
established
 
in
 
Lentolantie
 
7,
 
Kangasala
 
36220,
 
Finland, 
VAT 
number
 
FI17959269,
45. 
UNIVERSIDAD DEL 
PAIS 
VASCO/ 
EUSKAL HERRIKO UNIBERTSITATEA (EHU/ UPV)
,
 
established
 
in
 
BARRIO
 
SARRIENA
 
S
 
N,
 
LEIOA
 
48940,
 
Spain,
 
VAT
 
number
 
ESQ4818001B,
46. 
OPEN GEOSPATIAL CONSORTIUM (EUROPE) LIMITED LBG (OGCE) 
GB5, 03999270, established in 
GRAY 
S INN ROAD 236 FLOOR 1, LONDON WC1X 8HL, United Kingdom, 
VAT 
number
 
GB802241873,
47. 
ZETOR
 
TRACTORS
 
AS
 
(ZETOR)
 
AS,
 
26921782,
 
established
 
in
 
TRNKOVA
 
3060/111,
 
BRNO 628 00, Czech Republic, 
VAT 
number
 
CZ26921782,
48. 
COOPERATIVA 
AGRICOLA 
CESENATE SOCIETA 
COOPERATIVA 
AGRICOLA (CAC) 
SC, 34655, established in VIA CALCINARO 1450, CESENA 47251, Italy, 
VAT 
number IT00144040409,
Unless otherwise specified, references to ‘beneficiary’ or ‘beneficiaries’ include the coordinator.
The
 
parties
 
referred
 
to
 
above
 
have
 
agreed
 
to
 
enter
 
into
 
the
 
Agreement
 
under
 
the
 
terms
 
and
 
conditions 
below.
By signing the Agreement or the Accession Form, the beneficiaries accept the grant and agree to implement it under their own responsibility and in accordance with the Agreement, with all the obligations and conditions it sets out.
The Agreement is composed of: Terms and Conditions
Annex
 
1
	Description of
 
the
 
action
 
Annex
 
2
	Estimated budget for the
 
action
2a Additional information on the estimated budget Annex
 
3
	Accession
 
Forms
Annex 4          Model for the financial statements
Annex
 
5
	Model for the certificate on the
 
financial
 
statements
 
Annex
 
6
	Model for the certificate on the
 
methodology
TERMS AND CONDITIONS
TABLE OF CONTENTS
CHAPTER
 
1
	GENERAL
	
13
ARTICLE 1 — SUBJECT OF 
 
THE
 
AGREEMENT
	13
CHAPTER
 
2
	ACTION
	
13
ARTICLE 2 — ACTION TO 
 
BE
 
IMPLEMENTED
	13
ARTICLE 3 — 
DURATION 
AND 
STARTING 
DATE 
OF 
 
THE
 
ACTION
	13
ARTICLE 4 — 
ESTIMATED 
BUDGET AND
 
BUDGET
 
TRANSFERS
	13
48.1 
Estimated
 
budget
	13
48.2 
Budget
 
transfers
	13
CHAPTER
 
3
	GRANT
	
13
ARTICLE 5 — GRANT 
AMOUNT, 
FORM OF 
GRANT, 
REIMBURSEMENT 
RATES 
AND FORMS OF
 
COSTS
	13
5.1 
Maximum
 
grant
 
amount
	13
5.2 
Form of grant, reimbursement rates and forms 
 
of
 
costs
	14
5.3 
Final grant amount
 
—
 
Calculation
	14
5.4 
Revised final grant amount
 
—
 
Calculation
	16
ARTICLE 6 — ELIGIBLE AND  INELIGIBLE
 
COSTS
	16
6.1 
General conditions for costs to 
 
be
 
eligible
	16
6.2 
Specific conditions for costs to 
 
be
 
eligible
	17
6.3 
Conditions for costs of linked third parties to 
 
be
 
eligible
	23
6.4 
Conditions for in-kind contributions provided by third parties free of charge to
 
be eligible
	23
6.5 
Ineligible
 
costs
	23
6.6 
Consequences of declaration of
 
ineligible
 
costs
	23
CHAPTER 4    RIGHTS AND OBLIGATIONS OF
 
THE
 
PARTIES
	
24
SECTION 1   RIGHTS AND OBLIGATIONS 
RELATED 
TO IMPLEMENTING THE
 
ACTION
	
24
ARTICLE 7 — GENERAL 
OBLIGATION 
TO 
PROPERLY 
IMPLEMENT
 
THE
 
ACTION
	24
7.1 
General obligation to properly implement 
 
the
 
action
	24
7.2 
Consequences
 
of
 
non-compliance
	24
ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD 
PARTIES 
INVOLVED 
IN THE
 
ACTION
	24
ARTICLE 9 — IMPLEMENTATION OF ACTION 
TASKS 
BY BENEFICIARIES NOT RECEIVING EU
 
FUNDING
	24
9.1 
Rules for the implementation of action tasks by beneficiaries not receiving
 
EU
 
funding
	24
9.2 
Consequences
 
of
 
non-compliance
	25
ARTICLE 10 — PURCHASE OF GOODS, WORKS 
 
OR
 
SERVICES
	25
10.1 
Rules for purchasing goods, works 
 
or
 
services
	25
10.2 
Consequences
 
of
 
non-compliance
	25
ARTICLE 11 — USE OF IN-KIND CONTRIBUTIONS PROVIDED BY THIRD 
PARTIES 
AGAINST
 
PAYMENT
	
26
11.1 
Rules for the use of in-kind contributions 
 
against
 
payment
	26
11.2 
Consequences
 
of
 
non-compliance
	26
ARTICLE 12 — USE OF IN-KIND CONTRIBUTIONS PROVIDED BY THIRD 
PARTIES 
FREE OF
 
CHARGE
	26
12.1 
Rules for the use of in-kind contributions free 
 
of
 
charge
	26
12.2 
Consequences
 
of
 
non-compliance
	27
ARTICLE 13 — IMPLEMENTATION OF ACTION 
TASKS
 
BY
 
SUBCONTRACTORS
	27
13.1 
Rules for subcontracting
 
action
 
tasks
	27
13.2 
Consequences
 
of
 
non-compliance
	27
ARTICLE 14 — IMPLEMENTATION OF ACTION 
TASKS 
BY LINKED
 
THIRD
 
PARTIES
	
28
14.1 
Rules for calling upon linked third parties to implement part of 
 
the
 
action
	28
14.2 
Consequences
 
of
 
non-compliance
	28
ARTICLE 15 — FINANCIAL SUPPORT TO 
 
THIRD
 
PARTIES
	
28
15.1 
Rules for providing financial support to 
 
third
 
parties
	28
15.2 
Financial support in the form 
 
of
 
prizes
	29
15.3 
Consequences
 
of
 
non-compliance
	29
ARTICLE 16 — PROVISION OF TRANS-NATIONAL OR VIRTUAL ACCESS TO RESEARCH
 
INFRASTRUCTURE
	29
16.1 
Rules for providing trans-national access to
 
research
 
infrastructure
	29
16.2 
Rules for providing virtual access to
 
research
 
infrastructure
	29
16.3 
Consequences
 
of
 
non-compliance
	29
SECTION 2   RIGHTS AND OBLIGATIONS 
RELATED 
TO THE
 
GRANT
 
ADMINISTRATION
	
29
ARTICLE 17 – GENERAL 
OBLIGATION 
 
TO
 
INFORM
	29
17.1 
General obligation to provide information
 
upon
 
request
	29
17.2 
Obligation to keep information up to date and to inform about events and circumstances likely to
 
affect
 
the
 
Agreement
	29
17.3 
Consequences
 
of
 
non-compliance
	30
ARTICLE 18 — KEEPING RECORDS —
 
SUPPORTING
 
DOCUMENTATION
	30
18.1 
Obligation to keep records and other
 
supporting
 
documentation
	30
18.2 
Consequences
 
of
 
non-compliance
	31
ARTICLE 19 — SUBMISSION
 
OF
 
DELIVERABLES
	31
19.1 
Obligation to
 
submit
 
deliverables
	31
19.2 
Consequences
 
of
 
non-compliance
	31
ARTICLE 20 — REPORTING — 
 
PAYMENT
 
REQUESTS
	32
20.1 
Obligation to
 
submit
 
reports
	32
20.2 
Reporting
 
periods
	32
20.3 
Periodic reports — Requests for 
 
interim
 
payments
	32
20.4 
Final report — Request for payment of 
 
the
 
balance
	33
20.5 
Information on cumulative
 
expenditure
 
incurred
	34
20.6 
Currency for financial statements and conversion 
 
into
 
euro
	34
20.7 
Language
 
of
 
reports
	34
20.8 
Consequences
 
of
 
non-compliance
	34
ARTICLE 21 — 
PAYMENTS 
AND
 
PAYMENT
 
ARRANGEMENTS
	34
21.1 
Payments to
 
be
 
made
	34
21.2 
Pre-financing payment — Amount — Amount retained for the
 
Guarantee
 
Fund
	34
21.3 
Interim payments — Amount
 
—
 
Calculation
	35
21.4 
Payment of the balance — Amount — Calculation — Release of the amount retained for the
 
Guarantee
 
Fund
	35
21.5 
Notification of
 
amounts
 
due
	36
21.6 
Currency
 
for
 
payments
	36
21.7 
Payments to the coordinator — Distribution to
 
the
 
beneficiaries
	36
21.8 
Bank account
 
for
 
payments
	37
21.9 
Costs of
 
payment
 
transfers
	37
21.10 
Date
 
of
 
payment
	37
21.11 
Consequences
 
of
 
non-compliance
	37
ARTICLE 22 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF
 
FINDINGS
	38
22.1 
Checks, reviews and audits by 
 
the
 
Commission
	38
22.2 
Investigations by the European Anti-Fraud
 
Office
 
(OLAF)
	40
22.3 
Checks and audits by the European Court of 
 
Auditors
 
(ECA)
	40
22.4 
Checks, reviews, audits and investigations for
 
international
 
organisations
	40
22.5 
Consequences of findings in checks, reviews, audits and investigations — Extension of
 
findings
..............................................................................................................................................................40
22.6 
Consequences
 
of
 
non-compliance
	42
ARTICLE 23 — 
EVALUATION 
OF THE 
IMPACT 
OF 
 
THE
 
ACTION
	42
23.1 
Right to evaluate the impact of 
 
the
 
action
	42
23.2 
Consequences
 
of
 
non-compliance
	42
SECTION 3   RIGHTS AND OBLIGATIONS 
RELATED 
TO BACKGROUND
 
AND 
RESULTS
	
42
SUBSECTION
 
1 
 
GENERAL
	
42
ARTICLE 23a — MANAGEMENT OF
 
INTELLECTUAL
 
PROPERTY
	43
23a.1 Obligation to take measures to implement the Commission Recommendation on the management of
 
intellectual property in knowledge
 
transfer
 
activities
	43
23a.2 Consequences
 
of
 
non-compliance
	43
SUBSECTION 2  RIGHTS AND OBLIGATIONS 
RELATED
 
TO
 
BACKGROUND
	
43
ARTICLE 24 — AGREEMENT
 
ON
 
BACKGROUND
	43
24.1 
Agreement
 
on
 
background
	43
24.2 
Consequences
 
of
 
non-compliance
	43
ARTICLE 25 — ACCESS RIGHTS
 
TO
 
BACKGROUND
	43
25.1 
Exercise of access rights — 
Waiving 
of access rights — 
 
No
 
sub-licensing
	43
25.2 
Access rights for other beneficiaries, for implementing their own tasks under
 
the action
	44
25.3 
Access rights for other beneficiaries, for exploiting their
 
own
 
results
	44
25.4 
Access rights for
 
affiliated
 
entities
	44
25.5 
Access rights for
 
third
 
parties
	45
25.6 
Consequences
 
of
 
non-compliance
	45
SUBSECTION 3  RIGHTS AND OBLIGATIONS 
RELATED
 
TO
 
RESULTS
	
45
ARTICLE 26 — OWNERSHIP
 
OF
 
RESULTS
	
45
26.1 
Ownership by the beneficiary that generates 
 
the
 
results
	45
26.2 
Joint ownership by
 
several
 
beneficiaries
	45
26.3 
Rights of third parties
 
(including
 
personnel)
	46
26.4 
EU ownership, to
 
protect
 
results
	46
26.5 
Consequences
 
of
 
non-compliance
	47
ARTICLE 27 — PROTECTION OF 
RESULTS 
— VISIBILITY OF
 
EU
 
FUNDING
	47
27.1 
Obligation to protect
 
the
 
results
	47
27.2 
EU ownership, to protect 
 
the
 
results
	47
27.3 
Information on
 
EU
 
funding
	47
27.4 
Consequences
 
of
 
non-compliance
	47
ARTICLE 28 — EXPLOITATION
 
OF
 
RESULTS
	
47
28.1 
Obligation to exploit
 
the
 
results
	47
28.2 
Results that could contribute to European or international standards — Information on EU
 
funding
..............................................................................................................................................................48
28.3 
Consequences
 
of
 
non-compliance
	48
ARTICLE 29 — DISSEMINATION OF RESULTS — OPEN ACCESS — VISIBILITY OF EU FUNDING
........................................................................................................................................................ 48
29.1 
Obligation to
 
disseminate
 
results
	48
29.2 
Open access to
 
scientific
 
publications
	49
29.3 
Open access to
 
research
 
data
	49
29.4 
Information on EU funding — Obligation and right to use the 
 
EU
 
emblem
	50
29.5 
Disclaimer excluding
 
Commission
 
responsibility
	50
29.6 
Consequences
 
of
 
non-compliance
	50
ARTICLE 30 — TRANSFER AND LICENSING
 
OF
 
RESULTS
	
50
30.1 
Transfer
 
of
 
ownership
	50
30.2 
Granting
 
licenses
	51
30.3 
Commission right to object to transfers 
 
or
 
licensing
	51
30.4 
Consequences
 
of
 
non-compliance
	52
ARTICLE 31 — ACCESS RIGHTS 
 
TO
 
RESULTS
	
52
31.1 
Exercise of access rights — 
Waiving 
of access rights — 
 
No
 
sub-licensing
	52
31.2 
Access rights for other beneficiaries, for implementing their own tasks under
 
the action
	52
31.3 
Access rights for other beneficiaries, for exploiting their
 
own
 
results
	52
31.4 
Access rights of
 
affiliated
 
entities
	52
31.5 
Access rights for the EU institutions, bodies, offices or agencies and EU
 
Member States
	52
31.6 
Access rights for
 
third
 
parties
	53
31.7 
Consequences
 
of
 
non-compliance
	53
SECTION 4    OTHER RIGHTS
 
AND
 
OBLIGATIONS
	
53
ARTICLE 32 — RECRUITMENT AND WORKING CONDITIONS
 
FOR RESEARCHERS
	53
32.1 
Obligation to take measures to implement the European Charter for Researchers and Code of
 
Conduct for the Recruitment
 
of
 
Researchers
	53
32.2 
Consequences
 
of
 
non-compliance
	53
ARTICLE 33 —
 
GENDER
 
EQUALITY
	53
33.1 
Obligation to aim for 
 
gender
 
equality
	53
33.2 
Consequences
 
of
 
non-compliance
	53
ARTICLE 34 — ETHICS AND
 
RESEARCH
 
INTEGRITY
	54
34.1 
Obligation to comply with ethical and research
 
integrity
 
principles
	54
34.2 
Activities raising
 
ethical
 
issues
	55
34.3 
Activities involving human embryos or human embryonic
 
stem
 
cells
	55
34.4 
Consequences
 
of
 
non-compliance
	56
ARTICLE 35 — CONFLICT
 
OF
 
INTERESTS
	56
35.1 
Obligation to avoid a conflict 
 
of
 
interests
	56
35.2 
Consequences
 
of
 
non-compliance
	56
ARTICLE 36
 
—
 
CONFIDENTIALITY
	56
36.1 
General obligation to
 
maintain
 
confidentiality
	56
36.2 
Consequences
 
of
 
non-compliance
	57
ARTICLE 37 —
 
SECURITY-RELATED
 
OBLIGATIONS
	57
37.1 
Results with a
 
security
 
recommendation
	57
37.2 
Classified
 
results
	57
37.3 
Activities involving dual-use goods or dangerous materials
 
and
 
substances
	57
37.4 
Consequences
 
of
 
non-compliance
	57
ARTICLE 38 — PROMOTING THE ACTION — VISIBILITY OF
 
EU
 
FUNDING
	58
38.1 
Communication activities
 
by
 
beneficiaries
	58
38.2 
Communication activities by
 
the
 
Commission
	58
38.3 
Consequences
 
of
 
non-compliance
	59
ARTICLE 39 — PROCESSING OF
 
PERSONAL
 
DATA
	
60
39.1 
Processing of personal data by 
 
the
 
Commission
	60
39.2 
Processing of personal data by 
 
the
 
beneficiaries
	60
39.3 
Consequences
 
of
 
non-compliance
	60
ARTICLE 40 — ASSIGNMENTS OF CLAIMS FOR 
PAYMENT 
AGAINST
 
THE
 
COMMISSION
	60
CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES — RELATIONSHIP
 
WITH COMPLEMENTARY BENEFICIARIES — RELATIONSHIP WITH 
PARTNERS 
OF A
 
JOINT
 
ACTION
	
61
ARTICLE 41 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES —
 
RELATIONSHIP WITH 
COMPLEMENTARY 
BENEFICIARIES — RELATIONSHIP WITH
 
PARTNERS 
OF A
 
JOINT
 
ACTION
	61
41.1 
Roles and responsibilities towards
 
the
 
Commission
	61
41.2 
Internal division of roles
 
and
 
responsibilities
	61
41.3 
Internal arrangements between beneficiaries —
 
Consortium
 
agreement
	62
41.4 
Relationship with complementary beneficiaries —
 
Collaboration
 
agreement
	62
41.5 
Relationship with partners of a joint action —
 
Coordination
 
agreement
	62
CHAPTER 6   REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — SANCTIONS
— DAMAGES — SUSPENSION — TERMINATION —
 
FORCE
 
MAJEURE
	
63
SECTION 1   REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY —
 
SANCTIONS
	
63
ARTICLE 42 — REJECTION OF
 
INELIGIBLE
 
COSTS
	63
42.1 
Conditions
	63
42.2 
Ineligible costs to be rejected — Calculation 
 
—
 
Procedure
	63
42.3 
Effects
	63
ARTICLE 43 — REDUCTION OF 
 
THE
 
GRANT
	64
43.1 
Conditions
	64
43.2 
Amount to be reduced — Calculation 
 
—
 
Procedure
	64
43.3 
Effects
	64
ARTICLE 44 — RECOVERY OF
 
UNDUE
 
AMOUNTS
	65
10
44.1 Amount to be recovered — Calculation 
 
—
 
Procedure
	65
ARTICLE 45 —
 
ADMINISTRATIVE
 
SANCTIONS
	69
SECTION 2    LIABILITY
 
FOR
 
DAMAGES
	
69
ARTICLE 46 — LIABILITY
 
FOR
 
DAMAGES
	69
46.1 
Liability of
 
the
 
Commission
	69
46.2 
Liability of
 
the
 
beneficiaries
	69
SECTION 3    SUSPENSION
 
AND
 
TERMINATION
	
69
ARTICLE 47 — SUSPENSION OF
 
PAYMENT
 
DEADLINE
	69
47.1 
Conditions
	69
47.2 
Procedure
	69
ARTICLE 48 — SUSPENSION
 
OF
 
PAYMENTS
	
70
48.1 
Conditions
	70
48.2 
Procedure
	70
ARTICLE 49 — SUSPENSION OF THE
 
ACTION
 
IMPLEMENTATION
	71
49.1 
Suspension of the action implementation, by
 
the
 
beneficiaries
	71
49.2 
Suspension of the action implementation, by
 
the
 
Commission
	71
ARTICLE 50 — TERMINATION OF THE AGREEMENT OR OF THE 
PARTICIPATION 
OF ONE OR
 
MORE
 
BENEFICIARIES
	72
50.1 
Termination of the Agreement, by
 
the
 
beneficiaries
	72
50.2 
Termination of the participation of one or more beneficiaries, by
 
the
 
beneficiaries
	73
50.3 
Termination of the Agreement or the participation of one or more beneficiaries, by the
    
Commission
	76
SECTION
 
4
	FORCE
 
MAJEURE
	
80
ARTICLE 51 —
 
FORCE
 
MAJEURE
	80
CHAPTER
 
7
	FINAL
 
PROVISIONS
	
80
ARTICLE 52 — COMMUNICATIONS BETWEEN
 
THE
 
PARTIES
	
80
52.1 
Form and means
 
of
 
communication
	80
52.2 
Date
 
of
 
communication
	81
52.3 
Addresses
 
for
 
communication
	81
ARTICLE 53 — INTERPRETATION OF
 
THE
 
AGREEMENT
	82
53.1 
Precedence of the 
Terms 
and Conditions over 
 
the
 
Annexes
	82
53.2 
Privileges
 
and
 
immunities
	82
ARTICLE 54 — CALCULATION OF PERIODS, 
DATES
 
AND
 
DEADLINES
	82
ARTICLE 55 — AMENDMENTS TO
 
THE
 
AGREEMENT
	82
55.1 
Conditions
	82
55.2 
Procedure
	82
19
ARTICLE 56 — ACCESSION TO
 
THE
 
AGREEMENT
	83
56.1 
Accession of the beneficiaries mentioned in  the
 
Preamble
	83
56.2 
Addition of
 
new
 
beneficiaries
	83
ARTICLE 57 — APPLICABLE 
LAW 
AND SETTLEMENT
 
OF
 
DISPUTES
	83
57.1 
Applicable
 
law
	83
57.2 
Dispute
 
settlement
	83
ARTICLE 58 — 
ENTRY 
INTO FORCE OF 
 
THE
 
AGREEMENT
	84
CHAPTER 1 
 
GENERAL
ARTICLE 1 — SUBJECT OF THE AGREEMENT
This
 
Agreement
 
sets
 
out
 
the
 
rights
 
and
 
obligations
 
and
 
the
 
terms
 
and
 
conditions
 
applicable
 
to
 
the
 
grant awarded to the beneficiaries for implementing the action set out in Chapter
 
2.
CHAPTER 2 
 
ACTION
ARTICLE 2 — ACTION TO BE IMPLEMENTED
The grant is awarded for the action entitled ‘
Data-Driven Bioeconomy 
— 
DataBio
’ 
(‘action’)
, as described in Annex 1.
ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION
The duration of the action will be 
36 months 
as of 1 January 2017 (‘
starting date of the action
’). 
ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS
4.1 
Estimated
 
budget
The ‘
estimated budget
’ for the action is set out in Annex 2.
It
 
contains
 
the
 
estimated
 
eligible
 
costs
 
and
 
the
 
forms
 
of
 
costs,
 
broken
 
down
 
by
 
beneficiary
 
(and
 
linked third party) and budget category (see Articles 5, 6, and 14). It also shows the estimated costs of the beneficiaries not receiving EU funding (see Article
 
9).
4.2 
Budget
 
transfers
The estimated budget breakdown indicated in Annex 2 may be adjusted — without an amendment (see Article 55) — by transfers of amounts between beneficiaries, budget categories and/or forms of costs set out in Annex 2, if the action is implemented as described in Annex 1.
However, the beneficiaries may not add costs relating to subcontracts not provided for in Annex 1, unless such additional subcontracts are approved by an amendment or in accordance with Article 13.
CHAPTER 3 
 
GRANT
ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATES AND FORMS OF COSTS
5.1 
Maximum grant
 
amount
The ‘
maximum grant amount
’ is 
EUR 12,580,486.16 
(twelve million five hundred and eighty thousand four hundred and eighty six EURO and sixteen eurocents).
5.2 
Form of grant, reimbursement rates and forms of
 
costs
The grant reimburses 
100% of the eligible costs of the beneficiaries that are non-profit legal entities and 70% of the eligible costs of the beneficiaries and the linked third parties that are profit legal entities 
(see Article 6) (‘
reimbursement of eligible costs grant
’) (see Annex 2).
The estimated eligible costs of the action are EUR 
15,431,895.03 
(fifteen million four hundred and thirty one thousand eight hundred and ninety five EURO and three eurocents).
Eligible costs (see Article 6) must be declared under the following forms ('
forms of costs
'):
(a) 
for 
direct personnel
 
costs
:
· 
as actually incurred costs (‘
actual costs
’)
 
or
· 
on the basis of an amount per unit calculated by the beneficiary in accordance with its usual cost accounting practices (‘
unit
 
costs
’).
Personnel 
costs for SME owners 
or 
beneficiaries that are natural persons 
not receiving a salary (see Article 6.2, Points A.4 and A.5) must be declared on the basis of the amount per unit set out in Annex 2a (
unit costs
);
(b) 
for 
direct costs for subcontracting
: as actually incurred costs (
actual
 
costs
);
(c) 
for 
direct costs of providing financial support to third parties
: not
 
applicable;
(d) 
for 
other direct costs
: as actually incurred costs (
actual
 
costs
);
(e) 
for
 
indirect
 
costs
:
 
on
 
the
 
basis
 
of
 
a
 
flat-rate
 
applied
 
as
 
set
 
out
 
in
 
Article
 
6.2,
 
Point
 
E
 
(‘
flat-rate costs
’);
(f) 
specific cost category(ies): 
not
 
applicable.
5.3 
Final grant amount —
 
Calculation
The ‘
final grant amount
’ depends on the actual extent to which the action is implemented in accordance with the Agreement’s terms and conditions.
This amount is calculated by the Commission — when the payment of the balance is made (see Article 21.4) — in the following steps:
Step 1 – Application of the reimbursement rates to the eligible costs Step 2  – Limit to the maximum grant amount
Step 3  – Reduction due to the no-profit rule
Step 4  – Reduction due to substantial errors, irregularities or fraud or serious breach of obligations
5.3.1 
Step 1 — Application of the reimbursement rates to the eligible
 
costs
The reimbursement rate(s) (see Article 5.2) are applied to the eligible costs (actual costs, unit costs and
 
flat-rate
 
costs;
 
see
 
Article
 
6)
 
declared
 
by
 
the
 
beneficiaries
 
and
 
linked
 
third
 
parties
 
(see
 
Article
 
20) and approved by the Commission (see Article
 
21).
5.3.2 
Step 2 — Limit to the maximum grant
 
amount
If the amount obtained following Step 1 is higher than the maximum grant amount set out in   Article 5.1, it will be limited to the
 
latter.
5.3.3 
Step 3 — Reduction due to the no-profit
 
rule
The grant must not produce a profit.
‘
Profit
’ means the surplus of the amount obtained following Steps 1 and 2 plus the action’s total receipts, over the action’s total eligible costs.
The ‘
action’s total eligible costs
’ are the consolidated total eligible costs approved by the Commission.
The ‘
action’s total receipts
’ are the consolidated total receipts generated during its duration (see Article 3).
The following are considered 
receipts
:
(a) 
income generated by the action; if the income is generated from selling equipment or other assets
 
purchased
 
under
 
the
 
Agreement,
 
the
 
receipt
 
is
 
up
 
to
 
the
 
amount
 
declared
 
as
 
eligible
 
under the
 
Agreement;
(b) 
financial contributions given by third parties to the beneficiary or to a linked third party specifically to be used for the action,
 
and
(c) 
in-kind
 
contributions
 
provided
 
by
 
third
 
parties
 
free
 
of
 
charge
 
and
 
specifically
 
to
 
be
 
used
 
for
 
the action, if they have been declared as eligible
 
costs.
The following are however not considered receipts:
(a) 
income generated by exploiting the action’s results (see Article
 
28);
(b) 
financial
 
contributions
 
by
 
third
 
parties,
 
if
 
they
 
may
 
be
 
used
 
to
 
cover
 
costs
 
other
 
than
 
the
 
eligible costs (see Article
 
6);
(c) 
financial contributions by third parties with no obligation to repay any amount unused at the end of the period set out in Article
 
3.
If there is a profit, it will be deducted from the amount obtained following Steps 1 and 2.
5.3.4 
Step 4 — Reduction due to substantial errors, irregularities or fraud or serious breach
 
of obligations — Reduced grant amount —
 
Calculation
If the grant is reduced (see Article 43), the Commission will calculate the reduced grant amount     by deducting the amount of the reduction (calculated in proportion to the seriousness of the errors, irregularities or fraud or breach of obligations, in accordance with Article 43.2) from the maximum grant amount set out in Article
 
5.1.
The final grant amount will be the lower of the following two:
· 
the amount obtained following Steps 1 to 3
 
or
· 
the reduced grant amount following Step
 
4.
5.4 
Revised final grant amount —
 
Calculation
If — after the payment of the balance (in particular, after checks, reviews, audits or investigations; see
 
Article
 
22)
 
—
 
the
 
Commission
 
rejects
 
costs
 
(see
 
Article
 
42)
 
or
 
reduces
 
the
 
grant
 
(see
 
Article
 
43), it will calculate the ‘
revised final grant amount
’ for the beneficiary concerned by the
 
findings.
This amount is calculated by the Commission on the basis of the findings, as follows:
· 
in case of 
rejection of costs
: by applying the reimbursement rate to the revised eligible costs approved by the Commission for the beneficiary
 
concerned;
· 
in
 
case
 
of
 
reduction
 
of
 
the
 
grant
:
 
by
 
calculating
 
the
 
concerned
 
beneficiary’s
 
share
 
in
 
the
 
grant amount reduced in proportion to the seriousness of the errors, irregularities or fraud or breach of obligations (see Article
 
43.2).
In case of 
rejection of costs and reduction of the grant
, the revised final grant amount for the beneficiary concerned will be the lower of the two amounts above.
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS
6.1 
General conditions for costs to be
 
eligible
‘
Eligible costs
’ are costs that meet the following criteria:
(a) 
for 
actual
 
costs
:
(i) 
they must be actually incurred by the
 
beneficiary;
(ii) 
they must be incurred in the period set out in Article 3, with the exception of costs relating to the submission of the periodic report for the last reporting period and the final report
 
(see Article
 
20);
(iii) 
they must be indicated in the estimated budget set out in Annex
 
2;
(iv) 
they must be incurred in connection with the action as described in Annex 1 and necessary for its
 
implementation;
(v) 
they must be identifiable and verifiable, in particular recorded in the beneficiary’s accounts in
 
accordance
 
with
 
the
 
accounting
 
standards
 
applicable
 
in
 
the
 
country
 
where
 
the
 
beneficiary is established and with the beneficiary’s usual cost accounting
 
practices;
(vi) 
they must comply with the applicable national law on taxes, labour and social security,
 
and
(vii) 
they must be reasonable, justified and must comply with the principle of sound financial management, in particular regarding economy and
 
efficiency;
(b) 
for 
unit
 
costs
:
(i) 
they must be calculated as
 
follows:
{amounts per unit set out in Annex 2a or calculated by the beneficiary in accordance with its usual cost accounting practices (see Article 6.2, Point A)
multiplied by
the number of actual units};
(ii) 
the number of actual units must comply with the following
 
conditions:
· 
the units must be actually used or produced in the period set out in Article
 
3;
· 
the units must be necessary for implementing the action or produced by it,
 
and
· 
the
 
number
 
of
 
units
 
must
 
be
 
identifiable
 
and
 
verifiable,
 
in
 
particular
 
supported
 
by
 
records and documentation (see Article
 
18);
(c) 
for 
flat-rate
 
costs
:
(i) 
they must be calculated by applying the flat-rate set out in Annex 2,
 
and
(ii) 
the costs (actual costs or unit costs) to which the flat-rate is applied must comply with the conditions for eligibility set out in this
 
Article.
6.2 
Specific conditions for costs to be
 
eligible
Costs are eligible if they comply with the general conditions (see above) and the specific conditions set out below for each of the following budget categories:
A. 
direct personnel
 
costs;
B. 
direct costs of
 
subcontracting;
C. 
not
 
applicable;
D. 
other direct
 
costs;
E. 
indirect
 
costs;
F. 
not
 
applicable.
‘Direct costs’ are costs that are directly linked to the action implementation and can therefore be attributed to it directly. They must not include any indirect costs (see Point E below).
‘Indirect
 
costs’
 
are
 
costs
 
that
 
are
 
not
 
directly
 
linked
 
to
 
the
 
action
 
implementation
 
and
 
therefore
 
cannot be attributed directly to
 
it.
A. 
Direct  personnel  costs 
Types 
of eligible personnel
 
costs
A.1 
Personnel costs are eligible, if they are related to personnel working for the beneficiary under an employment contract (or equivalent appointing act) and assigned to the action (‘
costs for employees
 
(or
 
equivalent)
’).
 
They
 
must
 
be
 
limited
 
to
 
salaries
 
(including
 
during
 
parental
 
leave), social security contributions, taxes and other costs included in the 
remuneration
, if they arise from national law or the employment contract (or equivalent appointing
 
act).
1
 
For
 
the
 
definition,
 
see
 
Article
 
2.1(14)
 
of
 
the
 
Rules
 
for
 
Participation
 
Regulation
 
No
 
1290/2013:
 
‘
non-profit
 
legal
 
entity
’ means a legal entity which by its legal form is non-profit-making or which has a legal or statutory obligation not to distribute profits to its shareholders or individual
 
members.
Beneficiaries that are non-profit legal entities
1 
may also declare as personnel costs 
additional remuneration 
for personnel assigned to the action (including payments on the basis of supplementary contracts regardless of their nature), if:
(a) 
it
 
is
 
part
 
of
 
the
 
beneficiary’s
 
usual
 
remuneration
 
practices
 
and
 
is
 
paid
 
in
 
a
 
consistent
 
manner whenever the same kind of work or expertise is
 
required;
(b) 
the criteria used to calculate the supplementary payments are objective and generally applied by the beneficiary, regardless of the source of funding
 
used.
Additional remuneration for personnel assigned to the action is eligible up to the following amount:
(a) 
if the person works full time and exclusively on the action during the full year: up to EUR 8
 
000;
(b) 
if the person works exclusively on the action but not full-time or not for the full year: up to the corresponding pro-rata amount of EUR 8 000,
 
or
(c) 
if the person does not work exclusively on the action: up to a pro-rata amount calculated as
 
follows:
{
{EUR 8 000
divided by
the number of annual productive hours (see below)}, multiplied by
the number of hours that the person has worked on the action during the year
}
.
A.2 
The
 
costs
 
for
 
natural
 
persons
 
working
 
under
 
a
 
direct
 
contract
 
with
 
the
 
beneficiary
 
other
 
than an employment contract are eligible personnel costs,
 
if:
(a) 
the person works under the beneficiary’s instructions and, unless otherwise agreed with the beneficiary, on the beneficiary’s
 
premises;
(b) 
the result of the work carried out belongs to the beneficiary,
 
and
(c) 
the costs are not significantly different from those for personnel performing similar tasks under an employment contract with the
 
beneficiary.
A.3 
The
 
costs
 
of
 
personnel
 
seconded
 
by
 
a
 
third
 
party
 
against
 
payment
 
are
 
eligible
 
personnel
 
costs, if the conditions in Article 11.1 are
 
met.
A.4 
Costs of owners 
of beneficiaries that are small and medium-sized enterprises (‘
SME owners
’) who are working on the action and who do not receive a salary are eligible personnel costs, if they correspond to the amount per unit set out in Annex 2a multiplied by the number of actual hours worked on the
 
action.
A.5 
Costs of ‘beneficiaries that are natural persons’ 
not receiving a salary are eligible personnel costs, if they correspond to the amount per unit set out in Annex 2a multiplied by the number of actual hours worked on the
 
action.
Calculation
Personnel costs must be calculated by the beneficiaries as follows:
{
{hourly rate multiplied by
the number of actual hours worked on the action}, plus
for non-profit legal entities: additional remuneration to personnel assigned to the action under the conditions set out above (Point A.1)
}
.
The number of actual hours declared for a person must be identifiable and verifiable (see Article 18).
The
 
total
 
number
 
of
 
hours
 
declared
 
in
 
EU
 
or
 
Euratom
 
grants,
 
for
 
a
 
person
 
for
 
a
 
year,
 
cannot
 
be
 
higher than
 
the
 
annual
 
productive
 
hours
 
used
 
for
 
the
 
calculations
 
of
 
the
 
hourly
 
rate.
 
Therefore,
 
the
 
maximum number of hours that can be declared for the grant
 
is:
{the number of annual productive hours for the year (see below) minus
total number of hours declared by the beneficiary for that person in that year for other EU or Euratom grants}.
The ‘
hourly rate
’ is one of the following:
(a) 
for
 
personnel
 
costs
 
declared
 
as
 
actual
 
costs:
 
the
 
hourly
 
rate
 
is
 
calculated
 
per
 
full
 
financial
 
year
, as
 
follows:
{actual annual personnel costs (excluding additional remuneration) for the person divided by
number of annual productive hours}.
using the personnel costs and the number of productive hours for each full financial year covered by the reporting period concerned. If a financial year is not closed at the end of the reporting period, the beneficiaries must use the hourly rate of the last closed financial year available.
For the ‘number of annual productive hours’, the beneficiaries may choose one of the following:
(i) 
‘fixed
 
number
 
of
 
hours’:
 
1
 
720
 
hours
 
for
 
persons
 
working
 
full
 
time
 
(or
 
corresponding
 
pro- rata for persons not working full
 
time);
(ii) 
‘individual annual productive hours’: the total number of hours worked by the person in the year for the beneficiary, calculated as
 
follows:
{annual workable hours of the person (according to the employment contract, applicable collective labour agreement or national law)
plus
overtime worked minus
absences (such as sick leave and special leave)}.
‘Annual workable hours’ means the period during which the personnel must be
 
working, at
 
the
 
employer’s
 
disposal
 
and
 
carrying
 
out
 
his/her
 
activity
 
or
 
duties
 
under
 
the
 
employment contract, applicable collective labour agreement or national working time
 
legislation.
If the contract (or applicable collective labour agreement or national working time legislation) does not allow to determine the annual workable hours, this option cannot  be
 
used;
(iii) 
‘standard annual productive hours’: the ‘standard number of annual hours’ generally applied by the beneficiary for its personnel in accordance with its usual cost accounting practices. This number must be at least 90% of the ‘standard annual workable
 
hours’.
If there is no applicable reference for the standard annual workable hours, this option cannot be used.
For all options, the actual time spent on 
parental leave 
by a person assigned to the action may be deducted from the number of annual productive hours.
As an alternative, beneficiaries may calculate the hourly rate 
per month
, as follows:
{
actual monthly personnel cost (excluding additional remuneration) for the person divided by
{number of annual productive hours / 12}
}
using the personnel costs for each month and (one twelfth of) the annual productive hours calculated according to either option (i) or (iii) above, i.e.:
· 
fixed number of hours
 
or
· 
standard annual productive
 
hours.
Time spent on 
parental leave 
may not be deducted when calculating the hourly rate per month. However, beneficiaries may declare personnel costs incurred in periods of parental leave in proportion to the time the person worked on the action in that financial year.
If parts of a basic remuneration are generated over a period longer than a month, the beneficiaries may include only the share which is generated in the month (irrespective of the amount actually paid for that month).
Each beneficiary must use only one option (per full financial year or per month) for each full financial year;
(b) 
for personnel costs declared on the basis of 
unit costs
: the hourly rate is one of the
 
following:
(i) 
for SME owners or beneficiaries that are natural persons: the hourly rate set out in Annex 2a (see Points A.4 and A.5 above),
 
or
(ii) 
for personnel costs declared on the basis of the beneficiary’s usual cost accounting practices: the hourly rate calculated by the beneficiary in accordance with its usual 
 
cost
accounting
 
practices,
 
if:
	20
Grant Agreement number: 732064 — DataBio — H2020-ICT-2016-2017/H2020-ICT-2016-1
Associated with document Ref. Ares(2016)6013200 - 19/10/2016
· 
the cost accounting practices used are applied in a consistent manner, based on objective criteria, regardless of the source of
 
funding;
· 
the hourly rate is calculated using the actual personnel costs recorded in the beneficiary’s
 
accounts,
 
excluding
 
any
 
ineligible
 
cost
 
or
 
costs
 
included
 
in
 
other
 
budget categories.
The
 
actual
 
personnel
 
costs
 
may
 
be
 
adjusted
 
by
 
the
 
beneficiary
 
on
 
the
 
basis
 
of
 
budgeted or estimated elements. Those elements must be relevant for calculating the
 
personnel costs, reasonable and correspond to objective and verifiable
 
information;
and
· 
the
 
hourly
 
rate
 
is
 
calculated
 
using
 
the
 
number
 
of
 
annual
 
productive
 
hours
 
(see
 
above).
B. 
Direct costs of subcontracting 
(including related duties, taxes and charges such as non- deductible value added tax 
(VAT) 
paid by the beneficiary) are eligible if the conditions in Article 13.1.1 are
 
met.
C. 
Direct costs of providing financial support to third
 
parties
Not applicable
D. 
Other direct
 
costs
D.1 
Travel 
costs and related subsistence allowances 
(including related duties, taxes and charges such as non-deductible value added tax 
(VAT) 
paid by the beneficiary) are eligible if they are
 
in line with the beneficiary’s usual practices on
 
travel.
D.2 
The 
depreciation costs of equipment, infrastructure or other assets 
(new or second-hand)
 
as recorded in the beneficiary’s accounts are eligible, if they were purchased in accordance with Article 10.1.1 and written off in accordance with international accounting standards and the beneficiary’s usual accounting
 
practices.
The
 
costs
 
of
 
renting
 
or
 
leasing
 
equipment,
 
infrastructure
 
or
 
other
 
assets
 
(including
 
related
 
duties, taxes
 
and
 
charges
 
such
 
as
 
non-deductible
 
value
 
added
 
tax
 
(VAT)
 
paid
 
by
 
the
 
beneficiary)
 
are
 
also eligible,
 
if
 
they
 
do
 
not
 
exceed
 
the
 
depreciation
 
costs
 
of
 
similar
 
equipment,
 
infrastructure
 
or
 
assets and do not include any financing
 
fees.
The
 
costs
 
of
 
equipment,
 
infrastructure
 
or
 
other
 
assets
 
contributed
 
in-kind
 
against
 
payment
 
are eligible,
 
if
 
they
 
do
 
not
 
exceed
 
the
 
depreciation
 
costs
 
of
 
similar
 
equipment,
 
infrastructure
 
or
 
assets, do not include any financing fees and if the conditions in Article 11.1 are
 
met.
The only portion of the costs that will be taken into account is that which corresponds to the duration of the action and rate of actual use for the purposes of the action.
D.3 
Costs of other goods and services 
(including related duties, taxes and charges such as non- deductible value added tax 
(VAT) 
paid by the beneficiary) are eligible, if they
 
are:
(a) 
purchased specifically for the action and in accordance with Article 10.1.1
 
or
(b) 
contributed in kind against payment and in accordance with Article
 
11.1.
29
Such goods and services include, for instance, consumables and supplies, dissemination (including
 
open
 
access),
 
protection
 
of
 
results,
 
certificates
 
on
 
the
 
financial
 
statements
 
(if
 
they
 
are required by the Agreement), certificates on the methodology, translations and
 
publications.
D.4 
Capitalised
 
and
 
operating
 
costs
 
of
 
‘large
 
research
 
infrastructure’
2
 
directly
 
used
 
for
 
the
 
action are eligible,
 
if:
(a) 
the
 
value
 
of
 
the
 
large
 
research
 
infrastructure
 
represents
 
at
 
least
 
75%
 
of
 
the
 
total
 
fixed
 
assets (at historical value in its last closed balance sheet before the date of the signature of the Agreement or as determined on the basis of the rental and leasing costs of the research infrastructure
3
);
(b) 
the
 
beneficiary’s
 
methodology
 
for
 
declaring
 
the
 
costs
 
for
 
large
 
research
 
infrastructure
 
has been positively assessed by the Commission (‘
ex-ante
 
assessment
’);
(c) 
the beneficiary declares as direct eligible costs only the portion which corresponds to the duration of the action and the rate of actual use for the purposes of the action,
 
and
(d) 
they comply with the conditions as further detailed in the annotations to the H2020 grant agreements.
E. 
Indirect
 
costs
Indirect
 
costs
 
are
 
eligible
 
if
 
they
 
are
 
declared
 
on
 
the
 
basis
 
of
 
the
 
flat-rate
 
of
 
25%
 
of
 
the
 
eligible
 
direct costs (see Article 5.2 and Points A to D above), from which are
 
excluded:
(a) 
costs of subcontracting
 
and
(b) 
costs
 
of
 
in-kind
 
contributions
 
provided
 
by
 
third
 
parties
 
which
 
are
 
not
 
used
 
on
 
the
 
beneficiary’s premises;
(c) 
not
 
applicable;
(d) 
not
 
applicable.
Beneficiaries receiving an operating grant
4 
financed by the EU or Euratom budget cannot declare indirect costs for the period covered by the operating grant.
2 
‘
Large research infrastructure
’ means research infrastructure of a total value of at least EUR 20 million, for a beneficiary,
 
calculated
 
as
 
the
 
sum
 
of
 
historical
 
asset
 
values
 
of
 
each
 
individual
 
research
 
infrastructure
 
of
 
that
 
beneficiary, as
 
they
 
appear
 
in
 
its
 
last
 
closed
 
balance
 
sheet
 
before
 
the
 
date
 
of
 
the
 
signature
 
of
 
the
 
Agreement
 
or
 
as
 
determined
 
on
 
the basis of the rental and leasing costs of the research
 
infrastructure.
3 
For the definition, see Article 2(6) of the H2020 Framework Programme Regulation No 1291/2013: ‘
Research infrastructure
’
 
are
 
facilities,
 
resources
 
and
 
services
 
that
 
are
 
used
 
by
 
the
 
research
 
communities
 
to
 
conduct
 
research
 
and foster
 
innovation
 
in
 
their
 
fields.
 
Where
 
relevant,
 
they
 
may
 
be
 
used
 
beyond
 
research,
 
e.g.
 
for
 
education
 
or
 
public
 
services. They include: major scientific equipment (or sets of instruments); knowledge-based resources such as collections, archives
 
or
 
scientific
 
data;
 
e-infrastructures
 
such
 
as
 
data
 
and
 
computing
 
systems
 
and
 
communication
 
networks;
 
and
 
any other infrastructure of a unique nature essential to achieve excellence in research and innovation. Such infrastructures may be ‘single-sited’, ‘virtual’ or
 
‘distributed’.
4 
For the definition, see Article 121(1)(b) of Regulation (EU, Euratom) No 966/2012 of the European Parliament and  of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing Council
 
Regulation
 
(EC,
 
Euratom)
 
No
 
1605/2002
 
(‘
Financial
 
Regulation
 
No
 
966/2012
’)(OJ
 
L
 
218,
 
26.10.2012,
 
p.1): ‘
operating
 
grant
’
 
means
 
direct
 
financial
 
contribution,
 
by
 
way
 
of
 
donation,
 
from
 
the
 
budget
 
in
 
order
 
to
 
finance
 
the
F. 
Specific cost
 
category(ies)
Not applicable
6.3 
Conditions for costs of linked third parties to be
 
eligible
Costs incurred by linked third parties 
are eligible if they fulfil — mutatis mutandis — the general and specific conditions for eligibility set out in this Article (Article 6.1 and 6.2) and Article 14.1.1.
6.4 
Conditions for in-kind contributions provided by third parties free of charge to be
 
eligible
In-kind
 
contributions
 
provided
 
free
 
of
 
charge
 
are
 
eligible
 
direct
 
costs
 
(for
 
the
 
beneficiary
 
or
 
linked third party), if the costs incurred by the third party fulfil — 
mutatis mutandis 
— the general and specific conditions for eligibility set out in this Article (Article 6.1 and 6.2) and Article
 
12.1.
6.5 
Ineligible
 
costs
‘
Ineligible costs
’ are:
(a) 
costs that do not comply with the conditions set out above (Article 6.1 to 6.4), in
 
particular:
(i) 
costs related to return on
 
capital;
(ii) 
debt and debt service
 
charges;
(iii) 
provisions for future losses or
 
debts;
(iv) 
interest
 
owed;
(v) 
doubtful
 
debts;
(vi) 
currency exchange
 
losses;
(vii) 
bank costs charged by the beneficiary’s bank for transfers from the
 
Commission;
(viii) 
excessive or reckless
 
expenditure;
(ix) 
deductible
 
VAT;
(x) 
costs incurred during suspension of the implementation of the action (see Article
 
49);
(b) 
costs declared under another EU or Euratom grant (including grants awarded by a Member State and financed by the EU or Euratom budget and grants awarded by bodies other than the Commission
 
for
 
the
 
purpose
 
of
 
implementing
 
the
 
EU
 
or
 
Euratom
 
budget);
 
in
 
particular,
 
indirect costs if the beneficiary is already receiving an operating grant financed by the EU or Euratom budget in the same
 
period.
6.6 
Consequences of declaration of ineligible
 
costs
Declared costs that are ineligible will be rejected (see Article 42).
This may also lead to any of the other measures described in Chapter 6.
functioning of a body which pursues an aim of general EU interest or has an objective forming part of and supporting an EU policy.
CHAPTER 4   RIGHTS AND OBLIGATIONS OF THE PARTIES
SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE ACTION
ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION
7.1 
General obligation to properly implement the
 
action
The beneficiaries must implement the action as described in Annex 1 and in compliance with the provisions
 
of
 
the
 
Agreement
 
and
 
all
 
legal
 
obligations
 
under
 
applicable
 
EU,
 
international
 
and
 
national 
law.
7.2 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTIES INVOLVED IN THE ACTION
The beneficiaries must have the appropriate resources to implement the action. If it is necessary to implement the action, the beneficiaries may:
· 
purchase goods, works and services (see Article
 
10);
· 
use in-kind contributions provided by third parties against payment (see Article
 
11);
· 
use in-kind contributions provided by third parties free of charge (see Article
 
12);
· 
call upon subcontractors to implement action tasks described in Annex 1 (see Article
 
13);
· 
call upon linked third parties to implement action tasks described in Annex 1 (see Article
 
14).
In these cases, the beneficiaries retain sole responsibility towards the Commission and the other beneficiaries for implementing the action.
ARTICLE 9 — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT RECEIVING EU FUNDING
9.1 
Rules for the implementation of action tasks by beneficiaries not receiving EU
 
funding
Beneficiaries
 
not
 
receiving
 
EU
 
funding
 
must
 
implement
 
the
 
action
 
tasks
 
attributed
 
to
 
them
 
in
 
Annex
 
1 according to Article
 
7.1.
Their costs are estimated in Annex 2 but:
· 
will not be reimbursed
 
and
· 
will not be taken into account for the calculation of the grant (see Articles 5.2, 5.3 and 5.4, and
 
21).
Chapter 3, Articles 10 to 15, 18.1.2, 20.3(b), 20.4(b), 20.6, 21, 23a, 26.4, 27.2, 28.1, 28.2, 30.3, 31.5,
40, 42, 43, 44, 47 and 48 do not apply to these beneficiaries.
They will not be subject to financial checks, reviews and audits under Article 22.
Beneficiaries not receiving EU funding may provide in-kind contributions to another beneficiary. In this case, they will be considered as a third party for the purpose of Articles 11 and 12.
9.2 
Consequences of
 
non-compliance
If a beneficiary not receiving EU funding breaches any of its obligations under this Article, its participation in the Agreement may be terminated (see Article 50).
Such breaches may also lead to any of the other measures described in Chapter 6 that are applicable to it.
ARTICLE 10 — PURCHASE OF GOODS, WORKS OR SERVICES
10.1 
Rules for purchasing goods, works or
 
services
10.1.1 
If
 
necessary
 
to
 
implement
 
the
 
action,
 
the
 
beneficiaries
 
may
 
purchase
 
goods,
 
works
 
or
 
services.
The beneficiaries must make such purchases ensuring the best value for money 
or, 
if appropriate,
 
the lowest price. In doing so, they must avoid any conflict of interests (see Article
 
35).
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards their contractors.
10.1.2 
Beneficiaries that are ‘contracting authorities’ within the meaning of Directives 2004/18/EC
5 
(or 2014/24/EC
6
) or ‘contracting entities’ within the meaning of Directive 2004/17/EC
7 
(or 2014/25/EC
8
) must comply with the applicable national law on public
 
procurement.
10.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under Article 10.1.1, the costs related to the contract concerned will be ineligible (see Article 6) and will be rejected (see Article 42).
If a beneficiary breaches any of its obligations under Article 10.1.2, the grant may be reduced (see Article 43).
5 
Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public work contracts, public supply contracts and public service contracts (OJ L 134, 30.04.2004, p. 114).
6 
Directive 2014/24/EU of the European Parliament and of the Council of 26 February 2014 on public procurement and repealing Directive 2004/18/EC. (OJ L 94, 28.03.2014, p. 65).
7 
Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement procedures of entities operating in the water, 
energy, 
transport and postal services sectors (OJ L 134, 30.04.2004, p. 1)
8 
Directive 2014/25/EU of the European Parliament and of the Council of 26 February 2014 on procurement by entities operating in the water, energy, transport and postal services sectors and repealing Directive 2004/17/EC (OJ L 94, 28.03.2014, p. 243).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 11 — USE OF IN-KIND CONTRIBUTIONS PROVIDED BY THIRD PARTIES AGAINST PAYMENT
11.1 
Rules for the use of in-kind contributions against
 
payment
If
 
necessary
 
to
 
implement
 
the
 
action,
 
the
 
beneficiaries
 
may
 
use
 
in-kind
 
contributions
 
provided
 
by
 
third parties against
 
payment.
The beneficiaries may declare costs related to the payment of in-kind contributions as eligible (see Article 6.1 and 6.2), up to the third parties’ costs for the seconded persons, contributed equipment, infrastructure or other assets or other contributed goods and services.
The third parties and their contributions must be set out in Annex 1. The Commission may however approve in-kind contributions not set out in Annex 1 without amendment (see Article 55), if:
· 
they are specifically justified in the periodic technical report
 
and
· 
their
 
use
 
does
 
not
 
entail
 
changes
 
to
 
the
 
Agreement
 
which
 
would
 
call
 
into
 
question
 
the
 
decision awarding the grant or breach the principle of equal treatment of
 
applicants.
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards the third parties.
11.2 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the costs related to the payment of the in-kind contribution will be ineligible (see Article 6) and will be rejected (see Article 42).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 12 — USE OF IN-KIND CONTRIBUTIONS PROVIDED BY THIRD PARTIES FREE OF CHARGE
12.1 
Rules for the use of in-kind contributions free of
 
charge
If
 
necessary
 
to
 
implement
 
the
 
action,
 
the
 
beneficiaries
 
may
 
use
 
in-kind
 
contributions
 
provided
 
by
 
third parties free of
 
charge.
The
 
beneficiaries
 
may
 
declare
 
costs
 
incurred
 
by
 
the
 
third
 
parties
 
for
 
the
 
seconded
 
persons,
 
contributed equipment, infrastructure or other assets or other contributed goods and services as eligible in accordance with Article
 
6.4.
The third parties and their contributions must be set out in Annex 1. The Commission may however approve in-kind contributions not set out in Annex 1 without amendment (see Article 55), if:
· 
they are specifically justified in the periodic technical report
 
and
· 
their
 
use
 
does
 
not
 
entail
 
changes
 
to
 
the
 
Agreement
 
which
 
would
 
call
 
into
 
question
 
the
 
decision awarding the grant or breach the principle of equal treatment of
 
applicants.
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards the third parties.
12.2 
Consequences of
 
non-compliance
If
 
a
 
beneficiary
 
breaches
 
any
 
of
 
its
 
obligations
 
under
 
this
 
Article,
 
the
 
costs
 
incurred
 
by
 
the
 
third
 
parties related
 
to
 
the
 
in-kind
 
contribution
 
will
 
be
 
ineligible
 
(see
 
Article
 
6)
 
and
 
will
 
be
 
rejected
 
(see
 
Article
 
42).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 13 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS
13.1 
Rules for subcontracting action
 
tasks
13.1.1 
If necessary to implement the action, the beneficiaries may award subcontracts covering the implementation of certain action tasks described in Annex
 
1.
Subcontracting may cover only a limited part of the action.
The beneficiaries must award the subcontracts ensuring the best value for money or, if appropriate, the lowest price. In doing so, they must avoid any conflict of interests (see Article 35).
The
 
tasks
 
to
 
be
 
implemented
 
and
 
the
 
estimated
 
cost
 
for
 
each
 
subcontract
 
must
 
be
 
set
 
out
 
in
 
Annex
 
1
 
and the
 
total
 
estimated
 
costs
 
of
 
subcontracting
 
per
 
beneficiary
 
must
 
be
 
set
 
out
 
in
 
Annex
 
2.
 
The
 
Commission may however approve subcontracts not set out in Annex 1 and 2 without amendment (see Article 55),
 
if:
· 
they are specifically justified in the periodic technical report
 
and
· 
they do not entail changes to the Agreement which would call into question the decision awarding the grant or breach the principle of equal treatment of
 
applicants.
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards their subcontractors.
13.1.2 
The
 
beneficiaries
 
must
 
ensure
 
that
 
their
 
obligations
 
under
 
Articles
 
35,
 
36,
 
38
 
and
 
46
 
also
 
apply to the
 
subcontractors.
Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC (or 2014/24/EU) or ‘contracting entities’ within the meaning of Directive 2004/17/EC (or 2014/25/EU) must comply with the applicable national law on public procurement.
13.2 Consequences of non-compliance
If
 
a
 
beneficiary
 
breaches
 
any
 
of
 
its
 
obligations
 
under
 
Article
 
13.1.1,
 
the
 
costs
 
related
 
to
 
the
 
subcontract concerned will be ineligible (see Article 6) and will be rejected (see Article
 
42).
If a beneficiary breaches any of its obligations under Article 13.1.2, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 14 — IMPLEMENTATION OF ACTION TASKS BY LINKED THIRD PARTIES
14.1 
Rules for calling upon linked third parties to implement part of the
 
action
14.1.1 
The
 
following
 
affiliated
 
entities
10 
 
and
 
third
 
parties
 
with
 
a
 
legal
 
link
 
to
 
a
 
beneficiary
11
(‘
linked third parties
’) may implement the action tasks attributed to them in Annex 1:
· 
INTRASOFT 
INTERNATIONAL 
SA (INTRA-LU), affiliated or linked to
 
INTRASOFT
· 
TECNOLOGIAS Y 
SERVICIOS 
AGRARIOS, S.A. 
(TRAGSATEC), 
affiliated or linked to TRAGSA
The linked third parties may declare as eligible the costs they incur for implementing the action tasks in accordance with Article 6.3.
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards their linked third parties.
14.1.2 
The beneficiaries must ensure that their obligations under Articles 18, 20, 35, 36 and 38
 
also apply to their linked third
 
parties.
14.2 Consequences of non-compliance
If any obligation under Article 14.1.1 is breached, the costs of the linked third party will be ineligible (see Article 6) and will be rejected (see Article 42).
If any obligation under Article 14.1.2 is breached, the grant may be reduced (see Article 43). Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 15 — FINANCIAL SUPPORT TO THIRD PARTIES
15.1 
Rules for providing financial support to third
 
parties
Not applicable
10 
For the definition, see Article 2.1(2) of the Rules for Participation Regulation No 1290/2013: '
affiliated entity
' means any legal entity that is:
· 
under the direct or indirect control of a participant,
 
or
· 
under the same direct or indirect control as the participant,
 
or
· 
directly or indirectly controlling a participant. ‘Control’ may take any of the following
 
forms:
(a) 
the
 
direct
 
or
 
indirect
 
holding
 
of
 
more
 
than
 
50%
 
of
 
the
 
nominal
 
value
 
of
 
the
 
issued
 
share
 
capital
 
in
 
the
 
legal
 
entity concerned, or of a majority of the voting rights of the shareholders or associates of that
 
entity;
(b) 
the direct or indirect holding, in fact or in 
law, 
of decision-making powers in the legal entity concerned. However the following relationships between legal entities shall not in themselves be deemed to constitute
 
controlling relationships:
(a) 
the
 
same
 
public
 
investment
 
corporation,
 
institutional
 
investor
 
or
 
venture-capital
 
company
 
has
 
a
 
direct
 
or
 
indirect holding of more than 50% of the nominal value of the issued share capital or a majority of voting rights of the shareholders or
 
associates;
(b) 
the legal entities concerned are owned or supervised by the same public
 
body.
11 
‘
Third party with a legal link to a beneficiary
’ is any legal entity which has a legal link to the beneficiary implying collaboration that is not limited to the action.
15.2 
Financial support in the form of
 
prizes
Not applicable
15.3 
Consequences of
 
non-compliance
Not applicable
ARTICLE 16 — PROVISION OF TRANS-NATIONAL OR VIRTUAL ACCESS TO RESEARCH INFRASTRUCTURE
16.1 
Rules for providing trans-national access to research
 
infrastructure
Not applicable
16.2 
Rules for providing virtual access to research
 
infrastructure
Not applicable
16.3 
Consequences of
 
non-compliance
Not applicable
SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT ADMINISTRATION
ARTICLE 17 — GENERAL OBLIGATION TO INFORM
17.1 
General obligation to provide information upon
 
request
The
 
beneficiaries
 
must
 
provide
 
—
 
during
 
implementation
 
of
 
the
 
action
 
or
 
afterwards
 
and
 
in
 
accordance with Article 41.2 — any information requested in order to verify eligibility of the costs, proper implementation of the action and compliance with any other obligation under the
 
Agreement.
17.2 
Obligation to keep information up to date and to inform about events and
 
circumstances likely to affect the
 
Agreement
Each beneficiary must keep information stored in the Participant Portal Beneficiary Register (via  the electronic exchange system; see Article 52) up to date, in particular, its name, address, legal representatives, legal form and organisation
 
type.
Each beneficiary must immediately inform the coordinator — which must immediately inform the Commission and the other beneficiaries — of any of the following:
(a) 
events 
which are likely to affect significantly or delay the implementation of the action or the EU's financial interests, in
 
particular:
(i) 
changes
 
in
 
its
 
legal,
 
financial,
 
technical,
 
organisational
 
or
 
ownership
 
situation
 
or
 
those
 
of its linked third parties
 
and
(ii) 
changes in the name, address, legal form, organisation type of its linked third
 
parties;
(b) 
circumstances
 
affecting:
(i) 
the decision to award the grant
 
or
(ii) 
compliance with requirements under the
 
Agreement.
17.3 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 18 — KEEPING RECORDS — SUPPORTING DOCUMENTATION
18.1 
Obligation to keep records and other supporting
 
documentation
The beneficiaries must — for a period of five years after the payment of the balance — keep
 
records and other supporting documentation in order to prove the proper implementation of the action and the costs they declare as
 
eligible.
They must make them available upon request (see Article 17) or in the context of checks, reviews, audits or investigations (see Article 22).
If
 
there
 
are
 
on-going
 
checks,
 
reviews,
 
audits,
 
investigations,
 
litigation
 
or
 
other
 
pursuits
 
of
 
claims
 
under the Agreement (including the extension of findings; see Articles 22), the beneficiaries must keep the records and other supporting documentation until the end of these
 
procedures.
The
 
beneficiaries
 
must
 
keep
 
the
 
original
 
documents.
 
Digital
 
and
 
digitalised
 
documents
 
are
 
considered originals if they are authorised by the applicable national 
law. 
The Commission may accept non- original documents if it considers that they offer a comparable level of
 
assurance.
18.1.1 
Records and other supporting documentation on the scientific and technical implementation
The beneficiaries must keep records and other supporting documentation on scientific and technical implementation of the action in line with the accepted standards in the respective field.
18.1.2 
Records and other documentation to support the costs
 
declared
The
 
beneficiaries
 
must
 
keep
 
the
 
records
 
and
 
documentation
 
supporting
 
the
 
costs
 
declared,
 
in
 
particular the
 
following:
(a) 
for 
actual costs
: adequate records and other supporting documentation to prove the costs declared, such as contracts, subcontracts, invoices and accounting records. In addition, the beneficiaries'
 
usual
 
cost
 
accounting
 
practices
 
and
 
internal
 
control
 
procedures
 
must
 
enable
 
direct reconciliation between the amounts declared, the amounts recorded in their accounts and the amounts stated in the supporting
 
documentation;
(b) 
for 
unit costs
: adequate records and other supporting documentation to prove the number of units
 
declared.
 
Beneficiaries
 
do
 
not
 
need
 
to
 
identify
 
the
 
actual
 
eligible
 
costs
 
covered
 
or
 
to
 
keep or provide supporting documentation (such as accounting statements) to prove the amount
 
per unit.
30
In addition, 
for direct personnel costs declared as unit costs calculated in accordance with
 
the
 
beneficiary's
 
usual
 
cost
 
accounting
 
practices
,
 
the
 
beneficiaries
 
must
 
keep
 
adequate records and documentation to prove that the cost accounting practices used comply with the conditions set out in Article 6.2, Point
 
A.
The beneficiaries and linked third parties may submit to the Commission, for approval, a certificate (drawn up in accordance with Annex 6) stating that their usual cost accounting practices comply with these conditions (‘
certificate on the methodology
’). If the certificate is
 
approved,
 
costs
 
declared
 
in
 
line
 
with
 
this
 
methodology
 
will
 
not
 
be
 
challenged
 
subsequently, unless the beneficiaries have concealed information for the purpose of the
 
approval.
(c) 
for
 
flat-rate
 
costs
:
 
adequate
 
records
 
and
 
other
 
supporting
 
documentation
 
to
 
prove
 
the
 
eligibility of
 
the
 
costs
 
to
 
which
 
the
 
flat-rate
 
is
 
applied.
 
The
 
beneficiaries
 
do
 
not
 
need
 
to
 
identify
 
the
 
costs covered or provide supporting documentation (such as accounting statements) to prove the amount declared at a
 
flat-rate.
In
 
addition,
 
for
 
personnel
 
costs
 
(declared
 
as
 
actual
 
costs
 
or
 
on
 
the
 
basis
 
of
 
unit
 
costs),
 
the
 
beneficiaries must keep 
time records 
for the number of hours declared. The time records must be in writing and approved
 
by
 
the
 
persons
 
working
 
on
 
the
 
action
 
and
 
their
 
supervisors,
 
at
 
least
 
monthly.
 
In
 
the
 
absence of reliable time records of the hours worked on the action, the Commission may accept alternative evidence supporting the number of hours declared, if it considers that it offers an adequate level of assurance.
As
 
an
 
exception,
 
for
 
persons
 
working
 
exclusively
 
on
 
the
 
action
,
 
there
 
is
 
no
 
need
 
to
 
keep
 
time
 
records, if
 
the
 
beneficiary
 
signs
 
a
 
declaration
 
confirming
 
that
 
the
 
persons
 
concerned
 
have
 
worked
 
exclusively on the
 
action.
For costs declared by linked third parties (see Article 14), it is the beneficiary that must keep the originals
 
of
 
the
 
financial
 
statements
 
and
 
the
 
certificates
 
on
 
the
 
financial
 
statements
 
of
 
the
 
linked
 
third parties.
18.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, costs insufficiently substantiated will be ineligible (see Article 6) and will be rejected (see Article 42), and the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 19 — SUBMISSION OF DELIVERABLES
19.1 
Obligation to submit
 
deliverables
The coordinator must submit the ‘
deliverables
’ identified in Annex 1, in accordance with the
 
timing and conditions set out in
 
it.
19.2 
Consequences of
 
non-compliance
If the coordinator breaches any of its obligations under this Article, the Commission may apply any of the measures described in Chapter 6.
39
ARTICLE 20 — REPORTING — PAYMENT REQUESTS
20.1 
Obligation to submit
 
reports
The coordinator must submit to the Commission (see Article 52) the technical and financial reports set out in this Article. These reports include requests for payment and must be drawn up using the forms and templates provided in the electronic exchange system (see Article 52).
20.2 
Reporting
 
periods
The action is divided into the following ‘
reporting periods
’:
· 
RP1: from month 1 to month
 
18
· 
RP2: from month 19 to month
 
36
20.3 
Periodic reports — Requests for interim
 
payments
The coordinator must submit a periodic report within 60 days following the end of each reporting period.
The 
periodic report 
must include the following:
(a) 
a ‘
periodic technical report
’
 
containing:
(i) 
an 
explanation of the work carried out 
by the
 
beneficiaries;
(ii) 
an
 
overview
 
of
 
the
 
progress
 
towards
 
the
 
objectives
 
of
 
the
 
action,
 
including
 
milestones
 
and deliverables identified in Annex
 
1.
This report must include explanations justifying the differences between work expected to be carried out in accordance with Annex 1 and that actually carried out.
The
 
report
 
must
 
detail
 
the
 
exploitation
 
and
 
dissemination
 
of
 
the
 
results
 
and
 
—
 
if
 
required
 
in Annex 1 — an updated ‘
plan for the exploitation and dissemination of the
 
results
’.
The report must indicate the communication activities;
(iii) 
a 
summary 
for publication by the
 
Commission;
(iv) 
the answers to the ‘
questionnaire
’, covering issues related to the action implementation and the economic and societal impact, notably in the context of the Horizon 2020 key performance indicators and the Horizon 2020 monitoring
 
requirements;
(b) 
a ‘
periodic financial report
’
 
containing:
(i) 
an ‘
individual financial statement
’ (see Annex 4) from each beneficiary and from each linked third party, for the reporting period
 
concerned.
The individual financial statement must detail the eligible costs (actual costs, unit costs
 
and flat-rate costs; see Article 6) for each budget category (see Annex
 
2).
The
 
beneficiaries
 
and
 
linked
 
third
 
parties
 
must
 
declare
 
all
 
eligible
 
costs,
 
even
 
if
 
—
 
for
 
actual costs, unit costs and flat-rate costs — they exceed the amounts indicated in the estimated budget
 
(see
 
Annex
 
2).
 
Amounts
 
which
 
are
 
not
 
declared
 
in
 
the
 
individual
 
financial
 
statement will not be taken into account by the
 
Commission.
If
 
an
 
individual
 
financial
 
statement
 
is
 
not
 
submitted
 
for
 
a
 
reporting
 
period,
 
it
 
may
 
be
 
included in the periodic financial report for the next reporting
 
period.
The individual financial statements of the last reporting period must also detail the 
receipts of the action 
(see Article 5.3.3).
Each beneficiary and each linked third party must 
certify 
that:
· 
the information provided is full, reliable and
 
true;
· 
the costs declared are eligible (see Article
 
6);
· 
the
 
costs
 
can
 
be
 
substantiated
 
by
 
adequate
 
records
 
and
 
supporting
 
documentation
 
(see Article 18) that will be produced upon request (see Article 17) or in the context of checks, reviews, audits and investigations (see Article 22),
 
and
· 
for the last reporting period: that  all  the  receipts  have  been  declared  (see  Article
 
5.3.3);
(ii) 
an 
explanation of the use of resources 
and the information on  subcontracting  (see Article
 
13)
 
and
 
in-kind
 
contributions
 
provided
 
by
 
third
 
parties
 
(see
 
Articles
 
11
 
and
 
12)
 
from each beneficiary and from each linked third party, for the reporting period
 
concerned;
(iii) 
not
 
applicable;
(iv) 
a ‘
periodic summary financial statement
’, created automatically by the electronic exchange system, consolidating the individual financial statements for the reporting period concerned and including — except for the last reporting period — the 
request for interim payment
.
20.4 
Final report — Request for payment of the
 
balance
In addition to the periodic report for the last reporting period, the coordinator must submit the final report within 60 days following the end of the last reporting period.
The 
final report 
must include the following:
(a) 
a ‘
final technical report
’ with a 
summary 
for publication
 
containing:
(i) 
an overview of the results and their exploitation and
 
dissemination;
(ii) 
the conclusions on the action,
 
and
(iii) 
the socio-economic impact of the
 
action;
(b) 
a ‘
final financial report
’
 
containing:
(i) 
a ‘
final summary financial statement
’, created automatically by the electronic exchange system, consolidating the individual financial statements for all reporting periods and including the 
request for payment of the balance
 
and
(ii) 
a
 
‘
certificate
 
on
 
the
 
financial
 
statements
’
 
(drawn
 
up
 
in
 
accordance
 
with
 
Annex
 
5)
 
for
 
each beneficiary
 
and
 
for
 
each
 
linked
 
third
 
party,
 
if
 
it
 
requests
 
a
 
total
 
contribution
 
of
 
EUR
 
325
 
000
or more, as reimbursement of actual costs and unit costs calculated on the basis of its usual cost accounting practices (see Article 5.2 and Article 6.2, Point A).
20.5 
Information on cumulative expenditure
 
incurred
Not applicable
20.6 
Currency for financial statements and conversion into
 
euro
Financial statements must be drafted in euro.
Beneficiaries and linked third parties with accounting established in a currency other than the euro must convert the costs recorded in their accounts into euro, at the average of the daily exchange rates published in the C series of the 
Official Journal of the European Union
, calculated over the corresponding reporting
 
period.
If no daily euro exchange rate is published in the 
Official Journal of the European Union 
for the currency
 
in
 
question,
 
they
 
must
 
be
 
converted
 
at
 
the
 
average
 
of
 
the
 
monthly
 
accounting
 
rates
 
published on the Commission’s website, calculated over the corresponding reporting
 
period.
Beneficiaries and linked third parties with accounting established in euro must convert costs incurred in another currency into euro according to their usual accounting practices.
20.7 
Language of
 
reports
All reports (technical and financial reports, including financial statements) must be submitted in the language of the Agreement.
20.8 
Consequences of
 
non-compliance
If the reports submitted do not comply with this Article, the Commission may suspend the payment deadline (see Article 47) and apply any of the other measures described in Chapter 6.
If the coordinator breaches its obligation to submit the reports and if it fails to comply with this obligation
 
within
 
30
 
days
 
following
 
a
 
written
 
reminder,
 
the
 
Commission
 
may
 
terminate
 
the
 
Agreement (see Article 50) or apply any of the other measures described in Chapter
 
6.
ARTICLE 21 — PAYMENTS AND PAYMENT ARRANGEMENTS
21.1 
Payments to be
 
made
The following payments will be made to the coordinator:
· 
one 
pre-financing
 
payment
;
· 
one or more 
interim payments
, on the basis of the request(s) for interim payment (see  Article 20),
 
and
· 
one 
payment of the balance
, on the basis of the request for payment of the balance (see Article
 
20).
21.2 
Pre-financing payment — Amount — Amount retained for the Guarantee
 
Fund
The aim of the pre-financing is to provide the beneficiaries with a float.
It remains the property of the EU until the payment of the balance.
The
 
amount
 
of
 
the
 
pre-financing
 
payment
 
will
 
be
 
EUR
 
10,064,388.93
 
(ten
 
million
 
sixty
 
four
 
thousand three hundred and eighty eight EURO and ninety three
 
eurocents).
The Commission will — except if Article 48 applies — make the pre-financing payment to the coordinator
 
within
 
30
 
days,
 
either
 
from
 
the
 
entry
 
into
 
force
 
of
 
the
 
Agreement
 
(see
 
Article
 
58)
 
or
 
from 10 days before the starting date of the action (see Article 3), whichever is the
 
latest.
An amount of EUR 
629,024.31 
(six hundred and twenty nine thousand twenty four EURO and
 
thirty one eurocents), corresponding to 5% of the maximum grant amount (see Article 5.1), is retained by the Commission from the pre-financing payment and transferred into the ‘
Guarantee
 
Fund
’.
21.3 
Interim payments — Amount —
 
Calculation
Interim payments reimburse the eligible costs incurred for the implementation of the action during the corresponding reporting periods.
The
 
Commission
 
will
 
pay
 
to
 
the
 
coordinator
 
the
 
amount
 
due
 
as
 
interim
 
payment
 
within
 
90
 
days
 
from receiving the periodic report (see Article 20.3), except if Articles 47 or 48
 
apply.
Payment is subject to the approval of the periodic report. Its approval does not imply recognition of the compliance, authenticity, completeness or correctness of its content.
The 
amount due as interim payment 
is calculated by the Commission in the following steps: Step 1 – Application of the reimbursement rates
Step 2 – Limit to 90% of the maximum grant amount
21.3.1 
Step 1 — Application of the reimbursement
 
rates
The
 
reimbursement
 
rate(s)
 
(see
 
Article
 
5.2)
 
are
 
applied
 
to
 
the
 
eligible
 
costs
 
(actual
 
costs,
 
unit
 
costs
 
and flat-rate
 
costs
 
;
 
see
 
Article
 
6)
 
declared
 
by
 
the
 
beneficiaries
 
and
 
the
 
linked
 
third
 
parties
 
(see
 
Article
 
20) and approved by the Commission (see above) for the concerned reporting
 
period.
21.3.2 
Step 2 — Limit to 90% of the maximum grant
 
amount
The
 
total
 
amount
 
of
 
pre-financing
 
and
 
interim
 
payments
 
must
 
not
 
exceed
 
90%
 
of
 
the
 
maximum
 
grant amount set out in Article 5.1. The maximum amount for the interim payment will be calculated as follows:
{
90% of the maximum grant amount (see Article 5.1) minus
{pre-financing and previous interim payments}
}
.
21.4 
Payment of the balance — Amount — Calculation — Release of the amount retained
 
for the Guarantee
 
Fund
The payment of the balance reimburses the remaining part of the eligible costs incurred by the beneficiaries for the implementation of the action.
If the total amount of earlier payments is greater than the final grant amount (see Article 5.3), the payment of the balance takes the form of a recovery (see Article 44).
If
 
the
 
total
 
amount
 
of
 
earlier
 
payments
 
is
 
lower
 
than
 
the
 
final
 
grant
 
amount,
 
the
 
Commission
 
will
 
pay the balance within 90 days from receiving the final report (see Article 20.4), except if Articles 47   or 48
 
apply.
Payment is subject to the approval of the final report. Its approval does not imply recognition of the compliance, authenticity, completeness or correctness of its content.
The 
amount due as the balance 
is calculated by the Commission by deducting the total amount of pre-financing and interim payments (if any) already made, from the final grant amount determined in accordance with Article 5.3:
{
final grant amount (see Article 5.3) minus
{pre-financing and interim payments (if any) made}
}
.
At
 
the
 
payment
 
of
 
the
 
balance,
 
the
 
amount
 
retained
 
for
 
the
 
Guarantee
 
Fund
 
(see
 
above)
 
will
 
be
 
released and:
· 
if the balance is positive: the amount released will be paid in full to the coordinator together with the amount due as the
 
balance;
· 
if the balance is negative (payment of the balance taking the form of recovery): it will be deducted from the amount released (see Article 44.1.2). If the resulting
 
amount:
· 
is positive, it will be paid to the
 
coordinator
· 
is negative, it will be
 
recovered.
The amount to be paid may however be offset — without the beneficiaries' consent — against any other amount owed by a beneficiary to the Commission or an executive agency (under the EU or Euratom
 
budget),
 
up
 
to
 
the
 
maximum
 
EU
 
contribution
 
indicated,
 
for
 
that
 
beneficiary,
 
in
 
the
 
estimated budget (see Annex
 
2).
21.5 
Notification of amounts
 
due
When making payments, the Commission will formally notify to the coordinator the amount due, specifying whether it concerns an interim payment or the payment of the balance.
For the payment of the balance, the notification will also specify the final grant amount.
In the case of reduction of the grant or recovery of undue amounts, the notification will be preceded by the contradictory procedure set out in Articles 43 and 44.
21.6 
Currency for
 
payments
The Commission will make all payments in euro.
21.7 
Payments to the coordinator — Distribution to the
 
beneficiaries
Payments will be made to the coordinator.
Payments to the coordinator will discharge the Commission from its payment obligation.
The coordinator must distribute the payments between the beneficiaries without unjustified delay. Pre-financing may however be distributed only:
(a) 
if the minimum number of beneficiaries set out in the call for proposals has acceded to the Agreement (see Article 56)
 
and
(b) 
to beneficiaries that have acceded to the Agreement (see Article
 
56).
21.8 
Bank account for
 
payments
All payments will be made to the following bank account:
Name of bank: BNP PARIBAS FORTIS (FORTIS BANK SA/NV)
Full name of the account holder: INTRASOFT 
INTERNATIONAL 
Full account number (including bank codes):
 
()
IBAN code: BE53210069520053
21.9 
Costs of payment
 
transfers
The cost of the payment transfers is borne as follows:
· 
the Commission bears the cost of transfers charged by its
 
bank;
· 
the beneficiary bears the cost of transfers charged by its
 
bank;
· 
the party causing a repetition of a transfer bears all costs of the repeated
 
transfer.
21.10 
Date of
 
payment
Payments by the Commission are considered to have been carried out on the date when they are debited to its account.
21.11 
Consequences of
 
non-compliance
21.11.1 
If the Commission does not pay within the payment deadlines (see above), the beneficiaries are entitled to 
late-payment interest 
at the rate applied by the European Central Bank (ECB) for its main
 
refinancing
 
operations
 
in
 
euros
 
(‘reference
 
rate’),
 
plus
 
three
 
and
 
a
 
half
 
points.
 
The
 
reference
 
rate is the rate in force on the first day of the month in which the payment deadline expires, as published in the C series of the 
Official Journal of the European
 
Union
.
If the late-payment interest is lower than or equal to EUR 200, it will be paid to the coordinator only upon request submitted within two months of receiving the late payment.
Late-payment interest is not due if all beneficiaries are EU Member States (including regional and local
 
government
 
authorities
 
or
 
other
 
public
 
bodies
 
acting
 
on
 
behalf
 
of
 
a
 
Member
 
State
 
for
 
the
 
purpose of this
 
Agreement).
Suspension of the payment deadline or payments (see Articles 47 and 48) will not be considered as late payment.
Late-payment
 
interest
 
covers
 
the
 
period
 
running
 
from
 
the
 
day
 
following
 
the
 
due
 
date
 
for
 
payment
 
(see above), up to and including the date of
 
payment.
Late-payment interest is not considered for the purposes of calculating the final grant amount.
21.11.2 
If
 
the
 
coordinator
 
breaches
 
any
 
of
 
its
 
obligations
 
under
 
this
 
Article,
 
the
 
grant
 
may
 
be
 
reduced (see Article 43) and the Agreement or the participation of the coordinator may be terminated (see Article
 
50).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 22 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF FINDINGS
22.1 
Checks, reviews and audits by the
 
Commission
22.1.1 
Right to carry out
 
checks
The Commission will — during the implementation of the action or afterwards — check the proper implementation of the action and compliance with the obligations under the Agreement, including assessing deliverables and reports.
For this purpose the Commission may be assisted by external persons or bodies.
The Commission may also request additional information in accordance with Article 17. The Commission may request beneficiaries to provide such information to it directly.
Information provided must be accurate, precise and complete and in the format requested, including electronic format.
22.1.2 
Right to carry out
 
reviews
The Commission may — during the implementation of the action or afterwards — carry out reviews on the proper implementation of the action (including assessment of deliverables and reports), compliance with the obligations under the Agreement and continued scientific or technological relevance of the action.
Reviews may be started 
up to two years after the payment of the balance
. They will be formally notified
 
to
 
the
 
coordinator
 
or
 
beneficiary
 
concerned
 
and
 
will
 
be
 
considered
 
to
 
have
 
started
 
on
 
the
 
date of the formal
 
notification.
If the review is carried out on a third party (see Articles 10 to 16), the beneficiary concerned must inform the third party.
The Commission may carry out reviews directly (using its own staff) or indirectly (using external persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned of the identity
 
of
 
the
 
external
 
persons
 
or
 
bodies.
 
They
 
have
 
the
 
right
 
to
 
object
 
to
 
the
 
appointment
 
on
 
grounds of commercial
 
confidentiality.
The coordinator or beneficiary concerned must provide — within the deadline requested — any information
 
and
 
data
 
in
 
addition
 
to
 
deliverables
 
and
 
reports
 
already
 
submitted
 
(including
 
information on the use of resources). The Commission may request beneficiaries to provide such information to it
 
directly.
The
 
coordinator
 
or
 
beneficiary
 
concerned
 
may
 
be
 
requested
 
to
 
participate
 
in
 
meetings,
 
including
 
with external
 
experts.
For
 
on-the-spot
 
reviews,
 
the
 
beneficiaries
 
must
 
allow
 
access
 
to
 
their
 
sites
 
and
 
premises,
 
including
 
to external persons or bodies, and must ensure that information requested is readily
 
available.
Information provided must be accurate, precise and complete and in the format requested, including electronic format.
On the basis of the review findings, a ‘
review report
’ will be drawn up.
The Commission will formally notify the review report to the coordinator or beneficiary concerned, which has 30 days to formally notify observations (‘
contradictory review procedure
’).
Reviews (including review reports) are in the language of the Agreement.
22.1.3 
Right to carry out
 
audits
The
 
Commission
 
may
 
—
 
during
 
the
 
implementation
 
of
 
the
 
action
 
or
 
afterwards
 
—
 
carry
 
out
 
audits
 
on the proper implementation of the action and compliance with the obligations under the
 
Agreement.
Audits may be started 
up to two years after the payment of the balance
. They will be formally notified
 
to
 
the
 
coordinator
 
or
 
beneficiary
 
concerned
 
and
 
will
 
be
 
considered
 
to
 
have
 
started
 
on
 
the
 
date of the formal
 
notification.
If the audit is carried out on a third party (see Articles 10 to 16), the beneficiary concerned must inform the third party.
The Commission may carry out audits directly (using its own staff) or indirectly (using external persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned of the identity
 
of
 
the
 
external
 
persons
 
or
 
bodies.
 
They
 
have
 
the
 
right
 
to
 
object
 
to
 
the
 
appointment
 
on
 
grounds of commercial
 
confidentiality.
The coordinator or beneficiary concerned must provide — within the deadline requested — any information (including complete accounts, individual salary statements or other personal data) to verify compliance with the Agreement. The Commission may request beneficiaries to provide such information to it directly.
For 
on-the-spot 
audits, the beneficiaries must allow access to their sites and premises, including to external persons or bodies, and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including electronic format.
On the basis of the audit findings, a ‘
draft audit report
’ will be drawn up.
The
 
Commission
 
will
 
formally
 
notify
 
the
 
draft
 
audit
 
report
 
to
 
the
 
coordinator
 
or
 
beneficiary
 
concerned, which has 30 days to formally notify observations (‘
contradictory audit procedure
’). This period may be extended by the Commission in justified
 
cases.
The ‘
final audit report
’ will take into account observations by the coordinator or beneficiary concerned. The report will be formally notified to it.
Audits (including audit reports) are in the language of the Agreement.
The Commission may also access the beneficiaries’ statutory records for the periodical assessment of unit costs or flat-rate amounts.
22.2 
Investigations by the European Anti-Fraud Office
 
(OLAF)
Under Regulations No 883/2013
14 
and No 2185/96
15 
(and in accordance with their provisions and procedures),
 
the
 
European
 
Anti-Fraud
 
Office
 
(OLAF)
 
may
 
—
 
at
 
any
 
moment
 
during
 
implementation of the action or afterwards — carry out investigations, including on-the-spot checks and
 
inspections, to
 
establish
 
whether
 
there
 
has
 
been
 
fraud,
 
corruption
 
or
 
any
 
other
 
illegal
 
activity
 
affecting
 
the
 
financial interests of the
 
EU.
22.3 
Checks and audits by the European Court of Auditors
 
(ECA)
Under Article 287 of the Treaty on the Functioning of the European Union (TFEU) and Article 161 of the Financial Regulation No 966/2012
16
, the European Court of Auditors (ECA) may — at any moment during implementation of the action or afterwards — carry out audits.
The ECA has the right of access for the purpose of checks and audits.
22.4 
Checks, reviews, audits and investigations for international
 
organisations
Not applicable
22.5 
Consequences of findings in checks, reviews, audits and investigations — Extension
 
of findings
22.5.1 
Findings in this
 
grant
Findings in checks, reviews, audits or investigations carried out in the context of this grant may lead to
 
the
 
rejection
 
of
 
ineligible
 
costs
 
(see
 
Article
 
42),
 
reduction
 
of
 
the
 
grant
 
(see
 
Article
 
43),
 
recovery
 
of undue amounts (see Article 44) or to any of the other measures described in Chapter
 
6.
Rejection
 
of
 
costs
 
or
 
reduction
 
of
 
the
 
grant
 
after
 
the
 
payment
 
of
 
the
 
balance
 
will
 
lead
 
to
 
a
 
revised
 
final grant amount (see Article
 
5.4).
Findings in checks, reviews, audits or investigations may lead to a request for amendment for the modification of Annex 1 (see Article 55).
Checks,
 
reviews,
 
audits
 
or
 
investigations
 
that
 
find
 
systemic
 
or
 
recurrent
 
errors,
 
irregularities,
 
fraud
 
or breach of obligations may also lead to consequences in other EU or Euratom grants awarded under similar conditions (‘
extension of findings from this grant to other
 
grants
’).
14 
Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013 concerning investigations conducted by the European Anti-Fraud Office (OLAF) and repealing Regulation (EC) No 1073/1999
 
of
 
the
 
European
 
Parliament
 
and
 
of
 
the
 
Council
 
and
 
Council
 
Regulation
 
(Euratom)
 
No
 
1074/1999
 
(OJ
 
L
 
248, 18.09.2013, p. 1).
15
 
Council
 
Regulation
 
(Euratom,
 
EC)
 
No
 
2185/1996
 
of
 
11
 
November
 
1996
 
concerning
 
on-the-spot
 
checks
 
and
 
inspections carried
 
out
 
by
 
the
 
Commission
 
in
 
order
 
to
 
protect
 
the
 
European
 
Communities'
 
financial
 
interests
 
against
 
fraud
 
and
 
other irregularities (OJ L 292, 15.11.1996, p.
 
2).
16 
Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing Council Regulation (EC, Euratom) No 1605/2002 (OJ L 298, 26.10.2012, p. 1).
40
Moreover, findings arising from an OLAF investigation may lead to criminal prosecution under national law.
22.5.2 
Findings in other
 
grants
The Commission may extend findings from other grants to this grant (‘
extension of findings from other grants to this grant
’), if:
(a) 
the beneficiary concerned is found, in other EU or Euratom grants awarded under similar conditions, to have committed systemic or recurrent errors, irregularities, fraud or breach of obligations that have a material impact on this grant
 
and
(b) 
those findings are formally notified to the beneficiary concerned — together with the list of grants affected by the findings — no later than two years after the payment of the balance of this
 
grant.
The extension of findings may lead to the rejection of costs (see Article 42), reduction of the grant (see
 
Article
 
43),
 
recovery
 
of
 
undue
 
amounts
 
(see
 
Article
 
44),
 
suspension
 
of
 
payments
 
(see
 
Article
 
48), suspension of the action implementation (see Article 49) or termination (see Article
 
50).
22.5.3 
Procedure
The Commission will formally notify the beneficiary concerned the systemic or recurrent errors and its intention to extend these audit findings, together with the list of grants affected.
22.5.3.1 
If the findings concern 
eligibility of costs
: the formal notification will
 
include:
(a) 
an invitation to submit observations on the list of grants affected by the
 
findings;
(b) 
the request to submit 
revised financial statements 
for all grants
 
affected;
(c) 
the 
correction rate for extrapolation 
established by the Commission on the basis of the systemic
 
or
 
recurrent
 
errors,
 
to
 
calculate
 
the
 
amounts
 
to
 
be
 
rejected
 
if
 
the
 
beneficiary
 
concerned:
(i) 
considers
 
that
 
the
 
submission
 
of
 
revised
 
financial
 
statements
 
is
 
not
 
possible
 
or
 
practicable or
(ii) 
does not submit revised financial
 
statements.
The beneficiary concerned has 90 days from receiving notification to submit observations, revised financial statements or to propose a duly substantiated 
alternative correction method
. This period may be extended by the Commission in justified cases.
The Commission may then start a rejection procedure in accordance with Article 42, on the basis of:
· 
the revised financial statements, if
 
approved;
· 
the proposed alternative correction method, if
 
accepted or
· 
the initially notified correction rate for extrapolation, if it does not receive any observations or revised financial statements, does not accept the observations or the proposed alternative correction method or does not approve the revised financial
 
statements.
49
22.5.3.2 
If the findings concern 
substantial errors
, 
irregularities or fraud 
or 
serious breach of obligations
: the formal notification will
 
include:
(a) 
an invitation to submit observations on the list of grants affected by the findings
 
and
(b) 
the flat-rate the Commission intends to apply according to the principle of
 
proportionality.
The beneficiary concerned has 90 days from receiving notification to submit observations or to propose a duly substantiated alternative flat-rate.
The Commission may then start a reduction procedure in accordance with Article 43, on the basis of:
· 
the proposed alternative flat-rate, if
 
accepted or
· 
the initially notified flat-rate, if it does not receive any observations or does not accept the observations or the proposed alternative
 
flat-rate.
22.6 Consequences of non-compliance
If
 
a
 
beneficiary
 
breaches
 
any
 
of
 
its
 
obligations
 
under
 
this
 
Article,
 
any
 
insufficiently
 
substantiated
 
costs will be ineligible (see Article 6) and will be rejected (see Article
 
42).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 23 — EVALUATION OF THE IMPACT OF THE ACTION
23.1 
Right to evaluate the impact of the
 
action
The Commission may carry out interim and final evaluations of the impact of the action measured against the objective of the EU programme.
Evaluations
 
may
 
be
 
started
 
during
 
implementation
 
of
 
the
 
action
 
and
 
up
 
to
 
five
 
years
 
after
 
the
 
payment of the balance. The evaluation is considered to start on the date of the formal notification to the coordinator or
 
beneficiaries.
The
 
Commission
 
may
 
make
 
these
 
evaluations
 
directly
 
(using
 
its
 
own
 
staff)
 
or
 
indirectly
 
(using
 
external bodies or persons it has authorised to do
 
so).
The coordinator or beneficiaries must provide any information relevant to evaluate the impact of the action, including information in electronic format.
23.2 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the Commission may apply the measures described in Chapter 6.
SECTION 3 RIGHTS AND OBLIGATIONS RELATED TO BACKGROUND AND RESULTS
SUBSECTION 1
 
GENERAL
ARTICLE 23a — MANAGEMENT OF INTELLECTUAL PROPERTY
23a.1 Obligation to take measures to implement the Commission Recommendation on the management of intellectual property in knowledge transfer activities
Beneficiaries that are universities or other public research organisations must take measures to implement
 
the
 
principles
 
set
 
out
 
in
 
Points
 
1
 
and
 
2
 
of
 
the
 
Code
 
of
 
Practice
 
annexed
 
to
 
the
 
Commission Recommendation on the management of intellectual property in knowledge transfer
 
activities
17
.
This does not change the obligations set out in Subsections 2 and 3 of this Section.
The beneficiaries must ensure that researchers and third parties involved in the action are aware of them.
23a.2 Consequences of non-compliance
If a beneficiary breaches its obligations under this Article, the Commission may apply any of the measures described in Chapter 6.
SUBSECTION 2 RIGHTS AND OBLIGATIONS RELATED TO BACKGROUND 
ARTICLE 24 — AGREEMENT ON BACKGROUND
24.1 
Agreement on
 
background
The beneficiaries must identify and agree (in writing) on the background for the action (‘
agreement on background
’).
‘
Background
’ means any data, know-how or information — whatever its form or nature (tangible or intangible), including any rights such as intellectual property rights — that:
(a) 
is held by the beneficiaries before they acceded to the Agreement,
 
and
(b) 
is needed to implement the action or exploit the
 
results.
24.2 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 25 — ACCESS RIGHTS TO BACKGROUND
25.1 
Exercise of access rights — Waiving of access rights — No
 
sub-licensing
To exercise access rights, this must first be requested in writing (‘
request for access
’).
17 
Commission Recommendation C(2008) 1329 of 10.4.2008 on the management of intellectual property in knowledge transfer activities and the Code of Practice for universities and other public research institutions attached to this recommendation.
‘
Access rights
’ means rights to use results or background under the terms and conditions laid down in this Agreement.
Waivers of access rights are not valid unless in writing.
Unless agreed otherwise, access rights do not include the right to sub-license.
25.2 
Access rights for other beneficiaries, for implementing their own tasks under the
 
action
The beneficiaries must give each other access — on a royalty-free basis — to background needed to implement their own tasks under the action, unless the beneficiary that holds the background has — before acceding to the Agreement —:
(a) 
informed the other beneficiaries that access to its background is subject to legal restrictions
 
or limits, including those imposed by the rights of third parties (including personnel),
 
or
(b) 
agreed with the other beneficiaries that access would not be on a royalty-free
 
basis.
25.3 
Access rights for other beneficiaries, for exploiting their own
 
results
The beneficiaries must give each other access — under fair and reasonable conditions — to background needed for exploiting their own results, unless the beneficiary that holds the
 
background has — before acceding to the Agreement — informed the other beneficiaries that access to its background is subject to legal restrictions or limits, including those imposed by the rights of third parties (including
 
personnel).
‘
Fair and reasonable conditions
’ means appropriate conditions, including possible financial terms or
 
royalty-free
 
conditions,
 
taking
 
into
 
account
 
the
 
specific
 
circumstances
 
of
 
the
 
request
 
for
 
access,
 
for example
 
the
 
actual
 
or
 
potential
 
value
 
of
 
the
 
results
 
or
 
background
 
to
 
which
 
access
 
is
 
requested
 
and/or the scope, duration or other characteristics of the exploitation
 
envisaged.
Requests for access may be made — unless agreed otherwise — up to one year after the period set out in Article 3.
25.4 
Access rights for affiliated
 
entities
Unless otherwise agreed in the consortium agreement, access to background must also be given
· 
under fair and reasonable conditions (see above; Article 25.3) and unless it is subject to legal restrictions or limits, including those imposed by the rights of third parties (including personnel) — to affiliated entities
18 
established in an EU Member State or ‘
associated country
’
19
, if this is needed to exploit the results generated by the beneficiaries to which they are
 
affiliated.
Unless agreed otherwise (see above; Article 25.1), the affiliated entity concerned must make the request directly to the beneficiary that holds the background.
Requests for access may be made — unless agreed otherwise — up to one year after the period set out in Article 3.
18  
For the definition, see ‘affiliated entity’ footnote (Article 14.1).
19 
For the definition, see Article 2.1(3) of the Rules for Participation Regulation No 1290/2013: ‘
associated country
’ means
 
a
 
third
 
country
 
which
 
is
 
party
 
to
 
an
 
international
 
agreement
 
with
 
the
 
Union,
 
as
 
identified
 
in
 
Article
 
7
 
of
 
Horizon 2020 Framework Programme Regulation No 1291/2013. Article 7 sets out the conditions for association of non-EU countries to Horizon
 
2020.
25.5 
Access rights for third
 
parties
Not applicable
25.6 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6. 
SUBSECTION 3 RIGHTS AND OBLIGATIONS 
RELATED TO 
RESULTS 
ARTICLE 26 — OWNERSHIP OF 
RESULTS
26.1 
Ownership by the beneficiary that generates the
 
results
Results are owned by the beneficiary that generates them.
‘
Results
’ means any (tangible or intangible) output of the action such as data, knowledge or information — whatever its form or nature, whether it can be protected or not — that is generated in the action, as well as any rights attached to it, including intellectual property rights.
26.2 
Joint ownership by several
 
beneficiaries
Two or more beneficiaries own results jointly if:
(a) 
they have jointly generated them
 
and
(b) 
it is not possible
 
to:
(i) 
establish the respective contribution of each beneficiary,
 
or
(ii) 
separate them for the purpose of applying 
for, 
obtaining or maintaining their protection (see Article
 
27).
The
 
joint
 
owners
 
must
 
agree
 
(in
 
writing)
 
on
 
the
 
allocation
 
and
 
terms
 
of
 
exercise
 
of
 
their
 
joint
 
ownership (‘
joint ownership agreement
’), to ensure compliance with their obligations under this
 
Agreement.
Unless
 
otherwise
 
agreed
 
in
 
the
 
joint
 
ownership
 
agreement,
 
each
 
joint
 
owner
 
may
 
grant
 
non-exclusive licences
 
to
 
third
 
parties
 
to
 
exploit
 
jointly-owned
 
results
 
(without
 
any
 
right
 
to
 
sub-license),
 
if
 
the
 
other joint owners are
 
given:
(a) 
at least 45 days advance notice
 
and
(b) 
fair and reasonable
 
compensation.
Once the results have been generated, joint owners may agree (in writing) to apply another regime than joint ownership (such as, for instance, transfer to a single owner (see Article 30) with access rights for the others).
26.3 
Rights of third parties (including
 
personnel)
If third parties (including personnel) may claim rights to the results, the beneficiary concerned must ensure that it complies with its obligations under the Agreement.
If a third party generates results, the beneficiary concerned must obtain all necessary rights
 
(transfer, licences or other) from the third 
party, 
in order to be able to respect its obligations as if those results were generated by the beneficiary
 
itself.
If
 
obtaining
 
the
 
rights
 
is
 
impossible,
 
the
 
beneficiary
 
must
 
refrain
 
from
 
using
 
the
 
third
 
party
 
to
 
generate the
 
results.
26.4 
EU ownership, to protect
 
results
26.4.1 
The
 
EU
 
may
 
—
 
with
 
the
 
consent
 
of
 
the
 
beneficiary
 
concerned
 
—
 
assume
 
ownership
 
of
 
results to protect them, if a beneficiary intends — up to four years after the period set out in Article 3 — to disseminate its results without protecting them, except in any of the following
 
cases:
(a) 
the lack of protection is because protecting the results is not possible, reasonable or justified (given the
 
circumstances);
(b) 
the lack of protection is because there is a lack of potential for commercial or industrial exploitation,
 
or
(c) 
the beneficiary intends to transfer the results to another beneficiary or third party established in an EU Member State or associated country, which will protect
 
them.
Before the results are disseminated and unless any of the cases above under Points (a), (b) or (c) applies, the beneficiary must formally notify the Commission and at the same time inform it of any reasons
 
for
 
refusing
 
consent.
 
The
 
beneficiary
 
may
 
refuse
 
consent
 
only
 
if
 
it
 
can
 
show
 
that
 
its
 
legitimate interests would suffer significant
 
harm.
If the Commission decides to assume ownership, it will formally notify the beneficiary concerned within 45 days of receiving notification.
No dissemination relating to these results may take place before the end of this period or, if the Commission takes a positive decision, until it has taken the necessary steps to protect the results.
26.4.2 
The
 
EU
 
may
 
—
 
with
 
the
 
consent
 
of
 
the
 
beneficiary
 
concerned
 
—
 
assume
 
ownership
 
of
 
results to protect them, if a beneficiary intends — up to four years after the period set out in Article 3 — to stop protecting them or not to seek an extension of protection, except in any of the following
 
cases:
(a) 
the
 
protection
 
is
 
stopped
 
because
 
of
 
a
 
lack
 
of
 
potential
 
for
 
commercial
 
or
 
industrial
 
exploitation;
(b) 
an extension would not be justified given the
 
circumstances.
A beneficiary that intends to stop protecting results or not seek an extension must — unless any of the cases above under Points (a) or (b) applies — formally notify the Commission at least 60 days before
 
the
 
protection
 
lapses
 
or
 
its
 
extension
 
is
 
no
 
longer
 
possible
 
and
 
at
 
the
 
same
 
time
 
inform
 
it
 
of
 
any reasons
 
for
 
refusing
 
consent.
 
The
 
beneficiary
 
may
 
refuse
 
consent
 
only
 
if
 
it
 
can
 
show
 
that
 
its
 
legitimate interests would suffer significant
 
harm.
If the Commission decides to assume ownership, it will formally notify the beneficiary concerned within 45 days of receiving notification.
26.5 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to the any of the other measures described in Chapter 6.
ARTICLE 27 — PROTECTION OF RESULTS — VISIBILITY OF EU FUNDING
27.1 
Obligation to protect the
 
results
Each beneficiary must examine the possibility of protecting its results and must adequately protect them — for an appropriate period and with appropriate territorial coverage — if:
(a) 
the results can reasonably be expected to be commercially or industrially exploited
 
and
(b) 
protecting them is possible, reasonable and justified (given the
 
circumstances).
When deciding on protection, the beneficiary must consider its own legitimate interests and the legitimate interests (especially commercial) of the other beneficiaries.
27.2 
EU ownership, to protect the
 
results
If a beneficiary intends not to protect its results, to stop protecting them or not seek an extension of protection,
 
the
 
EU
 
may
 
—
 
under
 
certain
 
conditions
 
(see
 
Article
 
26.4)
 
—
 
assume
 
ownership
 
to
 
ensure their (continued)
 
protection.
27.3 
Information on EU
 
funding
Applications for protection of results (including patent applications) filed by or on behalf of a beneficiary must — unless the Commission requests or agrees otherwise or unless it is impossible
· 
include the
 
following:
“The project leading to this application has received funding from the 
European Union’s Horizon 2020 research and innovation programme  
under grant agreement No 732064”.
27.4 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 28 — EXPLOITATION OF RESULTS
28.1 
Obligation to exploit the
 
results
Each
 
beneficiary
 
must
 
—
 
up
 
to
 
four
 
years
 
after
 
the
 
period
 
set
 
out
 
in
 
Article
 
3
 
—
 
take
 
measures
 
aiming to ensure ‘
exploitation
’ of its results (either directly or indirectly, in particular through transfer or licensing; see Article 30)
 
by:
(a) 
using them in further research activities (outside the
 
action);
(b) 
developing, creating or marketing a product or
 
process;
(c) 
creating and providing a service,
 
or
(d) 
using them in standardisation
 
activities.
This does not change the security obligations in Article 37, which still apply.
28.2 
Results that could contribute to European or international standards — Information
 
on EU
 
funding
If results are incorporated in a standard, the beneficiary concerned must — unless the Commission requests or agrees otherwise or unless it is impossible — ask the standardisation body to include the following statement in (information related to) the standard:
“Results incorporated in this standard received funding from the 
European Union’s Horizon 2020 research and innovation programme  
under grant agreement No 732064”.
28.3 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced in accordance with Article 43.
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 29 — DISSEMINATION OF RESULTS — OPEN ACCESS — VISIBILITY OF EU FUNDING
29.1 
Obligation to disseminate
 
results
Unless it goes against their legitimate interests, each beneficiary must — as soon as possible — ‘
disseminate
’ its results by disclosing them to the public by appropriate means (other than those resulting from protecting or exploiting the results), including in scientific publications (in any medium).
This does not change the obligation to protect results in Article 27, the confidentiality obligations in Article
 
36,
 
the
 
security
 
obligations
 
in
 
Article
 
37
 
or
 
the
 
obligations
 
to
 
protect
 
personal
 
data
 
in
 
Article
 
39, all of which still
 
apply.
A
 
beneficiary
 
that
 
intends
 
to
 
disseminate
 
its
 
results
 
must
 
give
 
advance
 
notice
 
to
 
the
 
other
 
beneficiaries of — unless agreed otherwise — at least 45 days, together with sufficient information on the results it will
 
disseminate.
Any other beneficiary may object within — unless agreed otherwise — 30 days of receiving notification, if it can show that its legitimate interests in relation to the results or background would be
 
significantly
 
harmed.
 
In
 
such
 
cases,
 
the
 
dissemination
 
may
 
not
 
take
 
place
 
unless
 
appropriate
 
steps are taken to safeguard these legitimate
 
interests.
If a beneficiary intends not to protect its results, it may — under certain conditions (see Article 26.4.1)
· 
need to formally notify the Commission before dissemination takes
 
place.
29.2 
Open access to scientific
 
publications
Each beneficiary must ensure open access (free of charge online access for any user) to all peer-reviewed scientific publications relating to its results.
In particular, it must:
(a) 
as soon as possible and at the latest on publication, deposit a machine-readable electronic copy of the published version or final peer-reviewed manuscript accepted for publication in a repository for scientific
 
publications;
Moreover, the beneficiary must aim to deposit at the same time the research data needed to validate the results presented in the deposited scientific publications.
(b) 
ensure open access to the deposited publication — via the repository — at the
 
latest:
(i) 
on publication, if an electronic version is available for free via the publisher,
 
or
(ii) 
within six months of publication (twelve months for publications in the social sciences and humanities) in any other
 
case.
(c) 
ensure open access — via the repository — to the bibliographic metadata that identify the deposited
 
publication.
The bibliographic metadata must be in a standard format and must include all of the following:
· 
the terms “European Union (EU)” and “Horizon
 
2020”;
· 
the name of the action, acronym and grant
 
number;
· 
the publication date, and length of embargo period if applicable,
 
and
· 
a persistent
 
identifier.
29.3 
Open access to research
 
data
Regarding the digital research data generated in the action (‘
data
’), the beneficiaries must:
(a) 
deposit in a research data repository and take measures to make it possible for third parties to access,
 
mine,
 
exploit,
 
reproduce
 
and
 
disseminate
 
—
 
free
 
of
 
charge
 
for
 
any
 
user
 
—
 
the
 
following:
(i) 
the data, including associated metadata, needed to validate the results presented in scientific publications as soon as
 
possible;
(ii) 
other
 
data,
 
including
 
associated
 
metadata,
 
as
 
specified
 
and
 
within
 
the
 
deadlines
 
laid
 
down in the 'data management plan' (see Annex
 
1);
(b) 
provide information — via the repository — about tools and instruments at the disposal of
 
the beneficiaries and necessary for validating the results (and — where possible — provide the tools and instruments
 
themselves).
This does not change the obligation to protect results in Article 27, the confidentiality obligations in Article
 
36,
 
the
 
security
 
obligations
 
in
 
Article
 
37
 
or
 
the
 
obligations
 
to
 
protect
 
personal
 
data
 
in
 
Article
 
39, all of which still
 
apply.
As
 
an
 
exception,
 
the
 
beneficiaries
 
do
 
not
 
have
 
to
 
ensure
 
open
 
access
 
to
 
specific
 
parts
 
of
 
their
 
research data
 
if
 
the
 
achievement
 
of
 
the
 
action's
 
main
 
objective,
 
as
 
described
 
in
 
Annex
 
1,
 
would
 
be
 
jeopardised by
 
making
 
those
 
specific
 
parts
 
of
 
the
 
research
 
data
 
openly
 
accessible.
 
In
 
this
 
case,
 
the
 
data
 
management plan must contain the reasons for not giving
 
access.
29.4 
Information on EU funding — Obligation and right to use the EU
 
emblem
Unless the Commission requests or agrees otherwise or unless it is impossible, any dissemination of results (in any form, including electronic) must:
(a) 
display the EU emblem
 
and
(b) 
include the following
 
text:
“This
 
project
 
has
 
received
 
funding
 
from
 
the
 
European
 
Union’s
 
Horizon
 
2020
 
research
 
and
 
innovation programme  
under grant agreement No
 
732064”.
When displayed together with another logo, the EU emblem must have appropriate prominence.
For the purposes of their obligations under this Article, the beneficiaries may use the EU emblem without first obtaining approval from the Commission.
This does not however give them the right to exclusive use.
Moreover, they may not appropriate the EU emblem or any similar trademark or logo, either by registration or by any other means.
29.5 
Disclaimer excluding Commission
 
responsibility
Any dissemination of results must indicate that it reflects only the author's view and that the Commission is not responsible for any use that may be made of the information it contains.
29.6 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 30 — TRANSFER AND LICENSING OF RESULTS
30.1 
Transfer 
of
 
ownership
Each beneficiary may transfer ownership of its results.
It must however ensure that its obligations under Articles 26.2, 26.4, 27, 28, 29, 30 and 31 also apply to the new owner and that this owner has the obligation to pass them on in any subsequent transfer.
This does not change the security obligations in Article 37, which still apply.
Unless
 
agreed
 
otherwise
 
(in
 
writing)
 
for
 
specifically-identified
 
third
 
parties
 
or
 
unless
 
impossible
 
under applicable EU and national laws on mergers and acquisitions, a beneficiary that intends to transfer ownership of results must give at least 45 days advance notice (or less if agreed in writing) to the other beneficiaries that still have (or still may request) access rights to the results. This  
 
notification
50
must include sufficient information on the new owner to enable any beneficiary concerned to assess the effects on its access rights.
Unless agreed otherwise (in writing) for specifically-identified third parties, any other beneficiary may object within 30 days of receiving notification (or less if agreed in writing), if it can show that the
 
transfer
 
would
 
adversely
 
affect
 
its
 
access
 
rights.
 
In
 
this
 
case,
 
the
 
transfer
 
may
 
not
 
take
 
place
 
until agreement has been reached between the beneficiaries
 
concerned.
30.2 
Granting
 
licenses
Each beneficiary may grant licences to its results (or otherwise give the right to exploit them), if:
(a) 
this does not impede the rights under Article 31
 
and
(b) 
not
 
applicable.
In addition to Points (a) and (b), exclusive licences for results may be granted only if all the other beneficiaries concerned have waived their access rights (see Article 31.1).
This
 
does
 
not
 
change
 
the
 
dissemination
 
obligations
 
in
 
Article
 
29
 
or
 
security
 
obligations
 
in
 
Article
 
37, which still 
apply.
30.3 
Commission right to object to transfers or
 
licensing
The Commission may — up to four years after the period set out in Article 3 — object to a transfer of ownership or the exclusive licensing of results, if:
(a) 
it is to a third party established in a non-EU country not associated with Horizon 2020
 
and
(b) 
the
 
Commission
 
considers
 
that
 
the
 
transfer
 
or
 
licence
 
is
 
not
 
in
 
line
 
with
 
EU
 
interests
 
regarding competitiveness or is inconsistent with ethical principles or security
 
considerations.
A
 
beneficiary
 
that
 
intends
 
to
 
transfer
 
ownership
 
or
 
grant
 
an
 
exclusive
 
licence
 
must
 
formally
 
notify
 
the Commission before the intended transfer or licensing takes place
 
and:
· 
identify the specific results
 
concerned;
· 
describe in detail the new owner or licensee and the planned or potential exploitation of the results,
 
and
· 
include a reasoned assessment of the likely impact of the transfer or licence on EU competitiveness and its consistency with ethical principles and security
 
considerations.
The Commission may request additional information.
If the Commission decides to object to a transfer or exclusive licence, it must formally notify the beneficiary concerned within 60 days of receiving notification (or any additional information it has requested).
No transfer or licensing may take place in the following cases:
· 
pending the Commission decision, within the period set out
 
above;
· 
if the Commission
 
objects;
59
· 
until the conditions are complied with, if the Commission objection comes with
 
conditions.
30.4 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 31 — ACCESS RIGHTS TO RESULTS
31.1 
Exercise of access rights — Waiving of access rights — No
 
sub-licensing
The conditions set out in Article 25.1 apply.
The obligations set out in this Article do not change the security obligations in Article 37, which still apply.
31.2 
Access rights for other beneficiaries, for implementing their own tasks under the
 
action
The beneficiaries must give each other access — on a royalty-free basis — to results needed for implementing their own tasks under the action.
31.3 
Access rights for other beneficiaries, for exploiting their own
 
results
The beneficiaries must give each other — under fair and reasonable conditions (see Article 25.3) — access to results needed for exploiting their own results.
Requests for access may be made — unless agreed otherwise — up to one year after the period set out in Article 3.
31.4 
Access rights of affiliated
 
entities
Unless agreed otherwise in the consortium agreement, access to results must also be given — under fair and reasonable conditions (Article 25.3) — to affiliated entities established in an EU Member State or associated country, if this is needed for those entities to exploit the results generated by the beneficiaries to which they are affiliated.
Unless
 
agreed
 
otherwise
 
(see
 
above;
 
Article
 
31.1),
 
the
 
affiliated
 
entity
 
concerned
 
must
 
make
 
any
 
such request directly to the beneficiary that owns the
 
results.
Requests for access may be made — unless agreed otherwise — up to one year after the period set out in Article 3.
31.5 
Access rights for the EU institutions, bodies, offices or agencies and EU Member
 
States
The beneficiaries must give access to their results — on a royalty-free basis — to EU institutions, bodies, offices or agencies, for developing, implementing or monitoring EU policies or programmes.
Such access rights are limited to non-commercial and non-competitive use.
This does not change the right to use any material, document or information received from the beneficiaries for communication and publicising activities (see Article 38.2).
31.6 
Access rights for third
 
parties
Not applicable
31.7 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
SECTION 4   OTHER RIGHTS AND OBLIGATIONS
ARTICLE 32 — RECRUITMENT AND WORKING CONDITIONS FOR RESEARCHERS
32.1 
Obligation to take measures to implement the European Charter for Researchers
 
and Code of Conduct for the Recruitment of
 
Researchers
The beneficiaries must take all measures to implement the principles set out in the Commission Recommendation on the European Charter for Researchers and the Code of Conduct for the Recruitment of Researchers
21
, in particular regarding:
· 
working
 
conditions;
· 
transparent recruitment processes based on merit,
 
and
· 
career
 
development.
The beneficiaries must ensure that researchers and third parties involved in the action are aware of them.
32.2 
Consequences of
 
non-compliance
If a beneficiary breaches its obligations under this Article, the Commission may apply any of the measures described in Chapter 6.
ARTICLE 33 — GENDER EQUALITY
33.1 
Obligation to aim for gender
 
equality
The beneficiaries must take all measures to promote equal opportunities between men and women
 
in the implementation of the action. They must aim, to the extent possible, for a gender balance at all levels of personnel assigned to the action, including at supervisory and managerial
 
level.
33.2 
Consequences of
 
non-compliance
If a beneficiary breaches its obligations under this Article, the Commission may apply any of the measures described in Chapter 6.
21
 
Commission
 
Recommendation
 
2005/251/EC
 
of
 
11
 
March
 
2005
 
on
 
the
 
European
 
Charter
 
for
 
Researchers
 
and
 
on
 
a
 
Code of Conduct for the Recruitment of Researchers (OJ L 75, 22.3.2005, p.
 
67).
ARTICLE 34 — ETHICS AND RESEARCH INTEGRITY
34.1 
Obligation to comply with ethical principles and research
 
integrity
The beneficiaries must carry out the action in compliance with:
(a) 
ethical principles (including the highest standards of research
 
integrity) and
(b) 
applicable international, EU and national
 
law.
Funding will not be granted for activities carried out outside the EU if they are prohibited in all Member
 
States
 
or
 
for
 
activities
 
which
 
destroy
 
human
 
embryos
 
(for
 
example,
 
for
 
obtaining
 
stem
 
cells).
The beneficiaries must ensure that the activities under the action have an exclusive focus on civil applications.
The beneficiaries must ensure that the activities under the action do not:
(a) 
aim at human cloning for reproductive
 
purposes;
(b) 
intend
 
to
 
modify
 
the
 
genetic
 
heritage
 
of
 
human
 
beings
 
which
 
could
 
make
 
such
 
changes
 
heritable (with the exception of research relating to cancer treatment of the gonads, which may be financed),
 
or
(c) 
intend to create human embryos solely for the purpose of research or for the purpose of stem cell procurement, including by means of somatic cell nuclear
 
transfer.
The beneficiaries must respect the highest standards of research integrity — as set out, for instance, in the European Code of Conduct for Research Integrity
22
.
This implies notably compliance with the following essential principles:
· 
honesty;
· 
reliability;
· 
objectivity;
· 
impartiality;
· 
open
 
communication;
· 
duty of
 
care;
· 
fairness
 
and
· 
responsibility for future science
 
generations.
22 
European Code of Conduct for Research Integrity of ALLEA (All European Academies) and ESF (European Science Foundation) of March 2011. 
http://www.esf.org/fileadmin/Public_documents/Publications/Code_Conduct_ResearchIntegrity.pdf
This means that beneficiaries must ensure that persons carrying out research tasks:
· 
present their research goals and intentions in an honest and transparent
 
manner;
· 
design
 
their
 
research
 
carefully
 
and
 
conduct
 
it
 
in
 
a
 
reliable
 
fashion,
 
taking
 
its
 
impact
 
on
 
society into
 
account;
· 
use techniques and methodologies (including for data collection and management) that are appropriate for the field(s)
 
concerned;
· 
exercise due care for the subjects of research — be they human beings, animals, the environment or cultural
 
objects;
· 
ensure objectivity, accuracy and impartiality when disseminating the
 
results;
· 
allow — in addition to the open access obligations under Article 29.3 as much as possible
 
and taking into account the legitimate interest of the beneficiaries — access to research data, in order to enable research to be
 
reproduced;
· 
make the necessary references to their work and that of other
 
researchers;
· 
refrain from practicing any form of plagiarism, data falsification or
 
fabrication;
· 
avoid
 
double
 
funding,
 
conflicts
 
of
 
interest
 
and
 
misrepresentation
 
of
 
credentials
 
or
 
other
 
research misconduct.
34.2 
Activities raising ethical
 
issues
Activities raising ethical issues must comply with the ‘
ethics requirements
’ set out as deliverables in Annex 1.
Before the beginning of an activity raising an ethical issue, each beneficiary must have obtained:
(a) 
any ethics committee opinion required under national law
 
and
(b) 
any
 
notification
 
or
 
authorisation
 
for
 
activities
 
raising
 
ethical
 
issues
 
required
 
under
 
national
 
and/ or European
 
law
needed for implementing the action tasks in question.
The documents must be kept on file and be submitted upon request by the coordinator to the Commission (see Article 52). If they are not in English, they must be submitted together with         an English summary, which shows that the action tasks in question are covered and includes the conclusions of the committee or authority concerned (if
 
available).
34.3 
Activities involving human embryos or human embryonic stem
 
cells
Activities involving research on human embryos or human embryonic stem cells may be carried out, in addition to Article 34.1, only if:
· 
they are set out in Annex 1
 
or
· 
the coordinator has obtained explicit approval (in writing) from the  Commission  (see  Article
 
52).
34.4 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43) and the Agreement or participation of the beneficiary may be terminated (see Article 50).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 35 — CONFLICT OF INTERESTS
35.1 
Obligation to avoid a conflict of
 
interests
The beneficiaries must take all measures to prevent any situation where the impartial and objective implementation of the action is compromised for reasons involving economic interest, political or national affinity, family or emotional ties or any other shared interest (‘
conflict of interests
’).
They must formally notify to the Commission without delay any situation constituting or likely to lead to a conflict of interests and immediately take all the necessary steps to rectify this situation.
The Commission may verify that the measures taken are appropriate and may require additional measures to be taken by a specified deadline.
35.2 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43) and the Agreement or participation of the beneficiary may be terminated (see Article 50).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 36 — CONFIDENTIALITY
36.1 
General obligation to maintain
 
confidentiality
During implementation of the action and for four years after the period set out in Article 3, the parties must keep confidential any data, documents or other material (in any form) that is identified as confidential at the time it is disclosed (‘
confidential information
’).
If a beneficiary requests, the Commission may agree to keep such information confidential for an additional period beyond the initial four years.
If information has been identified as confidential only orally, it will be considered to be confidential only if this is confirmed in writing within 15 days of the oral disclosure.
Unless
 
otherwise
 
agreed
 
between
 
the
 
parties,
 
they
 
may
 
use
 
confidential
 
information
 
only
 
to
 
implement the
 
Agreement.
The beneficiaries may disclose confidential information to their personnel or third parties involved in the action only if they:
(a) 
need to know to implement the Agreement
 
and
(b) 
are bound by an obligation of
 
confidentiality.
This does not change the security obligations in Article 37, which still apply.
The Commission may disclose confidential information to its staff, other EU institutions and bodies. It may disclose confidential information to third parties, if:
(a) 
this is necessary to implement the Agreement or safeguard the EU's financial interests
 
and
(b) 
the recipients of the information are bound by an obligation of
 
confidentiality.
Under the conditions set out in Article 4 of the Rules for Participation Regulation No 1290/2013
23
, the Commission must moreover make available information on the results to other EU institutions, bodies, offices or agencies as well as Member States or associated countries.
The confidentiality obligations no longer apply if:
(a) 
the disclosing party agrees to release the other
 
party;
(b) 
the information was already known by the recipient or is given to him without obligation of confidentiality by a third party that was not bound by any obligation of
 
confidentiality;
(c) 
the recipient proves that the information was developed without the use of confidential information;
(d) 
the information becomes generally and publicly available, without breaching any confidentiality obligation,
 
or
(e) 
the disclosure of the information is required by EU or national
 
law.
36.2 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 37 — SECURITY-RELATED OBLIGATIONS
37.1 
Results with a security
 
recommendation
Not applicable
37.2 
Classified
 
information
Not applicable
37.3 
Activities involving dual-use goods or dangerous materials and
 
substances
Not applicable
37.4 
Consequences of
 
non-compliance
Not applicable
23 
Regulation (EU) No 1290/2013 of the European Parliament and of the Council of 11 December 2013 laying down the rules for participation and dissemination in "Horizon 2020 - the Framework Programme for Research and Innovation (2014-2020)" (OJ L 347, 20.12.2013 p.81).
ARTICLE 38 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING
38.1 
Communication activities by
 
beneficiaries
38.1.1 
Obligation to promote the action and its
 
results
The
 
beneficiaries
 
must
 
promote
 
the
 
action
 
and
 
its
 
results,
 
by
 
providing
 
targeted
 
information
 
to
 
multiple audiences (including the media and the public) in a strategic and effective
 
manner.
This does not change the dissemination obligations in Article 29, the confidentiality obligations in Article 36 or the security obligations in Article 37, all of which still apply.
Before
 
engaging
 
in
 
a
 
communication
 
activity
 
expected
 
to
 
have
 
a
 
major
 
media
 
impact,
 
the
 
beneficiaries must inform the Commission (see Article
 
52).
38.1.2 
Information on EU funding — Obligation and right to use the EU
 
emblem
Unless the Commission requests or agrees otherwise or unless it is impossible, any communication activity related to the action (including in electronic form, via social media, etc.) and any infrastructure, equipment and major results funded by the grant must:
(a) 
display the EU emblem
 
and
(b) 
include the following
 
text:
For communication activities: 
“This project has received funding from the 
European Union’s Horizon 2020 research and innovation programme 
under grant agreement No 732064”.
For infrastructure, equipment and major results: 
“This [infrastructure][equipment][insert type of result] is part of a project that has received funding from the 
European Union’s Horizon 2020 research and innovation programme 
under grant agreement No 732064”.
When displayed together with another logo, the EU emblem must have appropriate prominence.
For the purposes of their obligations under this Article, the beneficiaries may use the EU emblem without first obtaining approval from the Commission.
This does not, however, give them the right to exclusive use.
Moreover, they may not appropriate the EU emblem or any similar trademark or logo, either by registration or by any other means.
38.1.3 
Disclaimer excluding Commission
 
responsibility
Any communication activity related to the action must indicate that it reflects only the author's view and
 
that
 
the
 
Commission
 
is
 
not
 
responsible
 
for
 
any
 
use
 
that
 
may
 
be
 
made
 
of
 
the
 
information
 
it
 
contains.
38.2 
Communication activities by the
 
Commission
38.2.1 Right to use beneficiaries’ materials, documents or information
The Commission may use, for its communication and publicising activities, information relating     to the action, documents notably summaries for publication and public deliverables as well as any other material, such as pictures or audio-visual material received from any beneficiary (including in electronic
 
form).
This does not change the confidentiality obligations in Article 36 and the security obligations in Article 37, all of which still apply.
If the Commission’s use of these materials, documents or information would risk compromising legitimate interests, the beneficiary concerned may request the Commission not to use it (see   Article
 
52).
The right to use a beneficiary’s materials, documents and information includes:
(a) 
use for its own purposes 
(in particular, making them available to persons working for the Commission or any other EU institution, 
body, 
office or agency or body or institutions in EU Member States; and copying or reproducing them in whole or in part, in unlimited
 
numbers);
(b) 
distribution
 
to
 
the
 
public
 
(in
 
particular,
 
publication
 
as
 
hard
 
copies
 
and
 
in
 
electronic
 
or
 
digital format, publication on the internet, as a downloadable or non-downloadable file,
 
broadcasting by any channel, public display or presentation, communicating through press information services, or inclusion in widely accessible databases or
 
indexes);
(c) 
editing or redrafting 
for communication and publicising activities (including shortening, summarising,
 
inserting
 
other
 
elements
 
(such
 
as
 
meta-data,
 
legends,
 
other
 
graphic,
 
visual,
 
audio or text elements), extracting parts (e.g. audio or video files), dividing into parts, use in a compilation);
(d) 
translation
;
(e) 
giving 
access in response to individual requests 
under Regulation No 1049/2001
25
, without the right to reproduce or
 
exploit;
(f) 
storage 
in paper, electronic or other
 
form;
(g) 
archiving
, in line with applicable document-management rules,
 
and
(h) 
the right to authorise third parties to act on its behalf or sub-license the modes of use set out in Points (b), (c), (d) and (f) to third parties if needed for the communication and publicising activities of the
 
Commission.
If the right of use is subject to rights of a third party (including personnel of the beneficiary), the beneficiary must ensure that it complies with its obligations under this Agreement (in particular, by obtaining the necessary approval from the third parties concerned).
Where applicable (and if provided by the beneficiaries), the Commission will insert the following information:
“© – [year] – [name of the copyright owner]. All rights reserved. Licensed to the European Union (EU) under conditions.”
38.3 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
25 
Regulation (EC) No 1049/2001 of the European Parliament and of the Council of 30 May 2001 regarding public access to European Parliament, Council and Commission documents, OJ L 145, 31.5.2001, p. 43.
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 39 — PROCESSING OF PERSONAL DATA
39.1 
Processing of personal data by the
 
Commission
Any personal data under the Agreement will be processed by the Commission under Regulation    No 45/2001
26 
and according to the ‘notifications of the processing operations’ to the Data Protection Officer (DPO) of the Commission (publicly accessible in the DPO
 
register).
Such data will be processed by the ‘
data controller
’ of the Commission for the purposes of implementing, managing and monitoring the Agreement or protecting the financial interests of the EU or Euratom (including checks, reviews, audits and investigations; see Article 22).
The
 
persons
 
whose
 
personal
 
data
 
are
 
processed
 
have
 
the
 
right
 
to
 
access
 
and
 
correct
 
their
 
own
 
personal data. For this purpose, they must send any queries about the processing of their personal data to the data controller, via the contact point indicated in the privacy statement(s) that are published on the Commission
 
websites.
They also have the right to have recourse at any time to the European Data Protection Supervisor (EDPS).
39.2 
Processing of personal data by the
 
beneficiaries
The
 
beneficiaries
 
must
 
process
 
personal
 
data
 
under
 
the
 
Agreement
 
in
 
compliance
 
with
 
applicable
 
EU and national law on data protection (including authorisations or notification
 
requirements).
The beneficiaries may grant their personnel access only to data that is strictly necessary for implementing, managing and monitoring the Agreement.
The beneficiaries must inform the personnel whose personal data are collected and processed by the Commission. For this purpose, they must provide them with the privacy statement(s) (see above), before transmitting their data to the Commission.
39.3 
Consequences of
 
non-compliance
If a beneficiary breaches any of its obligations under Article 39.2, the Commission may apply any
 
of the measures described in Chapter
 
6.
ARTICLE 40 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE COMMISSION
The beneficiaries may not assign any of their claims for payment against the Commission to any third party, except if approved by the Commission on the basis of a reasoned, written request by the coordinator (on behalf of the beneficiary concerned).
If
 
the
 
Commission
 
has
 
not
 
accepted
 
the
 
assignment
 
or
 
the
 
terms
 
of
 
it
 
are
 
not
 
observed,
 
the
 
assignment will have no effect on
 
it.
26 
Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December 2000 on the protection of individuals with regard to the processing of personal data by the Community institutions and bodies and on the
 
free movement of such data (OJ L 8, 12.01.2001, p.
 
1).
60
In no circumstances will an assignment release the beneficiaries from their obligations towards the Commission.
CHAPTER 5   DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES
— RELATIONSHIP WITH COMPLEMENTARY BENEFICIARIES — RELATIONSHIP WITH PARTNERS OF A JOINT ACTION
ARTICLE 41 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES
— RELATIONSHIP WITH COMPLEMENTARY BENEFICIARIES — RELATIONSHIP WITH PARTNERS OF A JOINT ACTION
41.1 
Roles and responsibilities towards the
 
Commission
The beneficiaries have full responsibility for implementing the action and complying with the Agreement.
The beneficiaries are jointly and severally liable for the 
technical implementation 
of the action as described
 
in
 
Annex
 
1.
 
If
 
a
 
beneficiary
 
fails
 
to
 
implement
 
its
 
part
 
of
 
the
 
action,
 
the
 
other
 
beneficiaries become responsible for implementing this part (without being entitled to any additional EU funding for doing so), unless the Commission expressly relieves them of this
 
obligation.
The 
financial responsibility 
of each beneficiary is governed by Articles 44, 45 and 46.
41.2 
Internal division of roles and
 
responsibilities
The internal roles and responsibilities of the beneficiaries are divided as follows:
(a) 
Each 
beneficiary
 
must:
(i) 
keep information stored in the Participant Portal Beneficiary Register (via the electronic exchange system) up to date (see Article
 
17);
(ii) 
inform the coordinator immediately of any events or circumstances likely to affect significantly or delay the implementation of the action (see Article
 
17);
(iii) 
submit to the coordinator in good
 
time:
· 
individual financial statements for itself and its linked third parties and, if required, certificates on the financial statements (see Article
 
20);
· 
the data needed to draw up the technical reports (see Article
 
20);
· 
ethics
 
committee
 
opinions
 
and
 
notifications
 
or
 
authorisations
 
for
 
activities
 
raising
 
ethical issues (see Article
 
34);
· 
any other documents or information required by the Commission under the Agreement, unless the Agreement requires the beneficiary to submit this information directly to the Commission.
(b) 
The 
coordinator
 
must:
(i) 
monitor that the action is implemented properly (see Article
 
7);
69
(ii) 
act
 
as
 
the
 
intermediary
 
for
 
all
 
communications
 
between
 
the
 
beneficiaries
 
and
 
the
 
Commission (in
 
particular,
 
providing
 
the
 
Commission
 
with
 
the
 
information
 
described
 
in
 
Article
 
17),
 
unless the Agreement specifies
 
otherwise;
(iii) 
request and review any documents or information required by the Commission and verify their completeness and correctness before passing them on to the
 
Commission;
(iv) 
submit the deliverables and reports to the Commission (see Articles 19 and
 
20);
(v) 
ensure that all payments are made to the other beneficiaries without unjustified delay (see Article
 
21);
(vi) 
inform the Commission of the amounts paid to each beneficiary, when required under the Agreement (see Articles 44 and 50) or requested by the
 
Commission.
The coordinator may not delegate or subcontract the above-mentioned tasks to any other beneficiary or third party (including linked third parties).
41.3 
Internal arrangements between beneficiaries — Consortium
 
agreement
The beneficiaries must have internal arrangements regarding their operation and co-ordination to ensure
 
that
 
the
 
action
 
is
 
implemented
 
properly.
 
These
 
internal
 
arrangements
 
must
 
be
 
set
 
out
 
in
 
a
 
written ‘
consortium agreement
’ between the beneficiaries, which may
 
cover:
· 
internal organisation of the
 
consortium;
· 
management of access to the electronic exchange
 
system;
· 
distribution of EU
 
funding;
· 
additional
 
rules
 
on
 
rights
 
and
 
obligations
 
related
 
to
 
background
 
and
 
results
 
(including
 
whether access rights remain or not, if a beneficiary is in breach of its obligations) (see Section 3 of Chapter
 
4);
· 
settlement of internal
 
disputes;
· 
liability, indemnification and confidentiality arrangements between the
 
beneficiaries.
The consortium agreement must not contain any provision contrary to the Agreement.
41.4 
Relationship with complementary beneficiaries — Collaboration
 
agreement
Not applicable
41.5 
Relationship with partners of a joint action — Coordination
 
agreement
Not applicable
CHAPTER 6   REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY
· 
 SANCTIONS — DAMAGES — SUSPENSION — TERMINATION — FORCE
 
MAJEURE
SECTION 1   REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY
· 
 SANCTIONS
ARTICLE 42 — REJECTION OF INELIGIBLE COSTS
42.1 
Conditions
The Commission will — at the time of an 
interim payment
, after 
termination of the participation of a beneficiary
, at the time of an 
interim payment
, 
at the payment of the balance 
or 
afterwards
· 
reject
 
any
 
costs
 
which
 
are
 
ineligible
 
(see
 
Article
 
6),
 
in
 
particular
 
following
 
checks,
 
reviews,
 
audits or investigations (see Article
 
22).
The rejection may also be based on the 
extension of findings from other grants to this grant 
(see Article 22.5.2).
42.2 
Ineligible costs to be rejected — Calculation —
 
Procedure
Ineligible costs will be rejected in full.
If the rejection of costs does not lead to a recovery (see Article 44), the Commission will formally notify
 
the
 
coordinator
 
or
 
beneficiary
 
concerned
 
of
 
the
 
rejection
 
of
 
costs,
 
the
 
amounts
 
and
 
the
 
reasons why (if applicable, together with the notification of amounts due; see Article 21.5). The coordinator or beneficiary concerned may — within 30 days of receiving notification — formally notify the Commission of its disagreement and the reasons
 
why.
If the rejection of costs leads to a recovery, the Commission will follow the contradictory procedure with pre-information letter set out in Article 44.
42.3 
Effects
If
 
the
 
Commission
 
rejects
 
costs
 
at
 
the
 
time
 
of
 
an
 
interim
 
payment
 
or
 
the
 
payment
 
of
 
the
 
balance
,
 
it will
 
deduct
 
them
 
from
 
the
 
total
 
eligible
 
costs
 
declared,
 
for
 
the
 
action,
 
in
 
the
 
periodic
 
or
 
final
 
summary financial
 
statement
 
(see
 
Articles
 
20.3
 
and
 
20.4).
 
It
 
will
 
then
 
calculate
 
the
 
interim
 
payment
 
or
 
payment of the balance as set out in Articles 21.3 or
 
21.4.
If
 
the
 
Commission
 
rejects
 
costs
 
after
 
termination
 
of
 
the
 
participation
 
of
 
a
 
beneficiary
,
 
it
 
will
 
deduct them from the costs declared by the beneficiary in the termination report and include the rejection in the calculation after termination (see Article 50.2 and
 
50.3).
If the Commission — 
after an interim payment but before the payment of the balance 
—
 
rejects costs declared in a periodic summary financial statement, it will deduct them from the total eligible costs
 
declared,
 
for
 
the
 
action,
 
in
 
the
 
next
 
periodic
 
summary
 
financial
 
statement
 
or
 
in
 
the
 
final
 
summary financial statement. It will then calculate the interim payment or payment of the balance as set out  in Articles 21.3 or
 
21.4.
If
 
the
 
Commission
 
rejects
 
costs
 
after
 
the
 
payment
 
of
 
the
 
balance
,
 
it
 
will
 
deduct
 
the
 
amount
 
rejected from the total eligible costs declared, by the beneficiary, in the final summary financial statement. It will then calculate the revised final grant amount as set out in Article
 
5.4.
ARTICLE 43 — REDUCTION OF THE GRANT
43.1 
Conditions
The Commission may — 
after termination of the participation of a beneficiary
, 
at the payment of the balance 
or 
afterwards 
— reduce the grant amount (see Article 5.1), if :
(a) 
a
 
beneficiary
 
(or
 
a
 
natural
 
person
 
who
 
has
 
the
 
power
 
to
 
represent
 
or
 
take
 
decisions
 
on
 
its
 
behalf) has
 
committed:
(i) 
substantial errors, irregularities or fraud
 
or
(ii) 
serious breach of obligations under the Agreement or during the award procedure (including
 
improper
 
implementation
 
of
 
the
 
action,
 
submission
 
of
 
false
 
information,
 
failure to provide required information, breach of ethical principles)
 
or
(b) 
a
 
beneficiary
 
(or
 
a
 
natural
 
person
 
who
 
has
 
the
 
power
 
to
 
represent
 
or
 
take
 
decision
 
on
 
its
 
behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (
extension of findings from other grants to this grant
; see Article
 
22.5.2).
43.2 
Amount to be reduced — Calculation —
 
Procedure
The amount of the reduction will be proportionate to the seriousness of the errors, irregularities or fraud or breach of obligations.
Before
 
reduction
 
of
 
the
 
grant,
 
the
 
Commission
 
will
 
formally
 
notify
 
a
 
‘
pre-information
 
letter
’
 
to
 
the coordinator or beneficiary
 
concerned:
· 
informing
 
it
 
of
 
its
 
intention
 
to
 
reduce
 
the
 
grant,
 
the
 
amount
 
it
 
intends
 
to
 
reduce
 
and
 
the
 
reasons why
 
and
· 
inviting it to submit observations within 30 days of receiving
 
notification
If the Commission does not receive any observations or decides to pursue reduction despite the observations it has received, it will formally notify 
confirmation 
of the reduction (if applicable, together with the notification of amounts due; see Article 21).
43.3 
Effects
If
 
the
 
Commission
 
reduces
 
the
 
grant
 
after
 
termination
 
of
 
the
 
participation
 
of
 
a
 
beneficiary
,
 
it
 
will calculate the reduced grant amount for that beneficiary and then determine the amount due to that beneficiary (see Article 50.2 and
 
50.3).
If
 
the
 
Commission
 
reduces
 
the
 
grant
 
at
 
the
 
payment
 
of
 
the
 
balance
,
 
it
 
will
 
calculate
 
the
 
reduced
 
grant amount
 
for
 
the
 
action
 
and
 
then
 
determine
 
the
 
amount
 
due
 
as
 
payment
 
of
 
the
 
balance
 
(see
 
Articles
 
5.3.4 and
 
21.4).
If the Commission reduces the grant 
after the payment of the balance
, it will calculate the revised final grant amount for the beneficiary concerned (see Article 5.4). If the revised final grant amount for the beneficiary concerned is lower than its share of the final grant amount, the Commission will recover the difference (see Article 44).
ARTICLE 44 — RECOVERY OF UNDUE AMOUNTS
44.1 
Amount to be recovered — Calculation —
 
Procedure
The Commission will — after 
termination of the participation of a beneficiary, at the payment of the balance 
or 
afterwards 
— claim back any amount that was paid but is not due under the Agreement.
Each beneficiary’s financial responsibility in case of recovery is limited to its own debt (including undue amounts paid by the Commission for costs declared by its linked third parties), except for the amount retained for the Guarantee Fund (see Article 21.4).
44.1.1 Recovery after termination of a beneficiary’s participation
If
 
recovery
 
takes
 
place
 
after
 
termination
 
of
 
a
 
beneficiary’s
 
participation
 
(including
 
the
 
coordinator),
 
the Commission
 
will
 
claim
 
back
 
the
 
undue
 
amount
 
from
 
the
 
beneficiary
 
concerned,
 
by
 
formally
 
notifying it
 
a
 
debit
 
note
 
(see
 
Article
 
50.2
 
and
 
50.3).
 
This
 
note
 
will
 
specify
 
the
 
amount
 
to
 
be
 
recovered,
 
the
 
terms and the date for
 
payment.
If payment is not made by the date specified in the debit note, the Commission will 
recover 
the amount:
(a) 
by ‘
offsetting
’ it — without the beneficiary’s consent — against any amounts owed to the beneficiary concerned by the Commission or an executive agency (from the EU or Euratom budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Commission may offset before the payment date specified in the debit note;
(b) 
not
 
applicable;
(c) 
by 
taking legal action 
(see Article 57) or by 
adopting an enforceable decision 
under  Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the Financial regulation No
 
966/2012.
If
 
payment
 
is
 
not
 
made
 
by
 
the
 
date
 
specified
 
in
 
the
 
debit
 
note,
 
the
 
amount
 
to
 
be
 
recovered
 
(see
 
above) will
 
be
 
increased
 
by
 
late-payment
 
interest
 
at
 
the
 
rate
 
set
 
out
 
in
 
Article
 
21.11,
 
from
 
the
 
day
 
following the
 
payment
 
date
 
in
 
the
 
debit
 
note,
 
up
 
to
 
and
 
including
 
the
 
date
 
the
 
Commission
 
receives
 
full
 
payment of the
 
amount.
Partial payments will be first credited against expenses, charges and late-payment interest and then against the principal.
Bank charges incurred in the recovery process  will  be  borne  by  the  beneficiary,  unless  Directive 2007/64/EC
27
 
applies.
44.1.2 
Recovery at payment of the
 
balance
If the payment of the balance takes the form of a recovery (see Article 21.4), the Commission will formally notify a ‘
pre-information letter
’ to the coordinator:
27  
Directive 2007/64/EC of the European Parliament and of the Council of 13 November 2007 on payment services      in the internal market amending Directives 97/7/EC, 2002/65/EC, 2005/60/EC and 2006/48/EC and repealing Directive 97/5/EC (OJ L 319, 05.12.2007, p.
 
1).
· 
informing it of its intention to recover, the amount due as the balance and the reasons
 
why;
· 
specifying that it intends to deduct the amount to be recovered from the amount retained for the Guarantee
 
Fund;
· 
requesting
 
the
 
coordinator
 
to
 
submit
 
a
 
report
 
on
 
the
 
distribution
 
of
 
payments
 
to
 
the
 
beneficiaries within 30 days of receiving notification,
 
and
· 
inviting the coordinator to submit observations within 30 days of receiving
 
notification.
If no observations are submitted or the Commission decides to pursue recovery despite the observations
 
it
 
has
 
received,
 
it
 
will
 
confirm
 
recovery
 
(together
 
with
 
the
 
notification
 
of
 
amounts
 
due; see Article 21.5)
 
and:
· 
pay the difference between the amount to be recovered and the amount retained for the Guarantee Fund, 
if the difference is positive
 
or
· 
formally notify to the coordinator a 
debit note 
for the difference between the amount to be recovered and the amount retained for the Guarantee Fund, 
if the difference is negative
.
 
This note will also specify the terms and the date for
 
payment.
If the coordinator does not repay the Commission by the date in the debit note and has not
 
submitted the report on the distribution of payments: the Commission will 
recover 
the amount set out in the debit note from the coordinator (see
 
below).
If the coordinator does not repay the Commission by the date in the debit note, but has submitted
 
the report on the distribution of payments: the Commission
 
will:
(a) 
identify the beneficiaries for which the amount calculated as follows is
 
negative:
{
{
{
{beneficiary’s costs declared in the final summary financial statement and approved by      the Commission multiplied by the reimbursement rate set out in Article 5.2 for the beneficiary concerned
plus
its linked third parties’ costs declared in the final summary financial statement and approved by the Commission multiplied by the reimbursement rate set out in Article 5.2 for each linked third party concerned}
divided by
the EU contribution for the action calculated according to Article 5.3.1
} 
multiplied by
the final grant amount (see Article 5.3)
}
, minus
{pre-financing and interim payments received by the beneficiary}
}
.
(b) 
formally
 
notify
 
to
 
each
 
beneficiary
 
identified
 
according
 
to
 
point
 
(a)
 
a
 
debit
 
note
 
specifying
 
the terms and date for payment. The amount of the debit note is calculated as
 
follows:
{
{amount calculated according to point (a) for the beneficiary concerned divided by
the
 
sum
 
of
 
the
 
amounts
 
calculated
 
according
 
to
 
point
 
(a)
 
for
 
all
 
the
 
beneficiaries
 
identified
 
according to point
 
(a)}
multiplied by
the amount set out in the debit note formally notified to the coordinator}.
If payment is not made by the date specified in the debit note, the Commission will 
recover 
the amount:
(a) 
by ‘
offsetting
’ it — without the beneficiary’s consent — against any amounts owed to the beneficiary concerned by the Commission or an executive agency (from the EU or Euratom budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Commission may offset before the payment date specified in the debit note;
(b) 
by 
drawing on the Guarantee Fund
. The Commission will formally notify the beneficiary concerned the debit note on behalf of the Guarantee Fund and recover the
 
amount:
(i) 
not
 
applicable;
(ii) 
by 
taking legal action 
(see Article 57) or by 
adopting an enforceable decision 
under Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the Financial Regulation No
 
966/2012.
If payment is not made by the date in the debit note, the amount to be recovered (see above) will be increased by 
late-payment interest 
at the rate set out in Article 21.11, from the day following the payment date in the debit note, up to and including the date the Commission receives full payment of the
 
amount.
Partial payments will be first credited against expenses, charges and late-payment interest and then against the principal.
Bank charges incurred in the recovery process  will  be  borne  by  the  beneficiary,  unless  Directive 2007/64/EC
 
applies.
44.1.3 
Recovery of amounts after payment of the
 
balance
If,
 
for
 
a
 
beneficiary,
 
the
 
revised
 
final
 
grant
 
amount
 
(see
 
Article
 
5.4)
 
is
 
lower
 
than
 
its
 
share
 
of
 
the
 
final grant amount, it must repay the difference to the
 
Commission.
The beneficiary’s share of the final grant amount is calculated as follows:
{
{
{beneficiary’s costs declared in the final summary financial statement and approved by the Commission multiplied by the reimbursement rate set out in Article 5.2 for the beneficiary concerned
plus
its linked third parties’ costs declared in the final summary financial statement and approved by the Commission multiplied by the reimbursement rate set out in Article 5.2 for each linked third party concerned}
divided by
the EU contribution for the action calculated according to Article 5.3.1
} 
multiplied by
the final grant amount (see Article 5.3)
}
.
If the coordinator has not distributed amounts received (see Article 21.7), the Commission will also recover these amounts.
The Commission will formally notify a 
pre-information letter 
to the beneficiary concerned:
· 
informing it of its intention to recover, the due amount and the reasons why
 
and
· 
inviting it to submit observations within 30 days of receiving
 
notification.
If no observations are submitted or the Commission decides to pursue recovery despite the observations it has received, it will 
confirm 
the amount to be recovered and formally notify to the beneficiary concerned a 
debit note
. This note will also specify the terms and the date for payment.
If payment is not made by the date specified in the debit note, the Commission will 
recover 
the amount:
(a) 
by ‘
offsetting
’ it — without the beneficiary’s consent — against any amounts owed to the beneficiary concerned by the Commission or an executive agency (from the EU or Euratom budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Commission may offset before the payment date specified in the debit note;
(b) 
by 
drawing on the Guarantee Fund
. The Commission will formally notify the beneficiary concerned the debit note on behalf of the Guarantee Fund and recover the
 
amount:
(i) 
not
 
applicable;
(ii) 
by 
taking legal action 
(see Article 57) or by 
adopting an enforceable decision 
under Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the Financial Regulation No
 
966/2012.
If payment is not made by the date in the debit note, the amount to be recovered (see above) will be increased by 
late-payment interest 
at the rate set out in Article 21.11, from the day following the date
 
for
 
payment
 
in
 
the
 
debit
 
note,
 
up
 
to
 
and
 
including
 
the
 
date
 
the
 
Commission
 
receives
 
full
 
payment of the
 
amount.
Partial payments will be first credited against expenses, charges and late-payment interest and then against the principal.
Bank charges incurred in the recovery process  will  be  borne  by  the  beneficiary,  unless  Directive 2007/64/EC
 
applies.
ARTICLE 45 — ADMINISTRATIVE SANCTIONS
In addition to contractual measures, the Commission may also adopt administrative sanctions under Articles 106 and 131(4) of the Financial Regulation No 966/2012 (i.e. exclusion from future procurement contracts, grants and expert contracts and/or financial penalties).
SECTION 2   LIABILITY FOR DAMAGES
ARTICLE 46 — LIABILITY FOR DAMAGES
46.1 
Liability of the
 
Commission
The Commission cannot be held liable for any damage caused to the beneficiaries or to third parties as a consequence of implementing the Agreement, including for gross negligence.
The Commission cannot be held liable for any damage caused by any of the beneficiaries or third parties involved in the action, as a consequence of implementing the Agreement.
46.2 
Liability of the
 
beneficiaries
Except in case of force majeure (see Article 51), the beneficiaries must compensate the Commission for any damage it sustains as a result of the implementation of the action or because the action was not implemented in full compliance with the Agreement.
SECTION 3   SUSPENSION AND TERMINATION
ARTICLE 47 — SUSPENSION OF PAYMENT DEADLINE
47.1 
Conditions
The Commission may — at any moment — suspend the payment deadline (see Article 21.2 to 21.4) if a request for payment (see Article 20) cannot be approved because:
(a) 
it does not comply with the provisions of the Agreement (see Article
 
20);
(b) 
the technical or financial reports have not been submitted or are not complete or additional information is needed,
 
or
(c) 
there
 
is
 
doubt
 
about
 
the
 
eligibility
 
of
 
the
 
costs
 
declared
 
in
 
the
 
financial
 
statements
 
and
 
additional checks, reviews, audits or investigations are
 
necessary.
47.2 
Procedure
The Commission will formally notify the coordinator of the suspension and the reasons why. The suspension will 
take effect 
the day notification is sent by the Commission (see Article 52).
If the conditions for suspending the payment deadline are no longer met, the suspension will be 
lifted
· 
and the remaining period will
 
resume.
If
 
the
 
suspension
 
exceeds
 
two
 
months,
 
the
 
coordinator
 
may
 
request
 
the
 
Commission
 
if
 
the
 
suspension will
 
continue.
If the payment deadline has been suspended due to the non-compliance of the technical or financial reports
 
(see
 
Article
 
20)
 
and
 
the
 
revised
 
report
 
or
 
statement
 
is
 
not
 
submitted
 
or
 
was
 
submitted
 
but
 
is
 
also rejected, the Commission may also terminate the Agreement or the participation of the beneficiary (see Article
 
50.3.1(l)).
ARTICLE 48 — SUSPENSION OF PAYMENTS
48.1 
Conditions
The Commission may — at any moment — suspend payments, in whole or in part and interim payments or the payment of the balance for one or more beneficiaries, if:
(a) 
a
 
beneficiary
 
(or
 
a
 
natural
 
person
 
who
 
has
 
the
 
power
 
to
 
represent
 
or
 
take
 
decision
 
on
 
its
 
behalf) has committed or is suspected of having
 
committed:
(i) 
substantial errors, irregularities or fraud
 
or
(ii) 
serious breach of obligations under the Agreement or during the award procedure (including
 
improper
 
implementation
 
of
 
the
 
action,
 
submission
 
of
 
false
 
information,
 
failure to provide required information, breach of ethical principles)
 
or
(b) 
a
 
beneficiary
 
(or
 
a
 
natural
 
person
 
who
 
has
 
the
 
power
 
to
 
represent
 
or
 
take
 
decision
 
on
 
its
 
behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (
extension of findings from other grants to this grant
; see Article
 
22.5.2).
If
 
payments
 
are
 
suspended
 
for
 
one
 
or
 
more
 
beneficiaries,
 
the
 
Commission
 
will
 
make
 
partial
 
payment(s) for
 
the
 
part(s)
 
not
 
suspended.
 
If
 
suspension
 
concerns
 
the
 
payment
 
of
 
the
 
balance,
 
—
 
once
 
suspension is lifted — the payment or the recovery of the amount(s) concerned will be considered the payment of the balance that closes the
 
action.
48.2 
Procedure
Before suspending payments, the Commission will formally notify the coordinator or beneficiary concerned:
· 
informing it of its intention to suspend payments and the reasons why
 
and
· 
inviting it to submit observations within 30 days of receiving
 
notification.
If the Commission does not receive observations or decides to pursue the procedure despite the observations
 
it
 
has
 
received,
 
it
 
will
 
formally
 
notify
 
confirmation
 
of
 
the
 
suspension.
 
Otherwise,
 
it
 
will formally notify that the suspension procedure is not
 
continued.
The suspension will 
take effect 
the day the confirmation notification is sent by the Commission.
If the conditions for resuming payments are met, the suspension will be 
lifted
. The Commission
 
will formally notify the coordinator or beneficiary
 
concerned.
During the suspension, the periodic report(s) for all reporting periods except the last one (see  Article
 
20.3),
 
must
 
not
 
contain
 
any
 
individual
 
financial
 
statements
 
from
 
the
 
beneficiary
 
concerned
70
and its linked third parties. The coordinator must include them in the next periodic report after the suspension
 
is
 
lifted
 
or
 
—
 
if
 
suspension
 
is
 
not
 
lifted
 
before
 
the
 
end
 
of
 
the
 
action
 
—
 
in
 
the
 
last
 
periodic report.
The beneficiaries may suspend implementation of the action (see Article 49.1) or terminate the Agreement or the participation of the beneficiary concerned (see Article 50.1 and 50.2).
ARTICLE 49 — SUSPENSION OF THE ACTION IMPLEMENTATION
49.1 
Suspension of the action implementation, by the
 
beneficiaries
49.1.1 
Conditions
The beneficiaries may suspend implementation of the action or any part of it, if exceptional circumstances — in particular 
force majeure 
(see Article 51) — make implementation impossible or excessively difficult.
49.1.2 
Procedure
The
 
coordinator
 
must
 
immediately
 
formally
 
notify
 
to
 
the
 
Commission
 
the
 
suspension
 
(see
 
Article
 
52), stating:
· 
the reasons why
 
and
· 
the expected date of
 
resumption.
The suspension will 
take effect 
the day this notification is received by the Commission.
Once
 
circumstances
 
allow
 
for
 
implementation
 
to
 
resume,
 
the
 
coordinator
 
must
 
immediately
 
formally notify the Commission and request an 
amendment 
of the Agreement to set the date on which the action will be resumed, extend the duration of the action and make other changes necessary to adapt the action to the new situation (see Article 55) — unless the Agreement or the participation of a beneficiary has been terminated (see Article
 
50).
The suspension will be 
lifted 
with effect from the resumption date set out in the amendment. This date may be before the date on which the amendment enters into force.
Costs incurred during suspension of the action implementation are not eligible (see Article 6).
49.2 
Suspension of the action implementation, by the
 
Commission
49.2.1 Conditions
The Commission may suspend implementation of the action or any part of it, if:
(a) 
a
 
beneficiary
 
(or
 
a
 
natural
 
person
 
who
 
has
 
the
 
power
 
to
 
represent
 
or
 
take
 
decisions
 
on
 
its
 
behalf) has committed or is suspected of having
 
committed:
(i) 
substantial errors, irregularities or fraud
 
or
(ii) 
serious breach of obligations under the Agreement or during the award procedure (including
 
improper
 
implementation
 
of
 
the
 
action,
 
submission
 
of
 
false
 
declaration,
 
failure to provide required information, breach of ethical
 
principles);
79
(b) 
a
 
beneficiary
 
(or
 
a
 
natural
 
person
 
who
 
has
 
the
 
power
 
to
 
represent
 
or
 
take
 
decisions
 
on
 
its
 
behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (
extension of findings from other grants to this grant
; see Article 22.5.2),
 
or
(c) 
the action is suspected of having lost its scientific or technological
 
relevance.
49.2.2 
Procedure
Before
 
suspending
 
implementation
 
of
 
the
 
action,
 
the
 
Commission
 
will
 
formally
 
notify
 
the
 
coordinator or beneficiary
 
concerned:
· 
informing it of its intention to suspend the implementation and the reasons why
 
and
· 
inviting it to submit observations within 30 days of receiving
 
notification.
If the Commission does not receive observations or decides to pursue the procedure despite the observations
 
it
 
has
 
received,
 
it
 
will
 
formally
 
notify
 
confirmation
 
of
 
the
 
suspension.
 
Otherwise,
 
it
 
will formally notify that the procedure is not
 
continued.
The
 
suspension
 
will
 
take
 
effect
 
five
 
days
 
after
 
confirmation
 
notification
 
is
 
received
 
(or
 
on
 
a
 
later
 
date specified in the
 
notification).
It will be 
lifted 
if the conditions for resuming implementation of the action are met.
The coordinator or beneficiary concerned will be formally notified of the lifting and the Agreement will
 
be
 
amended
 
to
 
set
 
the
 
date
 
on
 
which
 
the
 
action
 
will
 
be
 
resumed,
 
extend
 
the
 
duration
 
of
 
the
 
action and make other changes necessary to adapt the action to the new situation (see Article 55) — unless the Agreement has already been terminated (see Article
 
50).
The
 
suspension
 
will
 
be
 
lifted
 
with
 
effect
 
from
 
the
 
resumption
 
date
 
set
 
out
 
in
 
the
 
amendment.
 
This
 
date may be before the date on which the amendment enters into
 
force.
Costs incurred during suspension are not eligible (see Article 6).
The beneficiaries may not claim damages due to suspension by the Commission (see Article 46).
Suspension of the action implementation does not affect the Commission’s right to terminate the Agreement or participation of a beneficiary (see Article 50), reduce the grant or recover amounts unduly paid (see Articles 43 and 44).
ARTICLE 50 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION OF ONE OR MORE BENEFICIARIES
50.1 
Termination of the Agreement, by the
 
beneficiaries
50.1.1 
Conditions and
 
procedure
The beneficiaries may terminate the Agreement.
The coordinator must formally notify termination to the Commission (see Article 52), stating:
· 
the reasons why
 
and
· 
the date the termination will take effect. This date must be after the
 
notification.
If no reasons are given or if the Commission considers the reasons do not justify termination, the Agreement will be considered to have been ‘
terminated improperly
’.
The termination will 
take effect 
on the day specified in the notification.
50.1.2 
Effects
The coordinator must — within 60 days from when termination takes effect — submit:
(i) 
a periodic report (for the open reporting period until termination; see Article 20.3)
 
and
(ii) 
the final report (see Article
 
20.4).
If the Commission does not receive the reports within the deadline (see above), only costs which are included in an approved periodic report will be taken into account.
The Commission will 
calculate 
the final grant amount (see Article 5.3) and the balance (see    Article 21.4) on the basis of the reports submitted. Only costs incurred until termination are eligible (see Article 6). Costs relating to contracts due for execution only after termination are not
 
eligible.
Improper termination may lead to a reduction of the grant (see Article 43).
After termination, the beneficiaries’ obligations (in particular Articles 20, 22, 23, Section 3 of Chapter 4, 36, 37, 38, 40, 42, 43 and 44) continue to apply.
50.2 
Termination of the participation of one or more beneficiaries, by the
 
beneficiaries
50.2.1 
Conditions and
 
procedure
The participation of one or more beneficiaries may be terminated by the coordinator, on request of the beneficiary concerned or on behalf of the other beneficiaries.
The coordinator must formally notify termination to the Commission (see Article 52) and inform the beneficiary concerned.
If the coordinator’s participation is terminated without its agreement, the formal notification must be done by another beneficiary (acting on behalf of the other beneficiaries).
The notification must include:
· 
the reasons
 
why;
· 
the opinion of the beneficiary concerned (or proof that this opinion has been requested in writing);
· 
the date the termination takes effect. This date must be after the notification,
 
and
· 
a request for amendment (see Article 55), with a proposal for reallocation of the tasks and the estimated budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the addition of one or more new beneficiaries (see Article 56). If termination takes effect after
 
the
period set out in Article 3, no request for amendment must be included unless the beneficiary concerned is the coordinator. In this case, the request for amendment must propose a new coordinator.
If this information is not given or if the Commission considers that the reasons do not justify termination, the participation will be considered to have been 
terminated improperly
.
The termination will 
take effect 
on the day specified in the notification.
50.2.2 
Effects
The coordinator must — within 30 days from when termination takes effect — submit:
(i) 
a report on the distribution of payments to the beneficiary concerned
 
and
(ii) 
if termination takes effect during the period set out in Article 3, a ‘
termination report
’ from the beneficiary concerned, for the open reporting period until termination, containing an overview of the progress of the work, an overview of the use of resources,  the  individual
 
financial
 
statement
 
and,
 
if
 
applicable,
 
the
 
certificate
 
on
 
the
 
financial
 
statement
 
(see Articles 20.3 and
 
20.4).
The information in the termination report must also be included in the periodic report for the next reporting period (see Article 20.3).
If
 
the
 
request
 
for
 
amendment
 
is
 
rejected
 
by
 
the
 
Commission,
 
(because
 
it
 
calls
 
into
 
question
 
the
 
decision awarding
 
the
 
grant
 
or
 
breaches
 
the
 
principle
 
of
 
equal
 
treatment
 
of
 
applicants),
 
the
 
Agreement
 
may
 
be terminated according to Article
 
50.3.1(c).
If
 
the
 
request
 
for
 
amendment
 
is
 
accepted
 
by
 
the
 
Commission,
 
the
 
Agreement
 
is
 
amended
 
to
 
introduce the necessary changes (see Article
 
55).
The Commission will — on the basis of the periodic reports, the termination report and the report  on the distribution of payments — 
calculate 
the amount which is due to the beneficiary and if the (pre-financing and interim) payments received by the beneficiary exceed this
 
amount.
The 
amount which is due 
is calculated in the following steps:
Step 1 —    Application of the reimbursement rate to the eligible costs
The grant amount for the beneficiary is calculated by applying the reimbursement rate(s) to the total eligible costs declared by the beneficiary and its linked third parties in the termination report and approved by the Commission.
Only costs incurred by the beneficiary concerned until termination takes effect are eligible (see Article 6). Costs relating to contracts due for execution only after termination are not eligible.
Step
 
2
 
—
	Reduction
 
due
 
to
 
substantial
 
errors,
 
irregularities
 
or
 
fraud
 
or
 
serious
 
breach
 
of obligations
In case of a reduction (see Article 43), the Commission will calculate the reduced grant amount for the beneficiary by deducting the amount of the reduction (calculated in proportion to the seriousness of the errors, irregularities or fraud   or
breach of obligations, in accordance with Article 43.2) from the grant amount for the beneficiary.
If the payments received 
exceed the amounts due
:
· 
if termination takes effect during the period set out in Article 3 and the request for amendment
 
is
 
accepted,
 
the
 
beneficiary
 
concerned
 
must
 
repay
 
to
 
the
 
coordinator
 
the
 
amount unduly received. The Commission will formally notify the amount unduly received and request the beneficiary concerned to repay it to the coordinator within 30 days of receiving notification. If it does not repay the coordinator, the Commission will draw upon the Guarantee Fund to pay the coordinator and then notify a 
debit note 
on behalf of the Guarantee Fund to the beneficiary concerned (see Article
 
44);
· 
in
 
all
 
other
 
cases,
 
in
 
particular
 
if
 
termination
 
takes
 
effect
 
after
 
the
 
period
 
set
 
out
 
in
 
Article
 
3, the Commission will formally notify a 
debit note 
to the beneficiary concerned. If
 
payment is
 
not
 
made
 
by
 
the
 
date
 
in
 
the
 
debit
 
note,
 
the
 
Guarantee
 
Fund
 
will
 
pay
 
to
 
the
 
Commission
 
the amount due and the Commission will notify a debit note on behalf of the Guarantee Fund to the beneficiary concerned (see Article
 
44);
· 
if the beneficiary concerned is the former coordinator, it must repay the new coordinator according to the procedure above,
 
unless:
· 
termination takes effect after an interim payment
 
and
· 
the former coordinator has not distributed amounts received as pre-financing or interim payments (see Article
 
21.7).
In this case, the Commission will formally notify a 
debit note 
to the former coordinator.  If payment is not made by the date in the debit note, the Guarantee Fund will pay to the Commission
 
the
 
amount
 
due.
 
The
 
Commission
 
will
 
then
 
pay
 
the
 
new
 
coordinator
 
and
 
notify a debit note on behalf of the Guarantee Fund to the former coordinator (see Article
 
44).
If the payments received 
do not exceed the amounts due
: amounts owed to the beneficiary concerned will be included in the next interim or final payment.
If the Commission does not receive the termination report within the deadline (see above), only costs included in an approved periodic report will be taken into account.
If
 
the
 
Commission
 
does
 
not
 
receive
 
the
 
report
 
on
 
the
 
distribution
 
of
 
payments
 
within
 
the
 
deadline
 
(see above), it will consider
 
that:
· 
the coordinator did not distribute any payment to the beneficiary concerned and
 
that
· 
the beneficiary concerned must not repay any amount to the
 
coordinator.
Improper termination may lead to a reduction of the grant (see Article 43) or termination of the Agreement (see Article 50).
After
 
termination,
 
the
 
concerned
 
beneficiary’s
 
obligations
 
(in
 
particular
 
Articles
 
20,
 
22,
 
23,
 
Section
 
3 of Chapter 4, 36, 37, 38, 40, 42, 43 and 44) continue to
 
apply.
50.3 
Termination of the Agreement or the participation of one or more beneficiaries, by
 
the Commission
50.3.1 
Conditions
The Commission may terminate the Agreement or the participation of one or more beneficiaries, if:
(a) 
one or more beneficiaries do not accede to the Agreement (see Article
 
56);
(b) 
a change to their legal, financial, technical, organisational or ownership situation (or those of its linked third parties) is likely to substantially affect or delay the implementation of the action or calls into question the decision to award the
 
grant;
(c) 
following
 
termination
 
of
 
participation
 
for
 
one
 
or
 
more
 
beneficiaries
 
(see
 
above),
 
the
 
necessary changes
 
to
 
the
 
Agreement
 
would
 
call
 
into
 
question
 
the
 
decision
 
awarding
 
the
 
grant
 
or
 
breach the principle of equal treatment of applicants (see Article
 
55);
(d) 
implementation of the action is prevented by force majeure (see Article 51) or suspended by the coordinator (see Article 49.1) and
 
either:
(i) 
resumption is impossible,
 
or
(ii) 
the necessary changes to the Agreement would call into question the decision
 
awarding the grant or breach the principle of equal treatment of
 
applicants;
(e) 
a beneficiary is declared bankrupt, being wound up, having its affairs administered by the courts, has entered into an arrangement with creditors, has suspended business activities, or is subject to any other similar proceedings or procedures under national
 
law;
(f) 
a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has been found guilty of professional misconduct, proven by any
 
means;
(g) 
a beneficiary does not comply with the applicable national law on taxes and social
 
security;
(h) 
the action has lost scientific or technological
 
relevance;
(i) 
not
 
applicable;
(j) 
not
 
applicable;
(k) 
a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed fraud, corruption, or is involved in a criminal organisation, money laundering or any other illegal
 
activity;
(l) 
a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has
 
committed:
(i) 
substantial errors, irregularities or fraud
 
or
(ii) 
serious breach of obligations under the Agreement or during the award procedure (including improper implementation of the action, submission of false information, failure to provide required information, breach of ethical
 
principles);
(m) 
a beneficiary has committed — in other EU or Euratom grants awarded to it under similar conditions
 
—
 
systemic
 
or
 
recurrent
 
errors,
 
irregularities,
 
fraud
 
or
 
serious
 
breach
 
of
 
obligations that have a material impact on this grant (
extension of findings from other grants to this grant
; see Article
 
22.5.2).
(n) 
despite a specific request by the Commission, a beneficiary does not request — through the coordinator — an amendment to the Agreement to end the participation of one of its linked third parties that is in one of the situations under points (e), (f), (g), (k), (l) or (m) and to reallocate its
 
tasks.
50.3.2 
Procedure
Before terminating the Agreement or participation of one or more beneficiaries, the Commission will formally notify the coordinator or beneficiary concerned:
· 
informing it of its intention to terminate and the reasons why
 
and
· 
inviting it, within 30 days of receiving notification, to submit observations and — in case of Point (l.ii) above — to inform the Commission of the measures to ensure compliance with
 
the obligations under the
 
Agreement.
If the Commission does not receive observations or decides to pursue the procedure despite the observations it has received, it will formally notify to the coordinator or beneficiary concerned 
confirmation
 
of
 
the
 
termination
 
and
 
the
 
date
 
it
 
will
 
take
 
effect.
 
Otherwise,
 
it
 
will
 
formally
 
notify
 
that the procedure is not
 
continued.
The termination will 
take effect
:
· 
for
 
terminations
 
under
 
Points
 
(b),
 
(c),
 
(e),
 
(g),
 
(h),
 
(j),
 
(l.ii)
 
and
 
(n)
 
above:
 
on
 
the
 
day
 
specified in the notification of the confirmation (see
 
above);
· 
for terminations under Points (a), (d), (f), (i), (k), (l.i) and (m) above: on the day after the notification of the confirmation is
 
received.
50.3.3 
Effects
(a) 
for 
termination of the
 
Agreement
:
The coordinator must — within 60 days from when termination takes effect — submit:
(i) 
a
 
periodic
 
report
 
(for
 
the
 
last
 
open
 
reporting
 
period
 
until
 
termination;
 
see
 
Article
 
20.3)
 
and
(ii) 
a final report (see Article
 
20.4).
If
 
the
 
Agreement
 
is
 
terminated
 
for
 
breach
 
of
 
the
 
obligation
 
to
 
submit
 
reports
 
(see
 
Articles
 
20.8 and 50.3.1(l)), the coordinator may not submit any reports after
 
termination.
If the Commission does not receive the reports within the deadline (see above), only costs which are included in an approved periodic report will be taken into account.
The Commission will 
calculate 
the final grant amount (see Article 5.3) and the balance (see Article 21.4) on the basis of the reports submitted. Only costs incurred until termination takes effect are eligible (see Article 6). Costs relating to contracts due for execution only after termination are not eligible.
This does not affect the Commission’s right to reduce the grant (see Article 43) or to impose administrative sanctions (Article 45).
The beneficiaries may not claim damages due to termination by the  Commission  (see  Article
 
46).
After termination, the beneficiaries’ obligations (in particular Articles 20, 22, 23, Section 3
 
of Chapter 4, 36, 37, 38, 40, 42, 43 and 44) continue to
 
apply.
(b) 
for 
termination of the participation of one or more
 
beneficiaries
:
The coordinator must — within 60 days from when termination takes effect — submit:
(i) 
a report on the distribution of payments to the beneficiary
 
concerned;
(ii) 
a
 
request
 
for
 
amendment
 
(see
 
Article
 
55),
 
with
 
a
 
proposal
 
for
 
reallocation
 
of
 
the
 
tasks
 
and estimated budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the addition of one or more new beneficiaries (see Article 56). If termination is notified after the period set out in Article 3, no request for amendment must be submitted unless the
 
beneficiary
 
concerned
 
is
 
the
 
coordinator.
 
In
 
this
 
case
 
the
 
request
 
for
 
amendment
 
must propose a new coordinator,
 
and
(iii) 
if termination takes effect during the period set out in Article 3, a 
termination report 
from
 
the
 
beneficiary
 
concerned,
 
for
 
the
 
open
 
reporting
 
period
 
until
 
termination,
 
containing an overview of the progress of the work, an overview of the use of resources, the individual
 
financial
 
statement
 
and,
 
if
 
applicable,
 
the
 
certificate
 
on
 
the
 
financial
 
statement (see Article
 
20).
The information in the termination report must also be included in the periodic report for the next reporting period (see Article 20.3).
If the request for amendment is rejected by the Commission, (because it calls into question the decision awarding the grant or breaches the principle of equal treatment of applicants),
 
the Agreement may be terminated according to Article
 
50.3.1(c).
If the request for amendment is accepted by the Commission, the Agreement is 
amended 
to introduce the necessary changes (see Article 55).
The Commission will — on the basis of the periodic reports, the termination report and the report
 
on
 
the
 
distribution
 
of
 
payments
 
—
 
calculate
 
the
 
amount
 
which
 
is
 
due
 
to
 
the
 
beneficiary and
 
if
 
the
 
(pre-financing
 
and
 
interim)
 
payments
 
received
 
by
 
the
 
beneficiary
 
exceed
 
this
 
amount.
The 
amount which is due 
is calculated in the following steps:
Step
 
1
 
—
	Application of the reimbursement rate to the eligible
 
costs
The grant amount for the beneficiary is calculated by applying the reimbursement rate(s) to the total eligible costs declared by the beneficiary and its linked third parties in the termination report and approved by the Commission.
Only costs incurred by the beneficiary concerned until termination takes effect
 
are
 
eligible
 
(see
 
Article
 
6).
 
Costs
 
relating
 
to
 
contracts
 
due
 
for
 
execution only after termination are not
 
eligible.
Step
 
2
 
—
	Reduction due to substantial errors, irregularities or fraud or 
 
serious
 
breach
 
of
 
obligations
In case of a reduction (see Article 43), the Commission will calculate       the reduced grant amount for the beneficiary by deducting the amount of  the reduction (calculated in proportion to the seriousness of the errors, irregularities or fraud or breach of obligations, in accordance with Article 43.2) from the grant amount for the
 
beneficiary.
If the payments received 
exceed the amounts due
:
· 
if termination takes effect during the period set out in Article 3 and the request for amendment is accepted, the beneficiary concerned must repay to the coordinator
 
the amount unduly received. The Commission will formally notify the amount unduly received and request the beneficiary concerned to repay it to the coordinator within 30
 
days
 
of
 
receiving
 
notification.
 
If
 
it
 
does
 
not
 
repay
 
the
 
coordinator,
 
the
 
Commission will draw upon the Guarantee Fund to pay the coordinator and then notify a 
debit note 
on behalf of the Guarantee Fund to the beneficiary concerned (see Article
 
44);
· 
in all other cases, in particular if termination takes effect after the period set out      in Article 3, the Commission will formally notify a 
debit note 
to the beneficiary concerned. If payment is not made by the date in the debit note, the Guarantee Fund will pay to the Commission the amount due and the Commission will notify a debit note on behalf of the Guarantee Fund to the beneficiary concerned (see Article
 
44);
· 
if the beneficiary concerned is the former coordinator, it must repay the new coordinator according to the procedure above,
 
unless:
· 
termination takes effect after an interim payment
 
and
· 
the former coordinator has not distributed amounts received as pre-financing or interim payments (see Article
 
21.7).
In this case, the Commission will formally notify a 
debit note 
to the former coordinator.
 
If
 
payment
 
is
 
not
 
made
 
by
 
the
 
date
 
in
 
the
 
debit
 
note,
 
the
 
Guarantee
 
Fund will pay to the Commission the amount due. The Commission will then pay the
 
new coordinator and notify a debit note on behalf of the Guarantee Fund to the former coordinator (see Article
 
44).
If
 
the
 
payments
 
received
 
do
 
not
 
exceed
 
the
 
amounts
 
due
:
 
amounts
 
owed
 
to
 
the
 
beneficiary concerned will be included in the next interim or final
 
payment.
If
 
the
 
Commission
 
does
 
not
 
receive
 
the
 
termination
 
report
 
within
 
the
 
deadline
 
(see
 
above),
 
only costs included in an approved periodic report will be taken into
 
account.
If the Commission does not receive the report on the distribution of payments within the deadline (see above), it will consider that:
· 
the coordinator did not distribute any payment to the beneficiary concerned and
 
that
· 
the beneficiary concerned must not repay any amount to the
 
coordinator.
After termination, the concerned beneficiary’s obligations (in particular Articles 20, 22, 23, Section 3 of Chapter 4, 36, 37, 38, 40, 42, 43 and 44) continue to apply.
SECTION 4   FORCE MAJEURE
ARTICLE 51 — FORCE MAJEURE
‘Force majeure’ means any situation or event that:
· 
prevents either party from fulfilling their obligations under the
 
Agreement,
· 
was unforeseeable, exceptional situation and beyond the parties’
 
control,
· 
was not due to error or negligence on their part (or on the part of third parties involved in the action),
 
and
· 
proves to be inevitable in spite of exercising all due
 
diligence.
The following cannot be invoked as force majeure:
· 
any default of a service, defect in equipment or material or delays in making them available, unless they stem directly from a relevant case of force
 
majeure,
· 
labour disputes or strikes,
 
or
· 
financial
 
difficulties.
Any situation constituting force majeure must be formally notified to the other party without delay, stating the nature, likely duration and foreseeable effects.
The parties must immediately take all the necessary steps to limit any damage due to force majeure and do their best to resume implementation of the action as soon as possible.
The party prevented by force majeure from fulfilling its obligations under the Agreement cannot be considered in breach of them.
CHAPTER 7   FINAL PROVISIONS
ARTICLE 52 — COMMUNICATION BETWEEN THE PARTIES
52.1 
Form and means of
 
communication
Communication
 
under
 
the
 
Agreement
 
(information,
 
requests,
 
submissions,
 
‘formal
 
notifications’,
 
etc.) must:
· 
be made in writing
 
and
· 
bear the number of the
 
Agreement.
80
Until
 
the
 
payment
 
of
 
the
 
balance
:
 
all
 
communication
 
must
 
be
 
made
 
through
 
the
 
electronic
 
exchange system and using the forms and templates provided
 
there.
After the payment of the balance
: formal notifications must be made by registered post with proof of delivery (‘formal notification on paper’).
Communications
 
in
 
the
 
electronic
 
exchange
 
system
 
must
 
be
 
made
 
by
 
persons
 
authorised
 
according
 
to the
 
Participant
 
Portal
 
Terms
 
&
 
Conditions.
 
For
 
naming
 
the
 
authorised
 
persons,
 
each
 
beneficiary
 
must have
 
designated
 
—
 
before
 
the
 
signature
 
of
 
this
 
Agreement
 
—
 
a
 
‘legal
 
entity
 
appointed
 
representative (LEAR)’.
 
The
 
role
 
and
 
tasks
 
of
 
the
 
LEAR
 
are
 
stipulated
 
in
 
his/her
 
appointment
 
letter
 
(see
 
Participant Portal 
Terms 
&
 
Conditions).
If the electronic exchange system is temporarily unavailable, instructions will be given on the Commission websites.
52.2 
Date of
 
communication
Communications 
are considered to have been made when they are sent by the sending party (i.e.
 
on the date and time they are sent through the electronic exchange
 
system).
Formal
 
notifications
 
through
 
the
 
electronic
 
exchange
 
system
 
are
 
considered
 
to
 
have
 
been
 
made
 
when they
 
are
 
received
 
by
 
the
 
receiving
 
party
 
(i.e.
 
on
 
the
 
date
 
and
 
time
 
of
 
acceptance
 
by
 
the
 
receiving
 
party, 
as
 
indicated
 
by
 
the
 
time
 
stamp).
 
A
 
formal
 
notification
 
that
 
has
 
not
 
been
 
accepted
 
within
 
10
 
days
 
after sending is considered to have been
 
accepted.
Formal
 
notifications
 
on
 
paper
 
sent
 
by
 
registered
 
post
 
with
 
proof
 
of
 
delivery
 
(only
 
after
 
the
 
payment of the balance) are considered to have been made on
 
either:
· 
the delivery date registered by the postal service
 
or
· 
the deadline for collection at the post
 
office.
If the electronic exchange system is temporarily unavailable, the sending party cannot be considered in breach of its obligation to send a communication within a specified deadline.
52.3 
Addresses for
 
communication
The 
electronic 
exchange system must be accessed via the following URL: 
https://ec.europa.eu/research/participants/portal/desktop/en/projects/
The Commission will formally notify the coordinator and beneficiaries in advance any changes to this URL.
Formal notifications on paper 
(only after the payment of the balance) addressed 
to the Commission
must be sent to the following address:
European Commission
Communications Networks, Content and Technology Data Policy & Innovation
L-2920 Luxembourg Luxembourg
Formal notifications on paper (only after the payment of the balance) addressed 
to the beneficiaries
must be sent to their legal address as specified in the Participant Portal Beneficiary Register.
84
ARTICLE 53 — INTERPRETATION OF THE AGREEMENT
53.1 
Precedence of the 
Terms 
and Conditions over the
 
Annexes
The provisions in the Terms and Conditions of the Agreement take precedence over its Annexes. Annex 2 takes precedence over Annex 1.
53.2 
Privileges and
 
immunities
Not applicable
ARTICLE 54 — CALCULATION OF PERIODS, DATES AND DEADLINES
In
 
accordance
 
with
 
Regulation
 
No
 
1182/71
28
,
 
periods
 
expressed
 
in
 
days,
 
months
 
or
 
years
 
are
 
calculated from the moment the triggering event
 
occurs.
The day during which that event occurs is not considered as falling within the period.
ARTICLE 55 — AMENDMENTS TO THE AGREEMENT
55.1 
Conditions
The Agreement may be amended, unless the amendment entails changes to the Agreement which would call into question the decision awarding the grant or breach the principle of equal treatment of
 
applicants.
Amendments may be requested by any of the parties.
55.2 
Procedure
The party requesting an amendment must submit a request for amendment signed in the electronic exchange system (see Article 52).
The coordinator submits and receives requests for amendment on behalf of the beneficiaries (see Annex 3).
If
 
a
 
change
 
of
 
coordinator
 
is
 
requested
 
without
 
its
 
agreement,
 
the
 
submission
 
must
 
be
 
done
 
by
 
another beneficiary (acting on behalf of the other
 
beneficiaries).
The request for amendment must include:
· 
the reasons
 
why;
· 
the appropriate supporting
 
documents;
· 
for
 
a
 
change
 
of
 
coordinator
 
without
 
its
 
agreement:
 
the
 
opinion
 
of
 
the
 
coordinator
 
(or
 
proof
 
that this opinion has been requested in
 
writing).
The Commission may request additional information.
28 
Regulation (EEC, Euratom) No 1182/71 of the Council of 3 June 1971 determining the rules applicable to periods, dates and time-limits (OJ L 124, 8.6.1971, p. 1).
If
 
the
 
party
 
receiving
 
the
 
request
 
agrees,
 
it
 
must
 
sign
 
the
 
amendment
 
in
 
the
 
electronic
 
exchange
 
system within
 
45
 
days
 
of
 
receiving
 
notification
 
(or
 
any
 
additional
 
information
 
the
 
Commission
 
has
 
requested). If it does not agree, it must formally notify its disagreement within the same deadline. The deadline may be extended, if necessary for the assessment of the request. If no notification is received within the deadline, the request is considered to have been
 
rejected
An amendment 
enters into force 
on the day of the signature of the receiving party.
An
 
amendment
 
takes
 
effect
 
on
 
the
 
date
 
agreed
 
by
 
the
 
parties
 
or,
 
in
 
the
 
absence
 
of
 
such
 
an
 
agreement, on the date on which the amendment enters into
 
force.
ARTICLE 56 — ACCESSION TO THE AGREEMENT
56.1 
Accession of the beneficiaries mentioned in the
 
Preamble
The
 
other
 
beneficiaries
 
must
 
accede
 
to
 
the
 
Agreement
 
by
 
signing
 
the
 
Accession
 
Form
 
(see
 
Annex
 
3)
 
in the
 
electronic
 
exchange
 
system
 
(see
 
Article
 
52)
 
within
 
30
 
days
 
after
 
its
 
entry
 
into
 
force
 
(see
 
Article
 
58).
They
 
will
 
assume
 
the
 
rights
 
and
 
obligations
 
under
 
the
 
Agreement
 
with
 
effect
 
from
 
the
 
date
 
of
 
its
 
entry into force (see Article
 
58).
If a beneficiary does not accede to the Agreement within the above deadline, the coordinator must
· 
within 30 days — request an amendment to make any changes necessary to ensure proper implementation
 
of
 
the
 
action.
 
This
 
does
 
not
 
affect
 
the
 
Commission’s
 
right
 
to
 
terminate
 
the
 
Agreement (see Article
 
50).
56.2 
Addition of new
 
beneficiaries
In justified cases, the beneficiaries may request the addition of a new beneficiary.
For
 
this
 
purpose,
 
the
 
coordinator
 
must
 
submit
 
a
 
request
 
for
 
amendment
 
in
 
accordance
 
with
 
Article
 
55. It must include an Accession Form (see Annex 3) signed by the new beneficiary in the electronic exchange system (see Article
 
52).
New beneficiaries must assume the rights and obligations under the Agreement with effect from the date of their accession specified in the Accession Form (see Annex 3).
ARTICLE 57 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES
57.1 
Applicable
 
law
The Agreement is governed by the applicable EU law, supplemented if necessary by the law of Belgium.
57.2 
Dispute
 
settlement
If a dispute concerning the interpretation, application or validity of the Agreement cannot be settled amicably,
 
the
 
General
 
Court
 
—
 or, 
on
 
appeal,
 
the
 
Court
 
of
 
Justice
 
of
 
the
 
European
 
Union
 
—
 
has
 
sole jurisdiction. Such actions must be brought under Article 272 of the Treaty on the Functioning of the EU
 
(TFEU).
As an exception, if such a dispute is between the Commission and STIFTELSEN SINTEF, SINTEF FISKERI
 
OG
 
HAVBRUK
 
AS,
 
IBM
 
ISRAEL
 
-
 
SCIENCE
 
AND
 
TECHNOLOGY
 
LTD,
 
KINGS
 
BAY
AS, EROS AS, ERVIK & SAEVIK AS, LIEGRUPPEN FISKERI AS, CSEM CENTRE SUISSE D'ELECTRONIQUE ET DE MICROTECHNIQUE SA - RECHERCHE ET   DEVELOPPEMENT,
UNIVERSITAET ST. GALLEN, NORGES SILDESALGSLAG SA, the competent Belgian courts have sole jurisdiction.
If
 
a
 
dispute
 
concerns
 
administrative
 
sanctions,
 
offsetting
 
or
 
an
 
enforceable
 
decision
 
under
 
Article
 
299 TFEU (see Articles 44, 45 and 46), the beneficiaries must bring action before the General Court — 
or, 
on appeal, the Court of Justice of the European Union — under Article 263 TFEU.
ARTICLE 58 — ENTRY INTO FORCE OF THE AGREEMENT
The Agreement will enter into force on the day of signature by the Commission or the coordinator, depending on which is later.
SIGNATURES
For
 
the
 
coordinator
	For the
 
Commission
Alexandros Stergios MANOS with ECAS id nmnosale signed in the Participant Portal on 26/10/2016 at 09:42:11 (transaction id SigId-55133- ZimW3ysw8qxPLR0ftAoGUeLxo6ngDfiOyS6OH0ly6bGVXzqjq7VFLfmq hOMcJXJWq4GnzfljbM5vFfRxgzgMdZm-Jj71zxYb8yrkmoAceBIUCa- ACzzzzJEnBcEy2SGoP5cmoYbfsv1WkRsi4KKfb58vN7I). Timestamp by third party at
Wed Oct 26 10:42:23 CEST 2016


Signed by Gustav KALBE with ECAS id kalbegu as an authorised representative on 09-11-2016 09:26:09 (transaction id SigId-18158- KySDD1cnskVZRtLbSQhirJEGbicBSoxebUVYzzgcZB3mzo0DuS9 RoQX94MbfiddLM2Xpn2XkHrFMYgIE7ip9vHG- PHslUMVSXYCEbaUOEcOk1C-
8rnuC33rsBdzWHb0qzuFZzTi5Hzbjy6euEYqD8UTzjg
EW) Wed Nov 09 09:26:16 CET 201
Digitally sealed by the European Commission Date: 2016.10.19 13:56:00 CEST
This document is digitally sealed. The digital sealing mechanism uniquely binds the document to the modules of the Participant Portal of the European Commission, to the transaction for which it was generated and ensures its integrity and authenticity.
Any attempt to modify the content will lead to a breach of the electronic seal, which can be verified at any time by clicking on the digital seal validation symbol.
Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. 
+32 22991111