Upozornění: Text přílohy byl získán strojově a nemusí přesně odpovídat originálu. Zejména u strojově nečitelných smluv, kde jsme použili OCR. originál smlouvy stáhnete odsud
EUROPEAN COMMISSION
Communications Networks, Content and Technology
Data
Data Policy & Innovation
GRANT AGREEMENT NUMBER — 732064 —
DataBio
This
Agreement
(‘the Agreement’) is
between
the following parties:
on the one part,
the
European Union
(‘the EU’), represented by the European Commission ('the Commission'),
represented
for
the
purposes
of
signature
of
this
Agreement
by
Acting
Head
of
Unit,
Communications Networks, Content and
Technology,
Data, Administration and Finance, Gustav
KALBE,
and
on the other part,
1.
‘the
coordinator’:
INTRASOFT INTERNATIONAL SA (INTRASOFT)
SA, 472324870, established in
RUE
MONTOYER 40, BRUXELLES 1000, Belgium, VAT number BE0472324870, represented for the purposes of signing the Agreement by CEO, Alexandros Stergios MANOS
and the following other beneficiaries, if they sign their ‘Accession Form’ (see Annex 3 and Article 56):
2.
LESPROJEKT SLUZBY SRO (LESPRO)
SRO, 47537256, established in MARTINOV 197,
ZARYBY
27713, Czech
Republic,
3.
ZAPADOCESKA UNIVERZITA V PLZNI (UWB)
, 3141991/49777513, established in UNIVERZITNI 8, PILSEN 30614, Czech Republic,
VAT
number
CZ49777513,
4.
FRAUNHOFER GESELLSCHAFT ZUR FOERDERUNG DER
ANGEWANDTEN
FORSCHUNG
E.V.
(Fraunhofer)
EV, VR4461, established in HANSASTRASSE 27C, MUNCHEN 80686, Germany,
VAT
number
DE129515865,
5.
ATOS
SPAIN
SA
(ATOS)
SA,
M64516,
established
in
CALLE
DE
ALBARRACIN
25,
MADRID 28037, Spain,
VAT
number
ESA28240752,
6.
STIFTELSEN SINTEF (SINTEF ICT)
NO1, 948007029, established in STRINDVEIEN 4, TRONDHEIM 7034, Norway,
VAT
number
NO948007029MVA,
7.
SPACEBEL
SA (SPACEBEL)
SA, LG165621, established in RUE DES CHASSEURS ARDENNAIS 6, LIEGE ANGLEUR 4031, Belgium,
VAT
number
BE0435536532,
8.
VLAAMSE INSTELLING VOOR TECHNOLOGISCH ONDERZOEK
N.V.
(VITO)
BE31, 244195916, established in
BOERETANG
200, MOL 2400, Belgium,
VAT
number
BE0244195916,
Grant Agreement number: 732064 — DataBio — H2020-ICT-2016-2017/H2020-ICT-2016-1
Associated with document Ref. Ares(2016)6013200 - 19/10/2016
2
9.
INSTYTUT CHEMII BIOORGANICZNEJ POLSKIEJ AKADEMII NAUK (PSNC)
, 000849327, established in NOSKOWSKIEGO 12-14, POZNAN 61 704, Poland,
VAT
number PL7770002062,
10.
CIAOTECH Srl (CiaoT)
SRL, 1000785, established in VIA
PALESTRINA
25, ROMA 00189, Italy,
VAT
number
IT06963331001,
11.
EMPRESA DE TRANSFORMACION AGRARIA SA (TRAGSA)
SA, 37224, established
in CALLE MALDONADO 58, MADRID 28006, Spain,
VAT
number
ESA28476208,
12.
INSTITUT FUR
ANGEWANDTE
INFORMATIK
(INFAI)
EV
(INFAI)
EV, VR4342, established in HAINSTRASSE 11, LEIPZIG 04109,
Germany,
13.
NEUROPUBLIC AE PLIROFORIKIS & EPIKOINONION (NP)
AE, 45219, established in METHONIS 6 KAI SPILIOTOPOULOU, PEIRAIAS 18545, Greece,
VAT
number
EL999608870,
14.
Ústav pro hospodářskou úpravu lesů Brandýs nad Labem (UHUL FMI)
, 00020681, established in Nábřežní 1326, Brandýs nad Labem 250 01, Czech Republic,
VAT
number CZ00020681,
15.
INNOVATION
ENGINEERING SRL (InnoE)
SRL, 1238966/CF1053833100, established in
Via
Palestrina 25, Rome 00189, Italy,
VAT
number
IT10538331009,
16.
Teknologian tutkimuskeskus VTT Oy (VTT)
FI21, 26473754, established in VUORIMIEHENTIE 3, Espoo 02150, Finland,
VAT
number
FI26473754,
17.
SINTEF FISKERI OG
HAVBRUK
AS (SINTEF Fishery)
AS, 980478270, established in Brattørkaia 17B, TRONDHEIM 7465, Norway,
VAT
number
NO980478270,
18.
SUOMEN METSAKESKUS-FINLANDS SKOGSCENTRAL (METSAK)
, 24409214, established in ALEKSANTERINKATU 18A, LAHTI 15140, Finland,
VAT
number
FI24409214,
19.
IBM ISRAEL - SCIENCE AND TECHNOLOGY
LTD
(IBM)
, 51-096471-1, established in 94 DERECH
EM-HAMOSHAVOT,
PETACH
TIKVA
49527, Israel,
VAT
number
IL95432408,
20.
MHG SYSTEMS OY - MHGS (MHGS)
, 19626097, established in
PATTERISTONKATU
-
C/ O MIKPOLI MC - 2, MIKKELI 50100, Finland,
VAT
number
FI19626097,
21.
NB ADVIES BV (NB Advies)
BV, 65961900, established in ZUIDERDIEP 222, 2E EXLOERMOND 9571 BM, Netherlands,
VAT
number
NL856335022B01,
22.
CONSIGLIO
PER
LA
RICERCA
IN
AGRICOLTURA
E
L'ANALISI
DELL'ECONOMIA AGRARIA (CREA)
, 1246261, established in VIA PO 14, ROMA 00198, Italy,
VAT
number IT08183101008,
23.
FUNDACION AZTI - AZTI FUNDAZIOA (AZTI)
ES3, F38, established in TXATXARRAMENDI
UGARTEA
Z/G,
SUKARRIETA
48395,
Spain,
VAT
number
ESG48939508,
24.
KINGS
BAY
AS (KingsBay)
AS, 879946832, established in ., LEINOY 6094, Norway,
VAT
number
NO879946832MVA,
25.
EROS AS (Eros)
AS, 977390176, established in 6092
FOSNAVAAG,
HEROY 1515, Norway,
VAT
number
NO977390176MVA,
26.
ERVIK & SAEVIK AS (ESAS)
AS, 990136556, established in MMC BYGGET MJOLSTADNESET,
FOSNAVAG
6092, Norway,
VAT
number
NO990136556MVA,
27.
LIEGRUPPEN
FISKERI
AS
(LiegFi)
AS,
979468970,
established
in
GRONAMYRVEGEN
2, STRAUME 5353, Norway,
VAT
number
NO979468970MVA,
28.
E-GEOS
SPA
(e-geos)
SPA,
67388/CF01032180778, established in CONTRADA TERLECCHIE,
MATERA
75100, Italy,
VAT
number
IT01032180778,
29.
DANMARKS TEKNISKE UNIVERSITET (DTU)
, 30060946, established in ANKER ENGELUNDSVEJ
1
BYGNING
101
A,
KGS
LYNGBY
2800,
Denmark,
VAT
number
DK30060946,
30.
FEDERUNACOMA SRL UNIPERSONALE (Federu)
SRL, 408195, established in VIA ALDO MORO 64 TORRE 1, BOLOGNA 40127, Italy,
VAT
number
IT04227291004,
31.
CSEM CENTRE SUISSE D'ELECTRONIQUE ET DE MICROTECHNIQUE SA - RECHERCHE ET DEVELOPPEMENT (CSEM)
SA, CH64510005639, established in RUE JAQUET DROZ 1, NEUCHATEL 2002, Switzerland,
VAT
number CHE106080392TVA,
as ‘beneficiary not receiving EU funding’ (see Article
9),
32.
UNIVERSITAET
ST.
GALLEN
(UStG)
,
N/A,
established
in
DUFOURSTRASSE
50,
ST
GALLEN 9000, Switzerland,
VAT
number CHE115978205,
as ‘beneficiary not receiving EU funding’ (see Article
9),
33.
NORGES SILDESALGSLAG SA (Sildes)
SA, 951206091, established in
SLOTTSGATEN
3, BERGEN 5003, Norway,
VAT
number
NO951206091MVA,
34.
EXUS
SOFTWARE
LTD
(EXUS)
, 07932357, established in OLD BROAD STREET 25 TOWER 42, LONDON EC2N 1PB, United Kingdom,
VAT
number
GB141852815,
35.
CYBERNETICA
AS
(CYBER)
AS,
10140133,
established
in
MAEALUSE
2,
TALLINN
12618, Estonia,
VAT
number
EE100322358,
36.
GAIA EPICHEIREIN ANONYMI
ETAIREIA
PSIFIAKON YPIRESION (GAIA)
AE, 128737001000, established in 2, LEOFOROS KIFISIAS KAI
PARADEISOU
STR., MAROUSI 15125, Greece,
VAT
number
EL800548182,
37.
SOFTEAM (Softeam)
FR39, RCS
PARIS
B 352 649 339, established in
Avenue Victor
Hugo 21,
PARIS
75016, France,
VAT
number
FR69352649339,
38.
FUNDACION
CITOLIVA,
CENTRO
DE
INNOVACION
Y
TECNOLOGIA
DEL
OLIVAR
Y DEL ACEITE
(CITOLIVA)
ES3, JA860, established in CALLE SIERRA MORENA MANZANA
PARQUE
CIENTIFICO
TECNOLOGICO
GEOLIT
EDIFICIO
CTSA
MODULO
1
11, MENGIBAR JAEN 23620, Spain,
VAT
number
ESG23490584,
39.
TERRASIGNA SRL
(TerraS)
SRL, J4093892001, established in STRADA COZLA 6 BL A8 SC 2 ET 1 AP 21 SECTOR 3, BUCURESTI 032733, Romania,
VAT
number
RO14283349,
40.
ETHNIKO KENTRO EREVNAS KAI TECHNOLOGIKIS ANAPTYXIS (CERTH)
GR8, PD772000,
established
in
CHARILAOU
THERMI
ROAD
6
KM,
THERMI
THESSALONIKI
57001, Greece,
VAT
number
EL099785242,
41.
METEOROLOGICAL
AND
ENVIRONMENTAL
EARTH
OBSERVATION
SRL
(MEEO)
SRL, 184122, established in VIALE VOLANO 195A IN2, FERRARA 44123, Italy,
VAT
number IT01629630383,
42.
ECHEBASTAR FLEET SOCIEDAD
LIMITADA
(ECHEBF)
SL, BI40934, established in VP/ MUELLE ERROSAPE, S/N, BERMEO 48370, Spain,
VAT
number
ESB95337432,
43.
NOVAMONT
SPA
(Novam)
SPA,
171484/CF08526630150, established in VIA GIACOMO
FAUSER
8,
NOVARA
28100, Italy,
VAT
number
IT01593330036,
44.
Senop
Oy
(Senop)
OY
OYJ,
FI17959269,
established
in
Lentolantie
7,
Kangasala
36220,
Finland,
VAT
number
FI17959269,
45.
UNIVERSIDAD DEL
PAIS
VASCO/
EUSKAL HERRIKO UNIBERTSITATEA (EHU/ UPV)
,
established
in
BARRIO
SARRIENA
S
N,
LEIOA
48940,
Spain,
VAT
number
ESQ4818001B,
46.
OPEN GEOSPATIAL CONSORTIUM (EUROPE) LIMITED LBG (OGCE)
GB5, 03999270, established in
GRAY
S INN ROAD 236 FLOOR 1, LONDON WC1X 8HL, United Kingdom,
VAT
number
GB802241873,
47.
ZETOR
TRACTORS
AS
(ZETOR)
AS,
26921782,
established
in
TRNKOVA
3060/111,
BRNO 628 00, Czech Republic,
VAT
number
CZ26921782,
48.
COOPERATIVA
AGRICOLA
CESENATE SOCIETA
COOPERATIVA
AGRICOLA (CAC)
SC, 34655, established in VIA CALCINARO 1450, CESENA 47251, Italy,
VAT
number IT00144040409,
Unless otherwise specified, references to ‘beneficiary’ or ‘beneficiaries’ include the coordinator.
The
parties
referred
to
above
have
agreed
to
enter
into
the
Agreement
under
the
terms
and
conditions
below.
By signing the Agreement or the Accession Form, the beneficiaries accept the grant and agree to implement it under their own responsibility and in accordance with the Agreement, with all the obligations and conditions it sets out.
The Agreement is composed of: Terms and Conditions
Annex
1
Description of
the
action
Annex
2
Estimated budget for the
action
2a Additional information on the estimated budget Annex
3
Accession
Forms
Annex 4 Model for the financial statements
Annex
5
Model for the certificate on the
financial
statements
Annex
6
Model for the certificate on the
methodology
TERMS AND CONDITIONS
TABLE OF CONTENTS
CHAPTER
1
GENERAL
13
ARTICLE 1 — SUBJECT OF
THE
AGREEMENT
13
CHAPTER
2
ACTION
13
ARTICLE 2 — ACTION TO
BE
IMPLEMENTED
13
ARTICLE 3 —
DURATION
AND
STARTING
DATE
OF
THE
ACTION
13
ARTICLE 4 —
ESTIMATED
BUDGET AND
BUDGET
TRANSFERS
13
48.1
Estimated
budget
13
48.2
Budget
transfers
13
CHAPTER
3
GRANT
13
ARTICLE 5 — GRANT
AMOUNT,
FORM OF
GRANT,
REIMBURSEMENT
RATES
AND FORMS OF
COSTS
13
5.1
Maximum
grant
amount
13
5.2
Form of grant, reimbursement rates and forms
of
costs
14
5.3
Final grant amount
—
Calculation
14
5.4
Revised final grant amount
—
Calculation
16
ARTICLE 6 — ELIGIBLE AND INELIGIBLE
COSTS
16
6.1
General conditions for costs to
be
eligible
16
6.2
Specific conditions for costs to
be
eligible
17
6.3
Conditions for costs of linked third parties to
be
eligible
23
6.4
Conditions for in-kind contributions provided by third parties free of charge to
be eligible
23
6.5
Ineligible
costs
23
6.6
Consequences of declaration of
ineligible
costs
23
CHAPTER 4 RIGHTS AND OBLIGATIONS OF
THE
PARTIES
24
SECTION 1 RIGHTS AND OBLIGATIONS
RELATED
TO IMPLEMENTING THE
ACTION
24
ARTICLE 7 — GENERAL
OBLIGATION
TO
PROPERLY
IMPLEMENT
THE
ACTION
24
7.1
General obligation to properly implement
the
action
24
7.2
Consequences
of
non-compliance
24
ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD
PARTIES
INVOLVED
IN THE
ACTION
24
ARTICLE 9 — IMPLEMENTATION OF ACTION
TASKS
BY BENEFICIARIES NOT RECEIVING EU
FUNDING
24
9.1
Rules for the implementation of action tasks by beneficiaries not receiving
EU
funding
24
9.2
Consequences
of
non-compliance
25
ARTICLE 10 — PURCHASE OF GOODS, WORKS
OR
SERVICES
25
10.1
Rules for purchasing goods, works
or
services
25
10.2
Consequences
of
non-compliance
25
ARTICLE 11 — USE OF IN-KIND CONTRIBUTIONS PROVIDED BY THIRD
PARTIES
AGAINST
PAYMENT
26
11.1
Rules for the use of in-kind contributions
against
payment
26
11.2
Consequences
of
non-compliance
26
ARTICLE 12 — USE OF IN-KIND CONTRIBUTIONS PROVIDED BY THIRD
PARTIES
FREE OF
CHARGE
26
12.1
Rules for the use of in-kind contributions free
of
charge
26
12.2
Consequences
of
non-compliance
27
ARTICLE 13 — IMPLEMENTATION OF ACTION
TASKS
BY
SUBCONTRACTORS
27
13.1
Rules for subcontracting
action
tasks
27
13.2
Consequences
of
non-compliance
27
ARTICLE 14 — IMPLEMENTATION OF ACTION
TASKS
BY LINKED
THIRD
PARTIES
28
14.1
Rules for calling upon linked third parties to implement part of
the
action
28
14.2
Consequences
of
non-compliance
28
ARTICLE 15 — FINANCIAL SUPPORT TO
THIRD
PARTIES
28
15.1
Rules for providing financial support to
third
parties
28
15.2
Financial support in the form
of
prizes
29
15.3
Consequences
of
non-compliance
29
ARTICLE 16 — PROVISION OF TRANS-NATIONAL OR VIRTUAL ACCESS TO RESEARCH
INFRASTRUCTURE
29
16.1
Rules for providing trans-national access to
research
infrastructure
29
16.2
Rules for providing virtual access to
research
infrastructure
29
16.3
Consequences
of
non-compliance
29
SECTION 2 RIGHTS AND OBLIGATIONS
RELATED
TO THE
GRANT
ADMINISTRATION
29
ARTICLE 17 – GENERAL
OBLIGATION
TO
INFORM
29
17.1
General obligation to provide information
upon
request
29
17.2
Obligation to keep information up to date and to inform about events and circumstances likely to
affect
the
Agreement
29
17.3
Consequences
of
non-compliance
30
ARTICLE 18 — KEEPING RECORDS —
SUPPORTING
DOCUMENTATION
30
18.1
Obligation to keep records and other
supporting
documentation
30
18.2
Consequences
of
non-compliance
31
ARTICLE 19 — SUBMISSION
OF
DELIVERABLES
31
19.1
Obligation to
submit
deliverables
31
19.2
Consequences
of
non-compliance
31
ARTICLE 20 — REPORTING —
PAYMENT
REQUESTS
32
20.1
Obligation to
submit
reports
32
20.2
Reporting
periods
32
20.3
Periodic reports — Requests for
interim
payments
32
20.4
Final report — Request for payment of
the
balance
33
20.5
Information on cumulative
expenditure
incurred
34
20.6
Currency for financial statements and conversion
into
euro
34
20.7
Language
of
reports
34
20.8
Consequences
of
non-compliance
34
ARTICLE 21 —
PAYMENTS
AND
PAYMENT
ARRANGEMENTS
34
21.1
Payments to
be
made
34
21.2
Pre-financing payment — Amount — Amount retained for the
Guarantee
Fund
34
21.3
Interim payments — Amount
—
Calculation
35
21.4
Payment of the balance — Amount — Calculation — Release of the amount retained for the
Guarantee
Fund
35
21.5
Notification of
amounts
due
36
21.6
Currency
for
payments
36
21.7
Payments to the coordinator — Distribution to
the
beneficiaries
36
21.8
Bank account
for
payments
37
21.9
Costs of
payment
transfers
37
21.10
Date
of
payment
37
21.11
Consequences
of
non-compliance
37
ARTICLE 22 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF
FINDINGS
38
22.1
Checks, reviews and audits by
the
Commission
38
22.2
Investigations by the European Anti-Fraud
Office
(OLAF)
40
22.3
Checks and audits by the European Court of
Auditors
(ECA)
40
22.4
Checks, reviews, audits and investigations for
international
organisations
40
22.5
Consequences of findings in checks, reviews, audits and investigations — Extension of
findings
..............................................................................................................................................................40
22.6
Consequences
of
non-compliance
42
ARTICLE 23 —
EVALUATION
OF THE
IMPACT
OF
THE
ACTION
42
23.1
Right to evaluate the impact of
the
action
42
23.2
Consequences
of
non-compliance
42
SECTION 3 RIGHTS AND OBLIGATIONS
RELATED
TO BACKGROUND
AND
RESULTS
42
SUBSECTION
1
GENERAL
42
ARTICLE 23a — MANAGEMENT OF
INTELLECTUAL
PROPERTY
43
23a.1 Obligation to take measures to implement the Commission Recommendation on the management of
intellectual property in knowledge
transfer
activities
43
23a.2 Consequences
of
non-compliance
43
SUBSECTION 2 RIGHTS AND OBLIGATIONS
RELATED
TO
BACKGROUND
43
ARTICLE 24 — AGREEMENT
ON
BACKGROUND
43
24.1
Agreement
on
background
43
24.2
Consequences
of
non-compliance
43
ARTICLE 25 — ACCESS RIGHTS
TO
BACKGROUND
43
25.1
Exercise of access rights —
Waiving
of access rights —
No
sub-licensing
43
25.2
Access rights for other beneficiaries, for implementing their own tasks under
the action
44
25.3
Access rights for other beneficiaries, for exploiting their
own
results
44
25.4
Access rights for
affiliated
entities
44
25.5
Access rights for
third
parties
45
25.6
Consequences
of
non-compliance
45
SUBSECTION 3 RIGHTS AND OBLIGATIONS
RELATED
TO
RESULTS
45
ARTICLE 26 — OWNERSHIP
OF
RESULTS
45
26.1
Ownership by the beneficiary that generates
the
results
45
26.2
Joint ownership by
several
beneficiaries
45
26.3
Rights of third parties
(including
personnel)
46
26.4
EU ownership, to
protect
results
46
26.5
Consequences
of
non-compliance
47
ARTICLE 27 — PROTECTION OF
RESULTS
— VISIBILITY OF
EU
FUNDING
47
27.1
Obligation to protect
the
results
47
27.2
EU ownership, to protect
the
results
47
27.3
Information on
EU
funding
47
27.4
Consequences
of
non-compliance
47
ARTICLE 28 — EXPLOITATION
OF
RESULTS
47
28.1
Obligation to exploit
the
results
47
28.2
Results that could contribute to European or international standards — Information on EU
funding
..............................................................................................................................................................48
28.3
Consequences
of
non-compliance
48
ARTICLE 29 — DISSEMINATION OF RESULTS — OPEN ACCESS — VISIBILITY OF EU FUNDING
........................................................................................................................................................ 48
29.1
Obligation to
disseminate
results
48
29.2
Open access to
scientific
publications
49
29.3
Open access to
research
data
49
29.4
Information on EU funding — Obligation and right to use the
EU
emblem
50
29.5
Disclaimer excluding
Commission
responsibility
50
29.6
Consequences
of
non-compliance
50
ARTICLE 30 — TRANSFER AND LICENSING
OF
RESULTS
50
30.1
Transfer
of
ownership
50
30.2
Granting
licenses
51
30.3
Commission right to object to transfers
or
licensing
51
30.4
Consequences
of
non-compliance
52
ARTICLE 31 — ACCESS RIGHTS
TO
RESULTS
52
31.1
Exercise of access rights —
Waiving
of access rights —
No
sub-licensing
52
31.2
Access rights for other beneficiaries, for implementing their own tasks under
the action
52
31.3
Access rights for other beneficiaries, for exploiting their
own
results
52
31.4
Access rights of
affiliated
entities
52
31.5
Access rights for the EU institutions, bodies, offices or agencies and EU
Member States
52
31.6
Access rights for
third
parties
53
31.7
Consequences
of
non-compliance
53
SECTION 4 OTHER RIGHTS
AND
OBLIGATIONS
53
ARTICLE 32 — RECRUITMENT AND WORKING CONDITIONS
FOR RESEARCHERS
53
32.1
Obligation to take measures to implement the European Charter for Researchers and Code of
Conduct for the Recruitment
of
Researchers
53
32.2
Consequences
of
non-compliance
53
ARTICLE 33 —
GENDER
EQUALITY
53
33.1
Obligation to aim for
gender
equality
53
33.2
Consequences
of
non-compliance
53
ARTICLE 34 — ETHICS AND
RESEARCH
INTEGRITY
54
34.1
Obligation to comply with ethical and research
integrity
principles
54
34.2
Activities raising
ethical
issues
55
34.3
Activities involving human embryos or human embryonic
stem
cells
55
34.4
Consequences
of
non-compliance
56
ARTICLE 35 — CONFLICT
OF
INTERESTS
56
35.1
Obligation to avoid a conflict
of
interests
56
35.2
Consequences
of
non-compliance
56
ARTICLE 36
—
CONFIDENTIALITY
56
36.1
General obligation to
maintain
confidentiality
56
36.2
Consequences
of
non-compliance
57
ARTICLE 37 —
SECURITY-RELATED
OBLIGATIONS
57
37.1
Results with a
security
recommendation
57
37.2
Classified
results
57
37.3
Activities involving dual-use goods or dangerous materials
and
substances
57
37.4
Consequences
of
non-compliance
57
ARTICLE 38 — PROMOTING THE ACTION — VISIBILITY OF
EU
FUNDING
58
38.1
Communication activities
by
beneficiaries
58
38.2
Communication activities by
the
Commission
58
38.3
Consequences
of
non-compliance
59
ARTICLE 39 — PROCESSING OF
PERSONAL
DATA
60
39.1
Processing of personal data by
the
Commission
60
39.2
Processing of personal data by
the
beneficiaries
60
39.3
Consequences
of
non-compliance
60
ARTICLE 40 — ASSIGNMENTS OF CLAIMS FOR
PAYMENT
AGAINST
THE
COMMISSION
60
CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES — RELATIONSHIP
WITH COMPLEMENTARY BENEFICIARIES — RELATIONSHIP WITH
PARTNERS
OF A
JOINT
ACTION
61
ARTICLE 41 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES —
RELATIONSHIP WITH
COMPLEMENTARY
BENEFICIARIES — RELATIONSHIP WITH
PARTNERS
OF A
JOINT
ACTION
61
41.1
Roles and responsibilities towards
the
Commission
61
41.2
Internal division of roles
and
responsibilities
61
41.3
Internal arrangements between beneficiaries —
Consortium
agreement
62
41.4
Relationship with complementary beneficiaries —
Collaboration
agreement
62
41.5
Relationship with partners of a joint action —
Coordination
agreement
62
CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — SANCTIONS
— DAMAGES — SUSPENSION — TERMINATION —
FORCE
MAJEURE
63
SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY —
SANCTIONS
63
ARTICLE 42 — REJECTION OF
INELIGIBLE
COSTS
63
42.1
Conditions
63
42.2
Ineligible costs to be rejected — Calculation
—
Procedure
63
42.3
Effects
63
ARTICLE 43 — REDUCTION OF
THE
GRANT
64
43.1
Conditions
64
43.2
Amount to be reduced — Calculation
—
Procedure
64
43.3
Effects
64
ARTICLE 44 — RECOVERY OF
UNDUE
AMOUNTS
65
10
44.1 Amount to be recovered — Calculation
—
Procedure
65
ARTICLE 45 —
ADMINISTRATIVE
SANCTIONS
69
SECTION 2 LIABILITY
FOR
DAMAGES
69
ARTICLE 46 — LIABILITY
FOR
DAMAGES
69
46.1
Liability of
the
Commission
69
46.2
Liability of
the
beneficiaries
69
SECTION 3 SUSPENSION
AND
TERMINATION
69
ARTICLE 47 — SUSPENSION OF
PAYMENT
DEADLINE
69
47.1
Conditions
69
47.2
Procedure
69
ARTICLE 48 — SUSPENSION
OF
PAYMENTS
70
48.1
Conditions
70
48.2
Procedure
70
ARTICLE 49 — SUSPENSION OF THE
ACTION
IMPLEMENTATION
71
49.1
Suspension of the action implementation, by
the
beneficiaries
71
49.2
Suspension of the action implementation, by
the
Commission
71
ARTICLE 50 — TERMINATION OF THE AGREEMENT OR OF THE
PARTICIPATION
OF ONE OR
MORE
BENEFICIARIES
72
50.1
Termination of the Agreement, by
the
beneficiaries
72
50.2
Termination of the participation of one or more beneficiaries, by
the
beneficiaries
73
50.3
Termination of the Agreement or the participation of one or more beneficiaries, by the
Commission
76
SECTION
4
FORCE
MAJEURE
80
ARTICLE 51 —
FORCE
MAJEURE
80
CHAPTER
7
FINAL
PROVISIONS
80
ARTICLE 52 — COMMUNICATIONS BETWEEN
THE
PARTIES
80
52.1
Form and means
of
communication
80
52.2
Date
of
communication
81
52.3
Addresses
for
communication
81
ARTICLE 53 — INTERPRETATION OF
THE
AGREEMENT
82
53.1
Precedence of the
Terms
and Conditions over
the
Annexes
82
53.2
Privileges
and
immunities
82
ARTICLE 54 — CALCULATION OF PERIODS,
DATES
AND
DEADLINES
82
ARTICLE 55 — AMENDMENTS TO
THE
AGREEMENT
82
55.1
Conditions
82
55.2
Procedure
82
19
ARTICLE 56 — ACCESSION TO
THE
AGREEMENT
83
56.1
Accession of the beneficiaries mentioned in the
Preamble
83
56.2
Addition of
new
beneficiaries
83
ARTICLE 57 — APPLICABLE
LAW
AND SETTLEMENT
OF
DISPUTES
83
57.1
Applicable
law
83
57.2
Dispute
settlement
83
ARTICLE 58 —
ENTRY
INTO FORCE OF
THE
AGREEMENT
84
CHAPTER 1
GENERAL
ARTICLE 1 — SUBJECT OF THE AGREEMENT
This
Agreement
sets
out
the
rights
and
obligations
and
the
terms
and
conditions
applicable
to
the
grant awarded to the beneficiaries for implementing the action set out in Chapter
2.
CHAPTER 2
ACTION
ARTICLE 2 — ACTION TO BE IMPLEMENTED
The grant is awarded for the action entitled ‘
Data-Driven Bioeconomy
—
DataBio
’
(‘action’)
, as described in Annex 1.
ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION
The duration of the action will be
36 months
as of 1 January 2017 (‘
starting date of the action
’).
ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS
4.1
Estimated
budget
The ‘
estimated budget
’ for the action is set out in Annex 2.
It
contains
the
estimated
eligible
costs
and
the
forms
of
costs,
broken
down
by
beneficiary
(and
linked third party) and budget category (see Articles 5, 6, and 14). It also shows the estimated costs of the beneficiaries not receiving EU funding (see Article
9).
4.2
Budget
transfers
The estimated budget breakdown indicated in Annex 2 may be adjusted — without an amendment (see Article 55) — by transfers of amounts between beneficiaries, budget categories and/or forms of costs set out in Annex 2, if the action is implemented as described in Annex 1.
However, the beneficiaries may not add costs relating to subcontracts not provided for in Annex 1, unless such additional subcontracts are approved by an amendment or in accordance with Article 13.
CHAPTER 3
GRANT
ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATES AND FORMS OF COSTS
5.1
Maximum grant
amount
The ‘
maximum grant amount
’ is
EUR 12,580,486.16
(twelve million five hundred and eighty thousand four hundred and eighty six EURO and sixteen eurocents).
5.2
Form of grant, reimbursement rates and forms of
costs
The grant reimburses
100% of the eligible costs of the beneficiaries that are non-profit legal entities and 70% of the eligible costs of the beneficiaries and the linked third parties that are profit legal entities
(see Article 6) (‘
reimbursement of eligible costs grant
’) (see Annex 2).
The estimated eligible costs of the action are EUR
15,431,895.03
(fifteen million four hundred and thirty one thousand eight hundred and ninety five EURO and three eurocents).
Eligible costs (see Article 6) must be declared under the following forms ('
forms of costs
'):
(a)
for
direct personnel
costs
:
·
as actually incurred costs (‘
actual costs
’)
or
·
on the basis of an amount per unit calculated by the beneficiary in accordance with its usual cost accounting practices (‘
unit
costs
’).
Personnel
costs for SME owners
or
beneficiaries that are natural persons
not receiving a salary (see Article 6.2, Points A.4 and A.5) must be declared on the basis of the amount per unit set out in Annex 2a (
unit costs
);
(b)
for
direct costs for subcontracting
: as actually incurred costs (
actual
costs
);
(c)
for
direct costs of providing financial support to third parties
: not
applicable;
(d)
for
other direct costs
: as actually incurred costs (
actual
costs
);
(e)
for
indirect
costs
:
on
the
basis
of
a
flat-rate
applied
as
set
out
in
Article
6.2,
Point
E
(‘
flat-rate costs
’);
(f)
specific cost category(ies):
not
applicable.
5.3
Final grant amount —
Calculation
The ‘
final grant amount
’ depends on the actual extent to which the action is implemented in accordance with the Agreement’s terms and conditions.
This amount is calculated by the Commission — when the payment of the balance is made (see Article 21.4) — in the following steps:
Step 1 – Application of the reimbursement rates to the eligible costs Step 2 – Limit to the maximum grant amount
Step 3 – Reduction due to the no-profit rule
Step 4 – Reduction due to substantial errors, irregularities or fraud or serious breach of obligations
5.3.1
Step 1 — Application of the reimbursement rates to the eligible
costs
The reimbursement rate(s) (see Article 5.2) are applied to the eligible costs (actual costs, unit costs and
flat-rate
costs;
see
Article
6)
declared
by
the
beneficiaries
and
linked
third
parties
(see
Article
20) and approved by the Commission (see Article
21).
5.3.2
Step 2 — Limit to the maximum grant
amount
If the amount obtained following Step 1 is higher than the maximum grant amount set out in Article 5.1, it will be limited to the
latter.
5.3.3
Step 3 — Reduction due to the no-profit
rule
The grant must not produce a profit.
‘
Profit
’ means the surplus of the amount obtained following Steps 1 and 2 plus the action’s total receipts, over the action’s total eligible costs.
The ‘
action’s total eligible costs
’ are the consolidated total eligible costs approved by the Commission.
The ‘
action’s total receipts
’ are the consolidated total receipts generated during its duration (see Article 3).
The following are considered
receipts
:
(a)
income generated by the action; if the income is generated from selling equipment or other assets
purchased
under
the
Agreement,
the
receipt
is
up
to
the
amount
declared
as
eligible
under the
Agreement;
(b)
financial contributions given by third parties to the beneficiary or to a linked third party specifically to be used for the action,
and
(c)
in-kind
contributions
provided
by
third
parties
free
of
charge
and
specifically
to
be
used
for
the action, if they have been declared as eligible
costs.
The following are however not considered receipts:
(a)
income generated by exploiting the action’s results (see Article
28);
(b)
financial
contributions
by
third
parties,
if
they
may
be
used
to
cover
costs
other
than
the
eligible costs (see Article
6);
(c)
financial contributions by third parties with no obligation to repay any amount unused at the end of the period set out in Article
3.
If there is a profit, it will be deducted from the amount obtained following Steps 1 and 2.
5.3.4
Step 4 — Reduction due to substantial errors, irregularities or fraud or serious breach
of obligations — Reduced grant amount —
Calculation
If the grant is reduced (see Article 43), the Commission will calculate the reduced grant amount by deducting the amount of the reduction (calculated in proportion to the seriousness of the errors, irregularities or fraud or breach of obligations, in accordance with Article 43.2) from the maximum grant amount set out in Article
5.1.
The final grant amount will be the lower of the following two:
·
the amount obtained following Steps 1 to 3
or
·
the reduced grant amount following Step
4.
5.4
Revised final grant amount —
Calculation
If — after the payment of the balance (in particular, after checks, reviews, audits or investigations; see
Article
22)
—
the
Commission
rejects
costs
(see
Article
42)
or
reduces
the
grant
(see
Article
43), it will calculate the ‘
revised final grant amount
’ for the beneficiary concerned by the
findings.
This amount is calculated by the Commission on the basis of the findings, as follows:
·
in case of
rejection of costs
: by applying the reimbursement rate to the revised eligible costs approved by the Commission for the beneficiary
concerned;
·
in
case
of
reduction
of
the
grant
:
by
calculating
the
concerned
beneficiary’s
share
in
the
grant amount reduced in proportion to the seriousness of the errors, irregularities or fraud or breach of obligations (see Article
43.2).
In case of
rejection of costs and reduction of the grant
, the revised final grant amount for the beneficiary concerned will be the lower of the two amounts above.
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS
6.1
General conditions for costs to be
eligible
‘
Eligible costs
’ are costs that meet the following criteria:
(a)
for
actual
costs
:
(i)
they must be actually incurred by the
beneficiary;
(ii)
they must be incurred in the period set out in Article 3, with the exception of costs relating to the submission of the periodic report for the last reporting period and the final report
(see Article
20);
(iii)
they must be indicated in the estimated budget set out in Annex
2;
(iv)
they must be incurred in connection with the action as described in Annex 1 and necessary for its
implementation;
(v)
they must be identifiable and verifiable, in particular recorded in the beneficiary’s accounts in
accordance
with
the
accounting
standards
applicable
in
the
country
where
the
beneficiary is established and with the beneficiary’s usual cost accounting
practices;
(vi)
they must comply with the applicable national law on taxes, labour and social security,
and
(vii)
they must be reasonable, justified and must comply with the principle of sound financial management, in particular regarding economy and
efficiency;
(b)
for
unit
costs
:
(i)
they must be calculated as
follows:
{amounts per unit set out in Annex 2a or calculated by the beneficiary in accordance with its usual cost accounting practices (see Article 6.2, Point A)
multiplied by
the number of actual units};
(ii)
the number of actual units must comply with the following
conditions:
·
the units must be actually used or produced in the period set out in Article
3;
·
the units must be necessary for implementing the action or produced by it,
and
·
the
number
of
units
must
be
identifiable
and
verifiable,
in
particular
supported
by
records and documentation (see Article
18);
(c)
for
flat-rate
costs
:
(i)
they must be calculated by applying the flat-rate set out in Annex 2,
and
(ii)
the costs (actual costs or unit costs) to which the flat-rate is applied must comply with the conditions for eligibility set out in this
Article.
6.2
Specific conditions for costs to be
eligible
Costs are eligible if they comply with the general conditions (see above) and the specific conditions set out below for each of the following budget categories:
A.
direct personnel
costs;
B.
direct costs of
subcontracting;
C.
not
applicable;
D.
other direct
costs;
E.
indirect
costs;
F.
not
applicable.
‘Direct costs’ are costs that are directly linked to the action implementation and can therefore be attributed to it directly. They must not include any indirect costs (see Point E below).
‘Indirect
costs’
are
costs
that
are
not
directly
linked
to
the
action
implementation
and
therefore
cannot be attributed directly to
it.
A.
Direct personnel costs
Types
of eligible personnel
costs
A.1
Personnel costs are eligible, if they are related to personnel working for the beneficiary under an employment contract (or equivalent appointing act) and assigned to the action (‘
costs for employees
(or
equivalent)
’).
They
must
be
limited
to
salaries
(including
during
parental
leave), social security contributions, taxes and other costs included in the
remuneration
, if they arise from national law or the employment contract (or equivalent appointing
act).
1
For
the
definition,
see
Article
2.1(14)
of
the
Rules
for
Participation
Regulation
No
1290/2013:
‘
non-profit
legal
entity
’ means a legal entity which by its legal form is non-profit-making or which has a legal or statutory obligation not to distribute profits to its shareholders or individual
members.
Beneficiaries that are non-profit legal entities
1
may also declare as personnel costs
additional remuneration
for personnel assigned to the action (including payments on the basis of supplementary contracts regardless of their nature), if:
(a)
it
is
part
of
the
beneficiary’s
usual
remuneration
practices
and
is
paid
in
a
consistent
manner whenever the same kind of work or expertise is
required;
(b)
the criteria used to calculate the supplementary payments are objective and generally applied by the beneficiary, regardless of the source of funding
used.
Additional remuneration for personnel assigned to the action is eligible up to the following amount:
(a)
if the person works full time and exclusively on the action during the full year: up to EUR 8
000;
(b)
if the person works exclusively on the action but not full-time or not for the full year: up to the corresponding pro-rata amount of EUR 8 000,
or
(c)
if the person does not work exclusively on the action: up to a pro-rata amount calculated as
follows:
{
{EUR 8 000
divided by
the number of annual productive hours (see below)}, multiplied by
the number of hours that the person has worked on the action during the year
}
.
A.2
The
costs
for
natural
persons
working
under
a
direct
contract
with
the
beneficiary
other
than an employment contract are eligible personnel costs,
if:
(a)
the person works under the beneficiary’s instructions and, unless otherwise agreed with the beneficiary, on the beneficiary’s
premises;
(b)
the result of the work carried out belongs to the beneficiary,
and
(c)
the costs are not significantly different from those for personnel performing similar tasks under an employment contract with the
beneficiary.
A.3
The
costs
of
personnel
seconded
by
a
third
party
against
payment
are
eligible
personnel
costs, if the conditions in Article 11.1 are
met.
A.4
Costs of owners
of beneficiaries that are small and medium-sized enterprises (‘
SME owners
’) who are working on the action and who do not receive a salary are eligible personnel costs, if they correspond to the amount per unit set out in Annex 2a multiplied by the number of actual hours worked on the
action.
A.5
Costs of ‘beneficiaries that are natural persons’
not receiving a salary are eligible personnel costs, if they correspond to the amount per unit set out in Annex 2a multiplied by the number of actual hours worked on the
action.
Calculation
Personnel costs must be calculated by the beneficiaries as follows:
{
{hourly rate multiplied by
the number of actual hours worked on the action}, plus
for non-profit legal entities: additional remuneration to personnel assigned to the action under the conditions set out above (Point A.1)
}
.
The number of actual hours declared for a person must be identifiable and verifiable (see Article 18).
The
total
number
of
hours
declared
in
EU
or
Euratom
grants,
for
a
person
for
a
year,
cannot
be
higher than
the
annual
productive
hours
used
for
the
calculations
of
the
hourly
rate.
Therefore,
the
maximum number of hours that can be declared for the grant
is:
{the number of annual productive hours for the year (see below) minus
total number of hours declared by the beneficiary for that person in that year for other EU or Euratom grants}.
The ‘
hourly rate
’ is one of the following:
(a)
for
personnel
costs
declared
as
actual
costs:
the
hourly
rate
is
calculated
per
full
financial
year
, as
follows:
{actual annual personnel costs (excluding additional remuneration) for the person divided by
number of annual productive hours}.
using the personnel costs and the number of productive hours for each full financial year covered by the reporting period concerned. If a financial year is not closed at the end of the reporting period, the beneficiaries must use the hourly rate of the last closed financial year available.
For the ‘number of annual productive hours’, the beneficiaries may choose one of the following:
(i)
‘fixed
number
of
hours’:
1
720
hours
for
persons
working
full
time
(or
corresponding
pro- rata for persons not working full
time);
(ii)
‘individual annual productive hours’: the total number of hours worked by the person in the year for the beneficiary, calculated as
follows:
{annual workable hours of the person (according to the employment contract, applicable collective labour agreement or national law)
plus
overtime worked minus
absences (such as sick leave and special leave)}.
‘Annual workable hours’ means the period during which the personnel must be
working, at
the
employer’s
disposal
and
carrying
out
his/her
activity
or
duties
under
the
employment contract, applicable collective labour agreement or national working time
legislation.
If the contract (or applicable collective labour agreement or national working time legislation) does not allow to determine the annual workable hours, this option cannot be
used;
(iii)
‘standard annual productive hours’: the ‘standard number of annual hours’ generally applied by the beneficiary for its personnel in accordance with its usual cost accounting practices. This number must be at least 90% of the ‘standard annual workable
hours’.
If there is no applicable reference for the standard annual workable hours, this option cannot be used.
For all options, the actual time spent on
parental leave
by a person assigned to the action may be deducted from the number of annual productive hours.
As an alternative, beneficiaries may calculate the hourly rate
per month
, as follows:
{
actual monthly personnel cost (excluding additional remuneration) for the person divided by
{number of annual productive hours / 12}
}
using the personnel costs for each month and (one twelfth of) the annual productive hours calculated according to either option (i) or (iii) above, i.e.:
·
fixed number of hours
or
·
standard annual productive
hours.
Time spent on
parental leave
may not be deducted when calculating the hourly rate per month. However, beneficiaries may declare personnel costs incurred in periods of parental leave in proportion to the time the person worked on the action in that financial year.
If parts of a basic remuneration are generated over a period longer than a month, the beneficiaries may include only the share which is generated in the month (irrespective of the amount actually paid for that month).
Each beneficiary must use only one option (per full financial year or per month) for each full financial year;
(b)
for personnel costs declared on the basis of
unit costs
: the hourly rate is one of the
following:
(i)
for SME owners or beneficiaries that are natural persons: the hourly rate set out in Annex 2a (see Points A.4 and A.5 above),
or
(ii)
for personnel costs declared on the basis of the beneficiary’s usual cost accounting practices: the hourly rate calculated by the beneficiary in accordance with its usual
cost
accounting
practices,
if:
20
Grant Agreement number: 732064 — DataBio — H2020-ICT-2016-2017/H2020-ICT-2016-1
Associated with document Ref. Ares(2016)6013200 - 19/10/2016
·
the cost accounting practices used are applied in a consistent manner, based on objective criteria, regardless of the source of
funding;
·
the hourly rate is calculated using the actual personnel costs recorded in the beneficiary’s
accounts,
excluding
any
ineligible
cost
or
costs
included
in
other
budget categories.
The
actual
personnel
costs
may
be
adjusted
by
the
beneficiary
on
the
basis
of
budgeted or estimated elements. Those elements must be relevant for calculating the
personnel costs, reasonable and correspond to objective and verifiable
information;
and
·
the
hourly
rate
is
calculated
using
the
number
of
annual
productive
hours
(see
above).
B.
Direct costs of subcontracting
(including related duties, taxes and charges such as non- deductible value added tax
(VAT)
paid by the beneficiary) are eligible if the conditions in Article 13.1.1 are
met.
C.
Direct costs of providing financial support to third
parties
Not applicable
D.
Other direct
costs
D.1
Travel
costs and related subsistence allowances
(including related duties, taxes and charges such as non-deductible value added tax
(VAT)
paid by the beneficiary) are eligible if they are
in line with the beneficiary’s usual practices on
travel.
D.2
The
depreciation costs of equipment, infrastructure or other assets
(new or second-hand)
as recorded in the beneficiary’s accounts are eligible, if they were purchased in accordance with Article 10.1.1 and written off in accordance with international accounting standards and the beneficiary’s usual accounting
practices.
The
costs
of
renting
or
leasing
equipment,
infrastructure
or
other
assets
(including
related
duties, taxes
and
charges
such
as
non-deductible
value
added
tax
(VAT)
paid
by
the
beneficiary)
are
also eligible,
if
they
do
not
exceed
the
depreciation
costs
of
similar
equipment,
infrastructure
or
assets and do not include any financing
fees.
The
costs
of
equipment,
infrastructure
or
other
assets
contributed
in-kind
against
payment
are eligible,
if
they
do
not
exceed
the
depreciation
costs
of
similar
equipment,
infrastructure
or
assets, do not include any financing fees and if the conditions in Article 11.1 are
met.
The only portion of the costs that will be taken into account is that which corresponds to the duration of the action and rate of actual use for the purposes of the action.
D.3
Costs of other goods and services
(including related duties, taxes and charges such as non- deductible value added tax
(VAT)
paid by the beneficiary) are eligible, if they
are:
(a)
purchased specifically for the action and in accordance with Article 10.1.1
or
(b)
contributed in kind against payment and in accordance with Article
11.1.
29
Such goods and services include, for instance, consumables and supplies, dissemination (including
open
access),
protection
of
results,
certificates
on
the
financial
statements
(if
they
are required by the Agreement), certificates on the methodology, translations and
publications.
D.4
Capitalised
and
operating
costs
of
‘large
research
infrastructure’
2
directly
used
for
the
action are eligible,
if:
(a)
the
value
of
the
large
research
infrastructure
represents
at
least
75%
of
the
total
fixed
assets (at historical value in its last closed balance sheet before the date of the signature of the Agreement or as determined on the basis of the rental and leasing costs of the research infrastructure
3
);
(b)
the
beneficiary’s
methodology
for
declaring
the
costs
for
large
research
infrastructure
has been positively assessed by the Commission (‘
ex-ante
assessment
’);
(c)
the beneficiary declares as direct eligible costs only the portion which corresponds to the duration of the action and the rate of actual use for the purposes of the action,
and
(d)
they comply with the conditions as further detailed in the annotations to the H2020 grant agreements.
E.
Indirect
costs
Indirect
costs
are
eligible
if
they
are
declared
on
the
basis
of
the
flat-rate
of
25%
of
the
eligible
direct costs (see Article 5.2 and Points A to D above), from which are
excluded:
(a)
costs of subcontracting
and
(b)
costs
of
in-kind
contributions
provided
by
third
parties
which
are
not
used
on
the
beneficiary’s premises;
(c)
not
applicable;
(d)
not
applicable.
Beneficiaries receiving an operating grant
4
financed by the EU or Euratom budget cannot declare indirect costs for the period covered by the operating grant.
2
‘
Large research infrastructure
’ means research infrastructure of a total value of at least EUR 20 million, for a beneficiary,
calculated
as
the
sum
of
historical
asset
values
of
each
individual
research
infrastructure
of
that
beneficiary, as
they
appear
in
its
last
closed
balance
sheet
before
the
date
of
the
signature
of
the
Agreement
or
as
determined
on
the basis of the rental and leasing costs of the research
infrastructure.
3
For the definition, see Article 2(6) of the H2020 Framework Programme Regulation No 1291/2013: ‘
Research infrastructure
’
are
facilities,
resources
and
services
that
are
used
by
the
research
communities
to
conduct
research
and foster
innovation
in
their
fields.
Where
relevant,
they
may
be
used
beyond
research,
e.g.
for
education
or
public
services. They include: major scientific equipment (or sets of instruments); knowledge-based resources such as collections, archives
or
scientific
data;
e-infrastructures
such
as
data
and
computing
systems
and
communication
networks;
and
any other infrastructure of a unique nature essential to achieve excellence in research and innovation. Such infrastructures may be ‘single-sited’, ‘virtual’ or
‘distributed’.
4
For the definition, see Article 121(1)(b) of Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing Council
Regulation
(EC,
Euratom)
No
1605/2002
(‘
Financial
Regulation
No
966/2012
’)(OJ
L
218,
26.10.2012,
p.1): ‘
operating
grant
’
means
direct
financial
contribution,
by
way
of
donation,
from
the
budget
in
order
to
finance
the
F.
Specific cost
category(ies)
Not applicable
6.3
Conditions for costs of linked third parties to be
eligible
Costs incurred by linked third parties
are eligible if they fulfil — mutatis mutandis — the general and specific conditions for eligibility set out in this Article (Article 6.1 and 6.2) and Article 14.1.1.
6.4
Conditions for in-kind contributions provided by third parties free of charge to be
eligible
In-kind
contributions
provided
free
of
charge
are
eligible
direct
costs
(for
the
beneficiary
or
linked third party), if the costs incurred by the third party fulfil —
mutatis mutandis
— the general and specific conditions for eligibility set out in this Article (Article 6.1 and 6.2) and Article
12.1.
6.5
Ineligible
costs
‘
Ineligible costs
’ are:
(a)
costs that do not comply with the conditions set out above (Article 6.1 to 6.4), in
particular:
(i)
costs related to return on
capital;
(ii)
debt and debt service
charges;
(iii)
provisions for future losses or
debts;
(iv)
interest
owed;
(v)
doubtful
debts;
(vi)
currency exchange
losses;
(vii)
bank costs charged by the beneficiary’s bank for transfers from the
Commission;
(viii)
excessive or reckless
expenditure;
(ix)
deductible
VAT;
(x)
costs incurred during suspension of the implementation of the action (see Article
49);
(b)
costs declared under another EU or Euratom grant (including grants awarded by a Member State and financed by the EU or Euratom budget and grants awarded by bodies other than the Commission
for
the
purpose
of
implementing
the
EU
or
Euratom
budget);
in
particular,
indirect costs if the beneficiary is already receiving an operating grant financed by the EU or Euratom budget in the same
period.
6.6
Consequences of declaration of ineligible
costs
Declared costs that are ineligible will be rejected (see Article 42).
This may also lead to any of the other measures described in Chapter 6.
functioning of a body which pursues an aim of general EU interest or has an objective forming part of and supporting an EU policy.
CHAPTER 4 RIGHTS AND OBLIGATIONS OF THE PARTIES
SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE ACTION
ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION
7.1
General obligation to properly implement the
action
The beneficiaries must implement the action as described in Annex 1 and in compliance with the provisions
of
the
Agreement
and
all
legal
obligations
under
applicable
EU,
international
and
national
law.
7.2
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTIES INVOLVED IN THE ACTION
The beneficiaries must have the appropriate resources to implement the action. If it is necessary to implement the action, the beneficiaries may:
·
purchase goods, works and services (see Article
10);
·
use in-kind contributions provided by third parties against payment (see Article
11);
·
use in-kind contributions provided by third parties free of charge (see Article
12);
·
call upon subcontractors to implement action tasks described in Annex 1 (see Article
13);
·
call upon linked third parties to implement action tasks described in Annex 1 (see Article
14).
In these cases, the beneficiaries retain sole responsibility towards the Commission and the other beneficiaries for implementing the action.
ARTICLE 9 — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT RECEIVING EU FUNDING
9.1
Rules for the implementation of action tasks by beneficiaries not receiving EU
funding
Beneficiaries
not
receiving
EU
funding
must
implement
the
action
tasks
attributed
to
them
in
Annex
1 according to Article
7.1.
Their costs are estimated in Annex 2 but:
·
will not be reimbursed
and
·
will not be taken into account for the calculation of the grant (see Articles 5.2, 5.3 and 5.4, and
21).
Chapter 3, Articles 10 to 15, 18.1.2, 20.3(b), 20.4(b), 20.6, 21, 23a, 26.4, 27.2, 28.1, 28.2, 30.3, 31.5,
40, 42, 43, 44, 47 and 48 do not apply to these beneficiaries.
They will not be subject to financial checks, reviews and audits under Article 22.
Beneficiaries not receiving EU funding may provide in-kind contributions to another beneficiary. In this case, they will be considered as a third party for the purpose of Articles 11 and 12.
9.2
Consequences of
non-compliance
If a beneficiary not receiving EU funding breaches any of its obligations under this Article, its participation in the Agreement may be terminated (see Article 50).
Such breaches may also lead to any of the other measures described in Chapter 6 that are applicable to it.
ARTICLE 10 — PURCHASE OF GOODS, WORKS OR SERVICES
10.1
Rules for purchasing goods, works or
services
10.1.1
If
necessary
to
implement
the
action,
the
beneficiaries
may
purchase
goods,
works
or
services.
The beneficiaries must make such purchases ensuring the best value for money
or,
if appropriate,
the lowest price. In doing so, they must avoid any conflict of interests (see Article
35).
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards their contractors.
10.1.2
Beneficiaries that are ‘contracting authorities’ within the meaning of Directives 2004/18/EC
5
(or 2014/24/EC
6
) or ‘contracting entities’ within the meaning of Directive 2004/17/EC
7
(or 2014/25/EC
8
) must comply with the applicable national law on public
procurement.
10.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under Article 10.1.1, the costs related to the contract concerned will be ineligible (see Article 6) and will be rejected (see Article 42).
If a beneficiary breaches any of its obligations under Article 10.1.2, the grant may be reduced (see Article 43).
5
Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public work contracts, public supply contracts and public service contracts (OJ L 134, 30.04.2004, p. 114).
6
Directive 2014/24/EU of the European Parliament and of the Council of 26 February 2014 on public procurement and repealing Directive 2004/18/EC. (OJ L 94, 28.03.2014, p. 65).
7
Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement procedures of entities operating in the water,
energy,
transport and postal services sectors (OJ L 134, 30.04.2004, p. 1)
8
Directive 2014/25/EU of the European Parliament and of the Council of 26 February 2014 on procurement by entities operating in the water, energy, transport and postal services sectors and repealing Directive 2004/17/EC (OJ L 94, 28.03.2014, p. 243).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 11 — USE OF IN-KIND CONTRIBUTIONS PROVIDED BY THIRD PARTIES AGAINST PAYMENT
11.1
Rules for the use of in-kind contributions against
payment
If
necessary
to
implement
the
action,
the
beneficiaries
may
use
in-kind
contributions
provided
by
third parties against
payment.
The beneficiaries may declare costs related to the payment of in-kind contributions as eligible (see Article 6.1 and 6.2), up to the third parties’ costs for the seconded persons, contributed equipment, infrastructure or other assets or other contributed goods and services.
The third parties and their contributions must be set out in Annex 1. The Commission may however approve in-kind contributions not set out in Annex 1 without amendment (see Article 55), if:
·
they are specifically justified in the periodic technical report
and
·
their
use
does
not
entail
changes
to
the
Agreement
which
would
call
into
question
the
decision awarding the grant or breach the principle of equal treatment of
applicants.
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards the third parties.
11.2
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the costs related to the payment of the in-kind contribution will be ineligible (see Article 6) and will be rejected (see Article 42).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 12 — USE OF IN-KIND CONTRIBUTIONS PROVIDED BY THIRD PARTIES FREE OF CHARGE
12.1
Rules for the use of in-kind contributions free of
charge
If
necessary
to
implement
the
action,
the
beneficiaries
may
use
in-kind
contributions
provided
by
third parties free of
charge.
The
beneficiaries
may
declare
costs
incurred
by
the
third
parties
for
the
seconded
persons,
contributed equipment, infrastructure or other assets or other contributed goods and services as eligible in accordance with Article
6.4.
The third parties and their contributions must be set out in Annex 1. The Commission may however approve in-kind contributions not set out in Annex 1 without amendment (see Article 55), if:
·
they are specifically justified in the periodic technical report
and
·
their
use
does
not
entail
changes
to
the
Agreement
which
would
call
into
question
the
decision awarding the grant or breach the principle of equal treatment of
applicants.
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards the third parties.
12.2
Consequences of
non-compliance
If
a
beneficiary
breaches
any
of
its
obligations
under
this
Article,
the
costs
incurred
by
the
third
parties related
to
the
in-kind
contribution
will
be
ineligible
(see
Article
6)
and
will
be
rejected
(see
Article
42).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 13 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS
13.1
Rules for subcontracting action
tasks
13.1.1
If necessary to implement the action, the beneficiaries may award subcontracts covering the implementation of certain action tasks described in Annex
1.
Subcontracting may cover only a limited part of the action.
The beneficiaries must award the subcontracts ensuring the best value for money or, if appropriate, the lowest price. In doing so, they must avoid any conflict of interests (see Article 35).
The
tasks
to
be
implemented
and
the
estimated
cost
for
each
subcontract
must
be
set
out
in
Annex
1
and the
total
estimated
costs
of
subcontracting
per
beneficiary
must
be
set
out
in
Annex
2.
The
Commission may however approve subcontracts not set out in Annex 1 and 2 without amendment (see Article 55),
if:
·
they are specifically justified in the periodic technical report
and
·
they do not entail changes to the Agreement which would call into question the decision awarding the grant or breach the principle of equal treatment of
applicants.
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards their subcontractors.
13.1.2
The
beneficiaries
must
ensure
that
their
obligations
under
Articles
35,
36,
38
and
46
also
apply to the
subcontractors.
Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC (or 2014/24/EU) or ‘contracting entities’ within the meaning of Directive 2004/17/EC (or 2014/25/EU) must comply with the applicable national law on public procurement.
13.2 Consequences of non-compliance
If
a
beneficiary
breaches
any
of
its
obligations
under
Article
13.1.1,
the
costs
related
to
the
subcontract concerned will be ineligible (see Article 6) and will be rejected (see Article
42).
If a beneficiary breaches any of its obligations under Article 13.1.2, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 14 — IMPLEMENTATION OF ACTION TASKS BY LINKED THIRD PARTIES
14.1
Rules for calling upon linked third parties to implement part of the
action
14.1.1
The
following
affiliated
entities
10
and
third
parties
with
a
legal
link
to
a
beneficiary
11
(‘
linked third parties
’) may implement the action tasks attributed to them in Annex 1:
·
INTRASOFT
INTERNATIONAL
SA (INTRA-LU), affiliated or linked to
INTRASOFT
·
TECNOLOGIAS Y
SERVICIOS
AGRARIOS, S.A.
(TRAGSATEC),
affiliated or linked to TRAGSA
The linked third parties may declare as eligible the costs they incur for implementing the action tasks in accordance with Article 6.3.
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards their linked third parties.
14.1.2
The beneficiaries must ensure that their obligations under Articles 18, 20, 35, 36 and 38
also apply to their linked third
parties.
14.2 Consequences of non-compliance
If any obligation under Article 14.1.1 is breached, the costs of the linked third party will be ineligible (see Article 6) and will be rejected (see Article 42).
If any obligation under Article 14.1.2 is breached, the grant may be reduced (see Article 43). Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 15 — FINANCIAL SUPPORT TO THIRD PARTIES
15.1
Rules for providing financial support to third
parties
Not applicable
10
For the definition, see Article 2.1(2) of the Rules for Participation Regulation No 1290/2013: '
affiliated entity
' means any legal entity that is:
·
under the direct or indirect control of a participant,
or
·
under the same direct or indirect control as the participant,
or
·
directly or indirectly controlling a participant. ‘Control’ may take any of the following
forms:
(a)
the
direct
or
indirect
holding
of
more
than
50%
of
the
nominal
value
of
the
issued
share
capital
in
the
legal
entity concerned, or of a majority of the voting rights of the shareholders or associates of that
entity;
(b)
the direct or indirect holding, in fact or in
law,
of decision-making powers in the legal entity concerned. However the following relationships between legal entities shall not in themselves be deemed to constitute
controlling relationships:
(a)
the
same
public
investment
corporation,
institutional
investor
or
venture-capital
company
has
a
direct
or
indirect holding of more than 50% of the nominal value of the issued share capital or a majority of voting rights of the shareholders or
associates;
(b)
the legal entities concerned are owned or supervised by the same public
body.
11
‘
Third party with a legal link to a beneficiary
’ is any legal entity which has a legal link to the beneficiary implying collaboration that is not limited to the action.
15.2
Financial support in the form of
prizes
Not applicable
15.3
Consequences of
non-compliance
Not applicable
ARTICLE 16 — PROVISION OF TRANS-NATIONAL OR VIRTUAL ACCESS TO RESEARCH INFRASTRUCTURE
16.1
Rules for providing trans-national access to research
infrastructure
Not applicable
16.2
Rules for providing virtual access to research
infrastructure
Not applicable
16.3
Consequences of
non-compliance
Not applicable
SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT ADMINISTRATION
ARTICLE 17 — GENERAL OBLIGATION TO INFORM
17.1
General obligation to provide information upon
request
The
beneficiaries
must
provide
—
during
implementation
of
the
action
or
afterwards
and
in
accordance with Article 41.2 — any information requested in order to verify eligibility of the costs, proper implementation of the action and compliance with any other obligation under the
Agreement.
17.2
Obligation to keep information up to date and to inform about events and
circumstances likely to affect the
Agreement
Each beneficiary must keep information stored in the Participant Portal Beneficiary Register (via the electronic exchange system; see Article 52) up to date, in particular, its name, address, legal representatives, legal form and organisation
type.
Each beneficiary must immediately inform the coordinator — which must immediately inform the Commission and the other beneficiaries — of any of the following:
(a)
events
which are likely to affect significantly or delay the implementation of the action or the EU's financial interests, in
particular:
(i)
changes
in
its
legal,
financial,
technical,
organisational
or
ownership
situation
or
those
of its linked third parties
and
(ii)
changes in the name, address, legal form, organisation type of its linked third
parties;
(b)
circumstances
affecting:
(i)
the decision to award the grant
or
(ii)
compliance with requirements under the
Agreement.
17.3
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 18 — KEEPING RECORDS — SUPPORTING DOCUMENTATION
18.1
Obligation to keep records and other supporting
documentation
The beneficiaries must — for a period of five years after the payment of the balance — keep
records and other supporting documentation in order to prove the proper implementation of the action and the costs they declare as
eligible.
They must make them available upon request (see Article 17) or in the context of checks, reviews, audits or investigations (see Article 22).
If
there
are
on-going
checks,
reviews,
audits,
investigations,
litigation
or
other
pursuits
of
claims
under the Agreement (including the extension of findings; see Articles 22), the beneficiaries must keep the records and other supporting documentation until the end of these
procedures.
The
beneficiaries
must
keep
the
original
documents.
Digital
and
digitalised
documents
are
considered originals if they are authorised by the applicable national
law.
The Commission may accept non- original documents if it considers that they offer a comparable level of
assurance.
18.1.1
Records and other supporting documentation on the scientific and technical implementation
The beneficiaries must keep records and other supporting documentation on scientific and technical implementation of the action in line with the accepted standards in the respective field.
18.1.2
Records and other documentation to support the costs
declared
The
beneficiaries
must
keep
the
records
and
documentation
supporting
the
costs
declared,
in
particular the
following:
(a)
for
actual costs
: adequate records and other supporting documentation to prove the costs declared, such as contracts, subcontracts, invoices and accounting records. In addition, the beneficiaries'
usual
cost
accounting
practices
and
internal
control
procedures
must
enable
direct reconciliation between the amounts declared, the amounts recorded in their accounts and the amounts stated in the supporting
documentation;
(b)
for
unit costs
: adequate records and other supporting documentation to prove the number of units
declared.
Beneficiaries
do
not
need
to
identify
the
actual
eligible
costs
covered
or
to
keep or provide supporting documentation (such as accounting statements) to prove the amount
per unit.
30
In addition,
for direct personnel costs declared as unit costs calculated in accordance with
the
beneficiary's
usual
cost
accounting
practices
,
the
beneficiaries
must
keep
adequate records and documentation to prove that the cost accounting practices used comply with the conditions set out in Article 6.2, Point
A.
The beneficiaries and linked third parties may submit to the Commission, for approval, a certificate (drawn up in accordance with Annex 6) stating that their usual cost accounting practices comply with these conditions (‘
certificate on the methodology
’). If the certificate is
approved,
costs
declared
in
line
with
this
methodology
will
not
be
challenged
subsequently, unless the beneficiaries have concealed information for the purpose of the
approval.
(c)
for
flat-rate
costs
:
adequate
records
and
other
supporting
documentation
to
prove
the
eligibility of
the
costs
to
which
the
flat-rate
is
applied.
The
beneficiaries
do
not
need
to
identify
the
costs covered or provide supporting documentation (such as accounting statements) to prove the amount declared at a
flat-rate.
In
addition,
for
personnel
costs
(declared
as
actual
costs
or
on
the
basis
of
unit
costs),
the
beneficiaries must keep
time records
for the number of hours declared. The time records must be in writing and approved
by
the
persons
working
on
the
action
and
their
supervisors,
at
least
monthly.
In
the
absence of reliable time records of the hours worked on the action, the Commission may accept alternative evidence supporting the number of hours declared, if it considers that it offers an adequate level of assurance.
As
an
exception,
for
persons
working
exclusively
on
the
action
,
there
is
no
need
to
keep
time
records, if
the
beneficiary
signs
a
declaration
confirming
that
the
persons
concerned
have
worked
exclusively on the
action.
For costs declared by linked third parties (see Article 14), it is the beneficiary that must keep the originals
of
the
financial
statements
and
the
certificates
on
the
financial
statements
of
the
linked
third parties.
18.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, costs insufficiently substantiated will be ineligible (see Article 6) and will be rejected (see Article 42), and the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 19 — SUBMISSION OF DELIVERABLES
19.1
Obligation to submit
deliverables
The coordinator must submit the ‘
deliverables
’ identified in Annex 1, in accordance with the
timing and conditions set out in
it.
19.2
Consequences of
non-compliance
If the coordinator breaches any of its obligations under this Article, the Commission may apply any of the measures described in Chapter 6.
39
ARTICLE 20 — REPORTING — PAYMENT REQUESTS
20.1
Obligation to submit
reports
The coordinator must submit to the Commission (see Article 52) the technical and financial reports set out in this Article. These reports include requests for payment and must be drawn up using the forms and templates provided in the electronic exchange system (see Article 52).
20.2
Reporting
periods
The action is divided into the following ‘
reporting periods
’:
·
RP1: from month 1 to month
18
·
RP2: from month 19 to month
36
20.3
Periodic reports — Requests for interim
payments
The coordinator must submit a periodic report within 60 days following the end of each reporting period.
The
periodic report
must include the following:
(a)
a ‘
periodic technical report
’
containing:
(i)
an
explanation of the work carried out
by the
beneficiaries;
(ii)
an
overview
of
the
progress
towards
the
objectives
of
the
action,
including
milestones
and deliverables identified in Annex
1.
This report must include explanations justifying the differences between work expected to be carried out in accordance with Annex 1 and that actually carried out.
The
report
must
detail
the
exploitation
and
dissemination
of
the
results
and
—
if
required
in Annex 1 — an updated ‘
plan for the exploitation and dissemination of the
results
’.
The report must indicate the communication activities;
(iii)
a
summary
for publication by the
Commission;
(iv)
the answers to the ‘
questionnaire
’, covering issues related to the action implementation and the economic and societal impact, notably in the context of the Horizon 2020 key performance indicators and the Horizon 2020 monitoring
requirements;
(b)
a ‘
periodic financial report
’
containing:
(i)
an ‘
individual financial statement
’ (see Annex 4) from each beneficiary and from each linked third party, for the reporting period
concerned.
The individual financial statement must detail the eligible costs (actual costs, unit costs
and flat-rate costs; see Article 6) for each budget category (see Annex
2).
The
beneficiaries
and
linked
third
parties
must
declare
all
eligible
costs,
even
if
—
for
actual costs, unit costs and flat-rate costs — they exceed the amounts indicated in the estimated budget
(see
Annex
2).
Amounts
which
are
not
declared
in
the
individual
financial
statement will not be taken into account by the
Commission.
If
an
individual
financial
statement
is
not
submitted
for
a
reporting
period,
it
may
be
included in the periodic financial report for the next reporting
period.
The individual financial statements of the last reporting period must also detail the
receipts of the action
(see Article 5.3.3).
Each beneficiary and each linked third party must
certify
that:
·
the information provided is full, reliable and
true;
·
the costs declared are eligible (see Article
6);
·
the
costs
can
be
substantiated
by
adequate
records
and
supporting
documentation
(see Article 18) that will be produced upon request (see Article 17) or in the context of checks, reviews, audits and investigations (see Article 22),
and
·
for the last reporting period: that all the receipts have been declared (see Article
5.3.3);
(ii)
an
explanation of the use of resources
and the information on subcontracting (see Article
13)
and
in-kind
contributions
provided
by
third
parties
(see
Articles
11
and
12)
from each beneficiary and from each linked third party, for the reporting period
concerned;
(iii)
not
applicable;
(iv)
a ‘
periodic summary financial statement
’, created automatically by the electronic exchange system, consolidating the individual financial statements for the reporting period concerned and including — except for the last reporting period — the
request for interim payment
.
20.4
Final report — Request for payment of the
balance
In addition to the periodic report for the last reporting period, the coordinator must submit the final report within 60 days following the end of the last reporting period.
The
final report
must include the following:
(a)
a ‘
final technical report
’ with a
summary
for publication
containing:
(i)
an overview of the results and their exploitation and
dissemination;
(ii)
the conclusions on the action,
and
(iii)
the socio-economic impact of the
action;
(b)
a ‘
final financial report
’
containing:
(i)
a ‘
final summary financial statement
’, created automatically by the electronic exchange system, consolidating the individual financial statements for all reporting periods and including the
request for payment of the balance
and
(ii)
a
‘
certificate
on
the
financial
statements
’
(drawn
up
in
accordance
with
Annex
5)
for
each beneficiary
and
for
each
linked
third
party,
if
it
requests
a
total
contribution
of
EUR
325
000
or more, as reimbursement of actual costs and unit costs calculated on the basis of its usual cost accounting practices (see Article 5.2 and Article 6.2, Point A).
20.5
Information on cumulative expenditure
incurred
Not applicable
20.6
Currency for financial statements and conversion into
euro
Financial statements must be drafted in euro.
Beneficiaries and linked third parties with accounting established in a currency other than the euro must convert the costs recorded in their accounts into euro, at the average of the daily exchange rates published in the C series of the
Official Journal of the European Union
, calculated over the corresponding reporting
period.
If no daily euro exchange rate is published in the
Official Journal of the European Union
for the currency
in
question,
they
must
be
converted
at
the
average
of
the
monthly
accounting
rates
published on the Commission’s website, calculated over the corresponding reporting
period.
Beneficiaries and linked third parties with accounting established in euro must convert costs incurred in another currency into euro according to their usual accounting practices.
20.7
Language of
reports
All reports (technical and financial reports, including financial statements) must be submitted in the language of the Agreement.
20.8
Consequences of
non-compliance
If the reports submitted do not comply with this Article, the Commission may suspend the payment deadline (see Article 47) and apply any of the other measures described in Chapter 6.
If the coordinator breaches its obligation to submit the reports and if it fails to comply with this obligation
within
30
days
following
a
written
reminder,
the
Commission
may
terminate
the
Agreement (see Article 50) or apply any of the other measures described in Chapter
6.
ARTICLE 21 — PAYMENTS AND PAYMENT ARRANGEMENTS
21.1
Payments to be
made
The following payments will be made to the coordinator:
·
one
pre-financing
payment
;
·
one or more
interim payments
, on the basis of the request(s) for interim payment (see Article 20),
and
·
one
payment of the balance
, on the basis of the request for payment of the balance (see Article
20).
21.2
Pre-financing payment — Amount — Amount retained for the Guarantee
Fund
The aim of the pre-financing is to provide the beneficiaries with a float.
It remains the property of the EU until the payment of the balance.
The
amount
of
the
pre-financing
payment
will
be
EUR
10,064,388.93
(ten
million
sixty
four
thousand three hundred and eighty eight EURO and ninety three
eurocents).
The Commission will — except if Article 48 applies — make the pre-financing payment to the coordinator
within
30
days,
either
from
the
entry
into
force
of
the
Agreement
(see
Article
58)
or
from 10 days before the starting date of the action (see Article 3), whichever is the
latest.
An amount of EUR
629,024.31
(six hundred and twenty nine thousand twenty four EURO and
thirty one eurocents), corresponding to 5% of the maximum grant amount (see Article 5.1), is retained by the Commission from the pre-financing payment and transferred into the ‘
Guarantee
Fund
’.
21.3
Interim payments — Amount —
Calculation
Interim payments reimburse the eligible costs incurred for the implementation of the action during the corresponding reporting periods.
The
Commission
will
pay
to
the
coordinator
the
amount
due
as
interim
payment
within
90
days
from receiving the periodic report (see Article 20.3), except if Articles 47 or 48
apply.
Payment is subject to the approval of the periodic report. Its approval does not imply recognition of the compliance, authenticity, completeness or correctness of its content.
The
amount due as interim payment
is calculated by the Commission in the following steps: Step 1 – Application of the reimbursement rates
Step 2 – Limit to 90% of the maximum grant amount
21.3.1
Step 1 — Application of the reimbursement
rates
The
reimbursement
rate(s)
(see
Article
5.2)
are
applied
to
the
eligible
costs
(actual
costs,
unit
costs
and flat-rate
costs
;
see
Article
6)
declared
by
the
beneficiaries
and
the
linked
third
parties
(see
Article
20) and approved by the Commission (see above) for the concerned reporting
period.
21.3.2
Step 2 — Limit to 90% of the maximum grant
amount
The
total
amount
of
pre-financing
and
interim
payments
must
not
exceed
90%
of
the
maximum
grant amount set out in Article 5.1. The maximum amount for the interim payment will be calculated as follows:
{
90% of the maximum grant amount (see Article 5.1) minus
{pre-financing and previous interim payments}
}
.
21.4
Payment of the balance — Amount — Calculation — Release of the amount retained
for the Guarantee
Fund
The payment of the balance reimburses the remaining part of the eligible costs incurred by the beneficiaries for the implementation of the action.
If the total amount of earlier payments is greater than the final grant amount (see Article 5.3), the payment of the balance takes the form of a recovery (see Article 44).
If
the
total
amount
of
earlier
payments
is
lower
than
the
final
grant
amount,
the
Commission
will
pay the balance within 90 days from receiving the final report (see Article 20.4), except if Articles 47 or 48
apply.
Payment is subject to the approval of the final report. Its approval does not imply recognition of the compliance, authenticity, completeness or correctness of its content.
The
amount due as the balance
is calculated by the Commission by deducting the total amount of pre-financing and interim payments (if any) already made, from the final grant amount determined in accordance with Article 5.3:
{
final grant amount (see Article 5.3) minus
{pre-financing and interim payments (if any) made}
}
.
At
the
payment
of
the
balance,
the
amount
retained
for
the
Guarantee
Fund
(see
above)
will
be
released and:
·
if the balance is positive: the amount released will be paid in full to the coordinator together with the amount due as the
balance;
·
if the balance is negative (payment of the balance taking the form of recovery): it will be deducted from the amount released (see Article 44.1.2). If the resulting
amount:
·
is positive, it will be paid to the
coordinator
·
is negative, it will be
recovered.
The amount to be paid may however be offset — without the beneficiaries' consent — against any other amount owed by a beneficiary to the Commission or an executive agency (under the EU or Euratom
budget),
up
to
the
maximum
EU
contribution
indicated,
for
that
beneficiary,
in
the
estimated budget (see Annex
2).
21.5
Notification of amounts
due
When making payments, the Commission will formally notify to the coordinator the amount due, specifying whether it concerns an interim payment or the payment of the balance.
For the payment of the balance, the notification will also specify the final grant amount.
In the case of reduction of the grant or recovery of undue amounts, the notification will be preceded by the contradictory procedure set out in Articles 43 and 44.
21.6
Currency for
payments
The Commission will make all payments in euro.
21.7
Payments to the coordinator — Distribution to the
beneficiaries
Payments will be made to the coordinator.
Payments to the coordinator will discharge the Commission from its payment obligation.
The coordinator must distribute the payments between the beneficiaries without unjustified delay. Pre-financing may however be distributed only:
(a)
if the minimum number of beneficiaries set out in the call for proposals has acceded to the Agreement (see Article 56)
and
(b)
to beneficiaries that have acceded to the Agreement (see Article
56).
21.8
Bank account for
payments
All payments will be made to the following bank account:
Name of bank: BNP PARIBAS FORTIS (FORTIS BANK SA/NV)
Full name of the account holder: INTRASOFT
INTERNATIONAL
Full account number (including bank codes):
()
IBAN code: BE53210069520053
21.9
Costs of payment
transfers
The cost of the payment transfers is borne as follows:
·
the Commission bears the cost of transfers charged by its
bank;
·
the beneficiary bears the cost of transfers charged by its
bank;
·
the party causing a repetition of a transfer bears all costs of the repeated
transfer.
21.10
Date of
payment
Payments by the Commission are considered to have been carried out on the date when they are debited to its account.
21.11
Consequences of
non-compliance
21.11.1
If the Commission does not pay within the payment deadlines (see above), the beneficiaries are entitled to
late-payment interest
at the rate applied by the European Central Bank (ECB) for its main
refinancing
operations
in
euros
(‘reference
rate’),
plus
three
and
a
half
points.
The
reference
rate is the rate in force on the first day of the month in which the payment deadline expires, as published in the C series of the
Official Journal of the European
Union
.
If the late-payment interest is lower than or equal to EUR 200, it will be paid to the coordinator only upon request submitted within two months of receiving the late payment.
Late-payment interest is not due if all beneficiaries are EU Member States (including regional and local
government
authorities
or
other
public
bodies
acting
on
behalf
of
a
Member
State
for
the
purpose of this
Agreement).
Suspension of the payment deadline or payments (see Articles 47 and 48) will not be considered as late payment.
Late-payment
interest
covers
the
period
running
from
the
day
following
the
due
date
for
payment
(see above), up to and including the date of
payment.
Late-payment interest is not considered for the purposes of calculating the final grant amount.
21.11.2
If
the
coordinator
breaches
any
of
its
obligations
under
this
Article,
the
grant
may
be
reduced (see Article 43) and the Agreement or the participation of the coordinator may be terminated (see Article
50).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 22 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF FINDINGS
22.1
Checks, reviews and audits by the
Commission
22.1.1
Right to carry out
checks
The Commission will — during the implementation of the action or afterwards — check the proper implementation of the action and compliance with the obligations under the Agreement, including assessing deliverables and reports.
For this purpose the Commission may be assisted by external persons or bodies.
The Commission may also request additional information in accordance with Article 17. The Commission may request beneficiaries to provide such information to it directly.
Information provided must be accurate, precise and complete and in the format requested, including electronic format.
22.1.2
Right to carry out
reviews
The Commission may — during the implementation of the action or afterwards — carry out reviews on the proper implementation of the action (including assessment of deliverables and reports), compliance with the obligations under the Agreement and continued scientific or technological relevance of the action.
Reviews may be started
up to two years after the payment of the balance
. They will be formally notified
to
the
coordinator
or
beneficiary
concerned
and
will
be
considered
to
have
started
on
the
date of the formal
notification.
If the review is carried out on a third party (see Articles 10 to 16), the beneficiary concerned must inform the third party.
The Commission may carry out reviews directly (using its own staff) or indirectly (using external persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned of the identity
of
the
external
persons
or
bodies.
They
have
the
right
to
object
to
the
appointment
on
grounds of commercial
confidentiality.
The coordinator or beneficiary concerned must provide — within the deadline requested — any information
and
data
in
addition
to
deliverables
and
reports
already
submitted
(including
information on the use of resources). The Commission may request beneficiaries to provide such information to it
directly.
The
coordinator
or
beneficiary
concerned
may
be
requested
to
participate
in
meetings,
including
with external
experts.
For
on-the-spot
reviews,
the
beneficiaries
must
allow
access
to
their
sites
and
premises,
including
to external persons or bodies, and must ensure that information requested is readily
available.
Information provided must be accurate, precise and complete and in the format requested, including electronic format.
On the basis of the review findings, a ‘
review report
’ will be drawn up.
The Commission will formally notify the review report to the coordinator or beneficiary concerned, which has 30 days to formally notify observations (‘
contradictory review procedure
’).
Reviews (including review reports) are in the language of the Agreement.
22.1.3
Right to carry out
audits
The
Commission
may
—
during
the
implementation
of
the
action
or
afterwards
—
carry
out
audits
on the proper implementation of the action and compliance with the obligations under the
Agreement.
Audits may be started
up to two years after the payment of the balance
. They will be formally notified
to
the
coordinator
or
beneficiary
concerned
and
will
be
considered
to
have
started
on
the
date of the formal
notification.
If the audit is carried out on a third party (see Articles 10 to 16), the beneficiary concerned must inform the third party.
The Commission may carry out audits directly (using its own staff) or indirectly (using external persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned of the identity
of
the
external
persons
or
bodies.
They
have
the
right
to
object
to
the
appointment
on
grounds of commercial
confidentiality.
The coordinator or beneficiary concerned must provide — within the deadline requested — any information (including complete accounts, individual salary statements or other personal data) to verify compliance with the Agreement. The Commission may request beneficiaries to provide such information to it directly.
For
on-the-spot
audits, the beneficiaries must allow access to their sites and premises, including to external persons or bodies, and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including electronic format.
On the basis of the audit findings, a ‘
draft audit report
’ will be drawn up.
The
Commission
will
formally
notify
the
draft
audit
report
to
the
coordinator
or
beneficiary
concerned, which has 30 days to formally notify observations (‘
contradictory audit procedure
’). This period may be extended by the Commission in justified
cases.
The ‘
final audit report
’ will take into account observations by the coordinator or beneficiary concerned. The report will be formally notified to it.
Audits (including audit reports) are in the language of the Agreement.
The Commission may also access the beneficiaries’ statutory records for the periodical assessment of unit costs or flat-rate amounts.
22.2
Investigations by the European Anti-Fraud Office
(OLAF)
Under Regulations No 883/2013
14
and No 2185/96
15
(and in accordance with their provisions and procedures),
the
European
Anti-Fraud
Office
(OLAF)
may
—
at
any
moment
during
implementation of the action or afterwards — carry out investigations, including on-the-spot checks and
inspections, to
establish
whether
there
has
been
fraud,
corruption
or
any
other
illegal
activity
affecting
the
financial interests of the
EU.
22.3
Checks and audits by the European Court of Auditors
(ECA)
Under Article 287 of the Treaty on the Functioning of the European Union (TFEU) and Article 161 of the Financial Regulation No 966/2012
16
, the European Court of Auditors (ECA) may — at any moment during implementation of the action or afterwards — carry out audits.
The ECA has the right of access for the purpose of checks and audits.
22.4
Checks, reviews, audits and investigations for international
organisations
Not applicable
22.5
Consequences of findings in checks, reviews, audits and investigations — Extension
of findings
22.5.1
Findings in this
grant
Findings in checks, reviews, audits or investigations carried out in the context of this grant may lead to
the
rejection
of
ineligible
costs
(see
Article
42),
reduction
of
the
grant
(see
Article
43),
recovery
of undue amounts (see Article 44) or to any of the other measures described in Chapter
6.
Rejection
of
costs
or
reduction
of
the
grant
after
the
payment
of
the
balance
will
lead
to
a
revised
final grant amount (see Article
5.4).
Findings in checks, reviews, audits or investigations may lead to a request for amendment for the modification of Annex 1 (see Article 55).
Checks,
reviews,
audits
or
investigations
that
find
systemic
or
recurrent
errors,
irregularities,
fraud
or breach of obligations may also lead to consequences in other EU or Euratom grants awarded under similar conditions (‘
extension of findings from this grant to other
grants
’).
14
Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013 concerning investigations conducted by the European Anti-Fraud Office (OLAF) and repealing Regulation (EC) No 1073/1999
of
the
European
Parliament
and
of
the
Council
and
Council
Regulation
(Euratom)
No
1074/1999
(OJ
L
248, 18.09.2013, p. 1).
15
Council
Regulation
(Euratom,
EC)
No
2185/1996
of
11
November
1996
concerning
on-the-spot
checks
and
inspections carried
out
by
the
Commission
in
order
to
protect
the
European
Communities'
financial
interests
against
fraud
and
other irregularities (OJ L 292, 15.11.1996, p.
2).
16
Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing Council Regulation (EC, Euratom) No 1605/2002 (OJ L 298, 26.10.2012, p. 1).
40
Moreover, findings arising from an OLAF investigation may lead to criminal prosecution under national law.
22.5.2
Findings in other
grants
The Commission may extend findings from other grants to this grant (‘
extension of findings from other grants to this grant
’), if:
(a)
the beneficiary concerned is found, in other EU or Euratom grants awarded under similar conditions, to have committed systemic or recurrent errors, irregularities, fraud or breach of obligations that have a material impact on this grant
and
(b)
those findings are formally notified to the beneficiary concerned — together with the list of grants affected by the findings — no later than two years after the payment of the balance of this
grant.
The extension of findings may lead to the rejection of costs (see Article 42), reduction of the grant (see
Article
43),
recovery
of
undue
amounts
(see
Article
44),
suspension
of
payments
(see
Article
48), suspension of the action implementation (see Article 49) or termination (see Article
50).
22.5.3
Procedure
The Commission will formally notify the beneficiary concerned the systemic or recurrent errors and its intention to extend these audit findings, together with the list of grants affected.
22.5.3.1
If the findings concern
eligibility of costs
: the formal notification will
include:
(a)
an invitation to submit observations on the list of grants affected by the
findings;
(b)
the request to submit
revised financial statements
for all grants
affected;
(c)
the
correction rate for extrapolation
established by the Commission on the basis of the systemic
or
recurrent
errors,
to
calculate
the
amounts
to
be
rejected
if
the
beneficiary
concerned:
(i)
considers
that
the
submission
of
revised
financial
statements
is
not
possible
or
practicable or
(ii)
does not submit revised financial
statements.
The beneficiary concerned has 90 days from receiving notification to submit observations, revised financial statements or to propose a duly substantiated
alternative correction method
. This period may be extended by the Commission in justified cases.
The Commission may then start a rejection procedure in accordance with Article 42, on the basis of:
·
the revised financial statements, if
approved;
·
the proposed alternative correction method, if
accepted or
·
the initially notified correction rate for extrapolation, if it does not receive any observations or revised financial statements, does not accept the observations or the proposed alternative correction method or does not approve the revised financial
statements.
49
22.5.3.2
If the findings concern
substantial errors
,
irregularities or fraud
or
serious breach of obligations
: the formal notification will
include:
(a)
an invitation to submit observations on the list of grants affected by the findings
and
(b)
the flat-rate the Commission intends to apply according to the principle of
proportionality.
The beneficiary concerned has 90 days from receiving notification to submit observations or to propose a duly substantiated alternative flat-rate.
The Commission may then start a reduction procedure in accordance with Article 43, on the basis of:
·
the proposed alternative flat-rate, if
accepted or
·
the initially notified flat-rate, if it does not receive any observations or does not accept the observations or the proposed alternative
flat-rate.
22.6 Consequences of non-compliance
If
a
beneficiary
breaches
any
of
its
obligations
under
this
Article,
any
insufficiently
substantiated
costs will be ineligible (see Article 6) and will be rejected (see Article
42).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 23 — EVALUATION OF THE IMPACT OF THE ACTION
23.1
Right to evaluate the impact of the
action
The Commission may carry out interim and final evaluations of the impact of the action measured against the objective of the EU programme.
Evaluations
may
be
started
during
implementation
of
the
action
and
up
to
five
years
after
the
payment of the balance. The evaluation is considered to start on the date of the formal notification to the coordinator or
beneficiaries.
The
Commission
may
make
these
evaluations
directly
(using
its
own
staff)
or
indirectly
(using
external bodies or persons it has authorised to do
so).
The coordinator or beneficiaries must provide any information relevant to evaluate the impact of the action, including information in electronic format.
23.2
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the Commission may apply the measures described in Chapter 6.
SECTION 3 RIGHTS AND OBLIGATIONS RELATED TO BACKGROUND AND RESULTS
SUBSECTION 1
GENERAL
ARTICLE 23a — MANAGEMENT OF INTELLECTUAL PROPERTY
23a.1 Obligation to take measures to implement the Commission Recommendation on the management of intellectual property in knowledge transfer activities
Beneficiaries that are universities or other public research organisations must take measures to implement
the
principles
set
out
in
Points
1
and
2
of
the
Code
of
Practice
annexed
to
the
Commission Recommendation on the management of intellectual property in knowledge transfer
activities
17
.
This does not change the obligations set out in Subsections 2 and 3 of this Section.
The beneficiaries must ensure that researchers and third parties involved in the action are aware of them.
23a.2 Consequences of non-compliance
If a beneficiary breaches its obligations under this Article, the Commission may apply any of the measures described in Chapter 6.
SUBSECTION 2 RIGHTS AND OBLIGATIONS RELATED TO BACKGROUND
ARTICLE 24 — AGREEMENT ON BACKGROUND
24.1
Agreement on
background
The beneficiaries must identify and agree (in writing) on the background for the action (‘
agreement on background
’).
‘
Background
’ means any data, know-how or information — whatever its form or nature (tangible or intangible), including any rights such as intellectual property rights — that:
(a)
is held by the beneficiaries before they acceded to the Agreement,
and
(b)
is needed to implement the action or exploit the
results.
24.2
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 25 — ACCESS RIGHTS TO BACKGROUND
25.1
Exercise of access rights — Waiving of access rights — No
sub-licensing
To exercise access rights, this must first be requested in writing (‘
request for access
’).
17
Commission Recommendation C(2008) 1329 of 10.4.2008 on the management of intellectual property in knowledge transfer activities and the Code of Practice for universities and other public research institutions attached to this recommendation.
‘
Access rights
’ means rights to use results or background under the terms and conditions laid down in this Agreement.
Waivers of access rights are not valid unless in writing.
Unless agreed otherwise, access rights do not include the right to sub-license.
25.2
Access rights for other beneficiaries, for implementing their own tasks under the
action
The beneficiaries must give each other access — on a royalty-free basis — to background needed to implement their own tasks under the action, unless the beneficiary that holds the background has — before acceding to the Agreement —:
(a)
informed the other beneficiaries that access to its background is subject to legal restrictions
or limits, including those imposed by the rights of third parties (including personnel),
or
(b)
agreed with the other beneficiaries that access would not be on a royalty-free
basis.
25.3
Access rights for other beneficiaries, for exploiting their own
results
The beneficiaries must give each other access — under fair and reasonable conditions — to background needed for exploiting their own results, unless the beneficiary that holds the
background has — before acceding to the Agreement — informed the other beneficiaries that access to its background is subject to legal restrictions or limits, including those imposed by the rights of third parties (including
personnel).
‘
Fair and reasonable conditions
’ means appropriate conditions, including possible financial terms or
royalty-free
conditions,
taking
into
account
the
specific
circumstances
of
the
request
for
access,
for example
the
actual
or
potential
value
of
the
results
or
background
to
which
access
is
requested
and/or the scope, duration or other characteristics of the exploitation
envisaged.
Requests for access may be made — unless agreed otherwise — up to one year after the period set out in Article 3.
25.4
Access rights for affiliated
entities
Unless otherwise agreed in the consortium agreement, access to background must also be given
·
under fair and reasonable conditions (see above; Article 25.3) and unless it is subject to legal restrictions or limits, including those imposed by the rights of third parties (including personnel) — to affiliated entities
18
established in an EU Member State or ‘
associated country
’
19
, if this is needed to exploit the results generated by the beneficiaries to which they are
affiliated.
Unless agreed otherwise (see above; Article 25.1), the affiliated entity concerned must make the request directly to the beneficiary that holds the background.
Requests for access may be made — unless agreed otherwise — up to one year after the period set out in Article 3.
18
For the definition, see ‘affiliated entity’ footnote (Article 14.1).
19
For the definition, see Article 2.1(3) of the Rules for Participation Regulation No 1290/2013: ‘
associated country
’ means
a
third
country
which
is
party
to
an
international
agreement
with
the
Union,
as
identified
in
Article
7
of
Horizon 2020 Framework Programme Regulation No 1291/2013. Article 7 sets out the conditions for association of non-EU countries to Horizon
2020.
25.5
Access rights for third
parties
Not applicable
25.6
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
SUBSECTION 3 RIGHTS AND OBLIGATIONS
RELATED TO
RESULTS
ARTICLE 26 — OWNERSHIP OF
RESULTS
26.1
Ownership by the beneficiary that generates the
results
Results are owned by the beneficiary that generates them.
‘
Results
’ means any (tangible or intangible) output of the action such as data, knowledge or information — whatever its form or nature, whether it can be protected or not — that is generated in the action, as well as any rights attached to it, including intellectual property rights.
26.2
Joint ownership by several
beneficiaries
Two or more beneficiaries own results jointly if:
(a)
they have jointly generated them
and
(b)
it is not possible
to:
(i)
establish the respective contribution of each beneficiary,
or
(ii)
separate them for the purpose of applying
for,
obtaining or maintaining their protection (see Article
27).
The
joint
owners
must
agree
(in
writing)
on
the
allocation
and
terms
of
exercise
of
their
joint
ownership (‘
joint ownership agreement
’), to ensure compliance with their obligations under this
Agreement.
Unless
otherwise
agreed
in
the
joint
ownership
agreement,
each
joint
owner
may
grant
non-exclusive licences
to
third
parties
to
exploit
jointly-owned
results
(without
any
right
to
sub-license),
if
the
other joint owners are
given:
(a)
at least 45 days advance notice
and
(b)
fair and reasonable
compensation.
Once the results have been generated, joint owners may agree (in writing) to apply another regime than joint ownership (such as, for instance, transfer to a single owner (see Article 30) with access rights for the others).
26.3
Rights of third parties (including
personnel)
If third parties (including personnel) may claim rights to the results, the beneficiary concerned must ensure that it complies with its obligations under the Agreement.
If a third party generates results, the beneficiary concerned must obtain all necessary rights
(transfer, licences or other) from the third
party,
in order to be able to respect its obligations as if those results were generated by the beneficiary
itself.
If
obtaining
the
rights
is
impossible,
the
beneficiary
must
refrain
from
using
the
third
party
to
generate the
results.
26.4
EU ownership, to protect
results
26.4.1
The
EU
may
—
with
the
consent
of
the
beneficiary
concerned
—
assume
ownership
of
results to protect them, if a beneficiary intends — up to four years after the period set out in Article 3 — to disseminate its results without protecting them, except in any of the following
cases:
(a)
the lack of protection is because protecting the results is not possible, reasonable or justified (given the
circumstances);
(b)
the lack of protection is because there is a lack of potential for commercial or industrial exploitation,
or
(c)
the beneficiary intends to transfer the results to another beneficiary or third party established in an EU Member State or associated country, which will protect
them.
Before the results are disseminated and unless any of the cases above under Points (a), (b) or (c) applies, the beneficiary must formally notify the Commission and at the same time inform it of any reasons
for
refusing
consent.
The
beneficiary
may
refuse
consent
only
if
it
can
show
that
its
legitimate interests would suffer significant
harm.
If the Commission decides to assume ownership, it will formally notify the beneficiary concerned within 45 days of receiving notification.
No dissemination relating to these results may take place before the end of this period or, if the Commission takes a positive decision, until it has taken the necessary steps to protect the results.
26.4.2
The
EU
may
—
with
the
consent
of
the
beneficiary
concerned
—
assume
ownership
of
results to protect them, if a beneficiary intends — up to four years after the period set out in Article 3 — to stop protecting them or not to seek an extension of protection, except in any of the following
cases:
(a)
the
protection
is
stopped
because
of
a
lack
of
potential
for
commercial
or
industrial
exploitation;
(b)
an extension would not be justified given the
circumstances.
A beneficiary that intends to stop protecting results or not seek an extension must — unless any of the cases above under Points (a) or (b) applies — formally notify the Commission at least 60 days before
the
protection
lapses
or
its
extension
is
no
longer
possible
and
at
the
same
time
inform
it
of
any reasons
for
refusing
consent.
The
beneficiary
may
refuse
consent
only
if
it
can
show
that
its
legitimate interests would suffer significant
harm.
If the Commission decides to assume ownership, it will formally notify the beneficiary concerned within 45 days of receiving notification.
26.5 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to the any of the other measures described in Chapter 6.
ARTICLE 27 — PROTECTION OF RESULTS — VISIBILITY OF EU FUNDING
27.1
Obligation to protect the
results
Each beneficiary must examine the possibility of protecting its results and must adequately protect them — for an appropriate period and with appropriate territorial coverage — if:
(a)
the results can reasonably be expected to be commercially or industrially exploited
and
(b)
protecting them is possible, reasonable and justified (given the
circumstances).
When deciding on protection, the beneficiary must consider its own legitimate interests and the legitimate interests (especially commercial) of the other beneficiaries.
27.2
EU ownership, to protect the
results
If a beneficiary intends not to protect its results, to stop protecting them or not seek an extension of protection,
the
EU
may
—
under
certain
conditions
(see
Article
26.4)
—
assume
ownership
to
ensure their (continued)
protection.
27.3
Information on EU
funding
Applications for protection of results (including patent applications) filed by or on behalf of a beneficiary must — unless the Commission requests or agrees otherwise or unless it is impossible
·
include the
following:
“The project leading to this application has received funding from the
European Union’s Horizon 2020 research and innovation programme
under grant agreement No 732064”.
27.4
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 28 — EXPLOITATION OF RESULTS
28.1
Obligation to exploit the
results
Each
beneficiary
must
—
up
to
four
years
after
the
period
set
out
in
Article
3
—
take
measures
aiming to ensure ‘
exploitation
’ of its results (either directly or indirectly, in particular through transfer or licensing; see Article 30)
by:
(a)
using them in further research activities (outside the
action);
(b)
developing, creating or marketing a product or
process;
(c)
creating and providing a service,
or
(d)
using them in standardisation
activities.
This does not change the security obligations in Article 37, which still apply.
28.2
Results that could contribute to European or international standards — Information
on EU
funding
If results are incorporated in a standard, the beneficiary concerned must — unless the Commission requests or agrees otherwise or unless it is impossible — ask the standardisation body to include the following statement in (information related to) the standard:
“Results incorporated in this standard received funding from the
European Union’s Horizon 2020 research and innovation programme
under grant agreement No 732064”.
28.3
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced in accordance with Article 43.
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 29 — DISSEMINATION OF RESULTS — OPEN ACCESS — VISIBILITY OF EU FUNDING
29.1
Obligation to disseminate
results
Unless it goes against their legitimate interests, each beneficiary must — as soon as possible — ‘
disseminate
’ its results by disclosing them to the public by appropriate means (other than those resulting from protecting or exploiting the results), including in scientific publications (in any medium).
This does not change the obligation to protect results in Article 27, the confidentiality obligations in Article
36,
the
security
obligations
in
Article
37
or
the
obligations
to
protect
personal
data
in
Article
39, all of which still
apply.
A
beneficiary
that
intends
to
disseminate
its
results
must
give
advance
notice
to
the
other
beneficiaries of — unless agreed otherwise — at least 45 days, together with sufficient information on the results it will
disseminate.
Any other beneficiary may object within — unless agreed otherwise — 30 days of receiving notification, if it can show that its legitimate interests in relation to the results or background would be
significantly
harmed.
In
such
cases,
the
dissemination
may
not
take
place
unless
appropriate
steps are taken to safeguard these legitimate
interests.
If a beneficiary intends not to protect its results, it may — under certain conditions (see Article 26.4.1)
·
need to formally notify the Commission before dissemination takes
place.
29.2
Open access to scientific
publications
Each beneficiary must ensure open access (free of charge online access for any user) to all peer-reviewed scientific publications relating to its results.
In particular, it must:
(a)
as soon as possible and at the latest on publication, deposit a machine-readable electronic copy of the published version or final peer-reviewed manuscript accepted for publication in a repository for scientific
publications;
Moreover, the beneficiary must aim to deposit at the same time the research data needed to validate the results presented in the deposited scientific publications.
(b)
ensure open access to the deposited publication — via the repository — at the
latest:
(i)
on publication, if an electronic version is available for free via the publisher,
or
(ii)
within six months of publication (twelve months for publications in the social sciences and humanities) in any other
case.
(c)
ensure open access — via the repository — to the bibliographic metadata that identify the deposited
publication.
The bibliographic metadata must be in a standard format and must include all of the following:
·
the terms “European Union (EU)” and “Horizon
2020”;
·
the name of the action, acronym and grant
number;
·
the publication date, and length of embargo period if applicable,
and
·
a persistent
identifier.
29.3
Open access to research
data
Regarding the digital research data generated in the action (‘
data
’), the beneficiaries must:
(a)
deposit in a research data repository and take measures to make it possible for third parties to access,
mine,
exploit,
reproduce
and
disseminate
—
free
of
charge
for
any
user
—
the
following:
(i)
the data, including associated metadata, needed to validate the results presented in scientific publications as soon as
possible;
(ii)
other
data,
including
associated
metadata,
as
specified
and
within
the
deadlines
laid
down in the 'data management plan' (see Annex
1);
(b)
provide information — via the repository — about tools and instruments at the disposal of
the beneficiaries and necessary for validating the results (and — where possible — provide the tools and instruments
themselves).
This does not change the obligation to protect results in Article 27, the confidentiality obligations in Article
36,
the
security
obligations
in
Article
37
or
the
obligations
to
protect
personal
data
in
Article
39, all of which still
apply.
As
an
exception,
the
beneficiaries
do
not
have
to
ensure
open
access
to
specific
parts
of
their
research data
if
the
achievement
of
the
action's
main
objective,
as
described
in
Annex
1,
would
be
jeopardised by
making
those
specific
parts
of
the
research
data
openly
accessible.
In
this
case,
the
data
management plan must contain the reasons for not giving
access.
29.4
Information on EU funding — Obligation and right to use the EU
emblem
Unless the Commission requests or agrees otherwise or unless it is impossible, any dissemination of results (in any form, including electronic) must:
(a)
display the EU emblem
and
(b)
include the following
text:
“This
project
has
received
funding
from
the
European
Union’s
Horizon
2020
research
and
innovation programme
under grant agreement No
732064”.
When displayed together with another logo, the EU emblem must have appropriate prominence.
For the purposes of their obligations under this Article, the beneficiaries may use the EU emblem without first obtaining approval from the Commission.
This does not however give them the right to exclusive use.
Moreover, they may not appropriate the EU emblem or any similar trademark or logo, either by registration or by any other means.
29.5
Disclaimer excluding Commission
responsibility
Any dissemination of results must indicate that it reflects only the author's view and that the Commission is not responsible for any use that may be made of the information it contains.
29.6
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 30 — TRANSFER AND LICENSING OF RESULTS
30.1
Transfer
of
ownership
Each beneficiary may transfer ownership of its results.
It must however ensure that its obligations under Articles 26.2, 26.4, 27, 28, 29, 30 and 31 also apply to the new owner and that this owner has the obligation to pass them on in any subsequent transfer.
This does not change the security obligations in Article 37, which still apply.
Unless
agreed
otherwise
(in
writing)
for
specifically-identified
third
parties
or
unless
impossible
under applicable EU and national laws on mergers and acquisitions, a beneficiary that intends to transfer ownership of results must give at least 45 days advance notice (or less if agreed in writing) to the other beneficiaries that still have (or still may request) access rights to the results. This
notification
50
must include sufficient information on the new owner to enable any beneficiary concerned to assess the effects on its access rights.
Unless agreed otherwise (in writing) for specifically-identified third parties, any other beneficiary may object within 30 days of receiving notification (or less if agreed in writing), if it can show that the
transfer
would
adversely
affect
its
access
rights.
In
this
case,
the
transfer
may
not
take
place
until agreement has been reached between the beneficiaries
concerned.
30.2
Granting
licenses
Each beneficiary may grant licences to its results (or otherwise give the right to exploit them), if:
(a)
this does not impede the rights under Article 31
and
(b)
not
applicable.
In addition to Points (a) and (b), exclusive licences for results may be granted only if all the other beneficiaries concerned have waived their access rights (see Article 31.1).
This
does
not
change
the
dissemination
obligations
in
Article
29
or
security
obligations
in
Article
37, which still
apply.
30.3
Commission right to object to transfers or
licensing
The Commission may — up to four years after the period set out in Article 3 — object to a transfer of ownership or the exclusive licensing of results, if:
(a)
it is to a third party established in a non-EU country not associated with Horizon 2020
and
(b)
the
Commission
considers
that
the
transfer
or
licence
is
not
in
line
with
EU
interests
regarding competitiveness or is inconsistent with ethical principles or security
considerations.
A
beneficiary
that
intends
to
transfer
ownership
or
grant
an
exclusive
licence
must
formally
notify
the Commission before the intended transfer or licensing takes place
and:
·
identify the specific results
concerned;
·
describe in detail the new owner or licensee and the planned or potential exploitation of the results,
and
·
include a reasoned assessment of the likely impact of the transfer or licence on EU competitiveness and its consistency with ethical principles and security
considerations.
The Commission may request additional information.
If the Commission decides to object to a transfer or exclusive licence, it must formally notify the beneficiary concerned within 60 days of receiving notification (or any additional information it has requested).
No transfer or licensing may take place in the following cases:
·
pending the Commission decision, within the period set out
above;
·
if the Commission
objects;
59
·
until the conditions are complied with, if the Commission objection comes with
conditions.
30.4
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 31 — ACCESS RIGHTS TO RESULTS
31.1
Exercise of access rights — Waiving of access rights — No
sub-licensing
The conditions set out in Article 25.1 apply.
The obligations set out in this Article do not change the security obligations in Article 37, which still apply.
31.2
Access rights for other beneficiaries, for implementing their own tasks under the
action
The beneficiaries must give each other access — on a royalty-free basis — to results needed for implementing their own tasks under the action.
31.3
Access rights for other beneficiaries, for exploiting their own
results
The beneficiaries must give each other — under fair and reasonable conditions (see Article 25.3) — access to results needed for exploiting their own results.
Requests for access may be made — unless agreed otherwise — up to one year after the period set out in Article 3.
31.4
Access rights of affiliated
entities
Unless agreed otherwise in the consortium agreement, access to results must also be given — under fair and reasonable conditions (Article 25.3) — to affiliated entities established in an EU Member State or associated country, if this is needed for those entities to exploit the results generated by the beneficiaries to which they are affiliated.
Unless
agreed
otherwise
(see
above;
Article
31.1),
the
affiliated
entity
concerned
must
make
any
such request directly to the beneficiary that owns the
results.
Requests for access may be made — unless agreed otherwise — up to one year after the period set out in Article 3.
31.5
Access rights for the EU institutions, bodies, offices or agencies and EU Member
States
The beneficiaries must give access to their results — on a royalty-free basis — to EU institutions, bodies, offices or agencies, for developing, implementing or monitoring EU policies or programmes.
Such access rights are limited to non-commercial and non-competitive use.
This does not change the right to use any material, document or information received from the beneficiaries for communication and publicising activities (see Article 38.2).
31.6
Access rights for third
parties
Not applicable
31.7
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
SECTION 4 OTHER RIGHTS AND OBLIGATIONS
ARTICLE 32 — RECRUITMENT AND WORKING CONDITIONS FOR RESEARCHERS
32.1
Obligation to take measures to implement the European Charter for Researchers
and Code of Conduct for the Recruitment of
Researchers
The beneficiaries must take all measures to implement the principles set out in the Commission Recommendation on the European Charter for Researchers and the Code of Conduct for the Recruitment of Researchers
21
, in particular regarding:
·
working
conditions;
·
transparent recruitment processes based on merit,
and
·
career
development.
The beneficiaries must ensure that researchers and third parties involved in the action are aware of them.
32.2
Consequences of
non-compliance
If a beneficiary breaches its obligations under this Article, the Commission may apply any of the measures described in Chapter 6.
ARTICLE 33 — GENDER EQUALITY
33.1
Obligation to aim for gender
equality
The beneficiaries must take all measures to promote equal opportunities between men and women
in the implementation of the action. They must aim, to the extent possible, for a gender balance at all levels of personnel assigned to the action, including at supervisory and managerial
level.
33.2
Consequences of
non-compliance
If a beneficiary breaches its obligations under this Article, the Commission may apply any of the measures described in Chapter 6.
21
Commission
Recommendation
2005/251/EC
of
11
March
2005
on
the
European
Charter
for
Researchers
and
on
a
Code of Conduct for the Recruitment of Researchers (OJ L 75, 22.3.2005, p.
67).
ARTICLE 34 — ETHICS AND RESEARCH INTEGRITY
34.1
Obligation to comply with ethical principles and research
integrity
The beneficiaries must carry out the action in compliance with:
(a)
ethical principles (including the highest standards of research
integrity) and
(b)
applicable international, EU and national
law.
Funding will not be granted for activities carried out outside the EU if they are prohibited in all Member
States
or
for
activities
which
destroy
human
embryos
(for
example,
for
obtaining
stem
cells).
The beneficiaries must ensure that the activities under the action have an exclusive focus on civil applications.
The beneficiaries must ensure that the activities under the action do not:
(a)
aim at human cloning for reproductive
purposes;
(b)
intend
to
modify
the
genetic
heritage
of
human
beings
which
could
make
such
changes
heritable (with the exception of research relating to cancer treatment of the gonads, which may be financed),
or
(c)
intend to create human embryos solely for the purpose of research or for the purpose of stem cell procurement, including by means of somatic cell nuclear
transfer.
The beneficiaries must respect the highest standards of research integrity — as set out, for instance, in the European Code of Conduct for Research Integrity
22
.
This implies notably compliance with the following essential principles:
·
honesty;
·
reliability;
·
objectivity;
·
impartiality;
·
open
communication;
·
duty of
care;
·
fairness
and
·
responsibility for future science
generations.
22
European Code of Conduct for Research Integrity of ALLEA (All European Academies) and ESF (European Science Foundation) of March 2011.
http://www.esf.org/fileadmin/Public_documents/Publications/Code_Conduct_ResearchIntegrity.pdf
This means that beneficiaries must ensure that persons carrying out research tasks:
·
present their research goals and intentions in an honest and transparent
manner;
·
design
their
research
carefully
and
conduct
it
in
a
reliable
fashion,
taking
its
impact
on
society into
account;
·
use techniques and methodologies (including for data collection and management) that are appropriate for the field(s)
concerned;
·
exercise due care for the subjects of research — be they human beings, animals, the environment or cultural
objects;
·
ensure objectivity, accuracy and impartiality when disseminating the
results;
·
allow — in addition to the open access obligations under Article 29.3 as much as possible
and taking into account the legitimate interest of the beneficiaries — access to research data, in order to enable research to be
reproduced;
·
make the necessary references to their work and that of other
researchers;
·
refrain from practicing any form of plagiarism, data falsification or
fabrication;
·
avoid
double
funding,
conflicts
of
interest
and
misrepresentation
of
credentials
or
other
research misconduct.
34.2
Activities raising ethical
issues
Activities raising ethical issues must comply with the ‘
ethics requirements
’ set out as deliverables in Annex 1.
Before the beginning of an activity raising an ethical issue, each beneficiary must have obtained:
(a)
any ethics committee opinion required under national law
and
(b)
any
notification
or
authorisation
for
activities
raising
ethical
issues
required
under
national
and/ or European
law
needed for implementing the action tasks in question.
The documents must be kept on file and be submitted upon request by the coordinator to the Commission (see Article 52). If they are not in English, they must be submitted together with an English summary, which shows that the action tasks in question are covered and includes the conclusions of the committee or authority concerned (if
available).
34.3
Activities involving human embryos or human embryonic stem
cells
Activities involving research on human embryos or human embryonic stem cells may be carried out, in addition to Article 34.1, only if:
·
they are set out in Annex 1
or
·
the coordinator has obtained explicit approval (in writing) from the Commission (see Article
52).
34.4
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43) and the Agreement or participation of the beneficiary may be terminated (see Article 50).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 35 — CONFLICT OF INTERESTS
35.1
Obligation to avoid a conflict of
interests
The beneficiaries must take all measures to prevent any situation where the impartial and objective implementation of the action is compromised for reasons involving economic interest, political or national affinity, family or emotional ties or any other shared interest (‘
conflict of interests
’).
They must formally notify to the Commission without delay any situation constituting or likely to lead to a conflict of interests and immediately take all the necessary steps to rectify this situation.
The Commission may verify that the measures taken are appropriate and may require additional measures to be taken by a specified deadline.
35.2
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43) and the Agreement or participation of the beneficiary may be terminated (see Article 50).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 36 — CONFIDENTIALITY
36.1
General obligation to maintain
confidentiality
During implementation of the action and for four years after the period set out in Article 3, the parties must keep confidential any data, documents or other material (in any form) that is identified as confidential at the time it is disclosed (‘
confidential information
’).
If a beneficiary requests, the Commission may agree to keep such information confidential for an additional period beyond the initial four years.
If information has been identified as confidential only orally, it will be considered to be confidential only if this is confirmed in writing within 15 days of the oral disclosure.
Unless
otherwise
agreed
between
the
parties,
they
may
use
confidential
information
only
to
implement the
Agreement.
The beneficiaries may disclose confidential information to their personnel or third parties involved in the action only if they:
(a)
need to know to implement the Agreement
and
(b)
are bound by an obligation of
confidentiality.
This does not change the security obligations in Article 37, which still apply.
The Commission may disclose confidential information to its staff, other EU institutions and bodies. It may disclose confidential information to third parties, if:
(a)
this is necessary to implement the Agreement or safeguard the EU's financial interests
and
(b)
the recipients of the information are bound by an obligation of
confidentiality.
Under the conditions set out in Article 4 of the Rules for Participation Regulation No 1290/2013
23
, the Commission must moreover make available information on the results to other EU institutions, bodies, offices or agencies as well as Member States or associated countries.
The confidentiality obligations no longer apply if:
(a)
the disclosing party agrees to release the other
party;
(b)
the information was already known by the recipient or is given to him without obligation of confidentiality by a third party that was not bound by any obligation of
confidentiality;
(c)
the recipient proves that the information was developed without the use of confidential information;
(d)
the information becomes generally and publicly available, without breaching any confidentiality obligation,
or
(e)
the disclosure of the information is required by EU or national
law.
36.2
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 37 — SECURITY-RELATED OBLIGATIONS
37.1
Results with a security
recommendation
Not applicable
37.2
Classified
information
Not applicable
37.3
Activities involving dual-use goods or dangerous materials and
substances
Not applicable
37.4
Consequences of
non-compliance
Not applicable
23
Regulation (EU) No 1290/2013 of the European Parliament and of the Council of 11 December 2013 laying down the rules for participation and dissemination in "Horizon 2020 - the Framework Programme for Research and Innovation (2014-2020)" (OJ L 347, 20.12.2013 p.81).
ARTICLE 38 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING
38.1
Communication activities by
beneficiaries
38.1.1
Obligation to promote the action and its
results
The
beneficiaries
must
promote
the
action
and
its
results,
by
providing
targeted
information
to
multiple audiences (including the media and the public) in a strategic and effective
manner.
This does not change the dissemination obligations in Article 29, the confidentiality obligations in Article 36 or the security obligations in Article 37, all of which still apply.
Before
engaging
in
a
communication
activity
expected
to
have
a
major
media
impact,
the
beneficiaries must inform the Commission (see Article
52).
38.1.2
Information on EU funding — Obligation and right to use the EU
emblem
Unless the Commission requests or agrees otherwise or unless it is impossible, any communication activity related to the action (including in electronic form, via social media, etc.) and any infrastructure, equipment and major results funded by the grant must:
(a)
display the EU emblem
and
(b)
include the following
text:
For communication activities:
“This project has received funding from the
European Union’s Horizon 2020 research and innovation programme
under grant agreement No 732064”.
For infrastructure, equipment and major results:
“This [infrastructure][equipment][insert type of result] is part of a project that has received funding from the
European Union’s Horizon 2020 research and innovation programme
under grant agreement No 732064”.
When displayed together with another logo, the EU emblem must have appropriate prominence.
For the purposes of their obligations under this Article, the beneficiaries may use the EU emblem without first obtaining approval from the Commission.
This does not, however, give them the right to exclusive use.
Moreover, they may not appropriate the EU emblem or any similar trademark or logo, either by registration or by any other means.
38.1.3
Disclaimer excluding Commission
responsibility
Any communication activity related to the action must indicate that it reflects only the author's view and
that
the
Commission
is
not
responsible
for
any
use
that
may
be
made
of
the
information
it
contains.
38.2
Communication activities by the
Commission
38.2.1 Right to use beneficiaries’ materials, documents or information
The Commission may use, for its communication and publicising activities, information relating to the action, documents notably summaries for publication and public deliverables as well as any other material, such as pictures or audio-visual material received from any beneficiary (including in electronic
form).
This does not change the confidentiality obligations in Article 36 and the security obligations in Article 37, all of which still apply.
If the Commission’s use of these materials, documents or information would risk compromising legitimate interests, the beneficiary concerned may request the Commission not to use it (see Article
52).
The right to use a beneficiary’s materials, documents and information includes:
(a)
use for its own purposes
(in particular, making them available to persons working for the Commission or any other EU institution,
body,
office or agency or body or institutions in EU Member States; and copying or reproducing them in whole or in part, in unlimited
numbers);
(b)
distribution
to
the
public
(in
particular,
publication
as
hard
copies
and
in
electronic
or
digital format, publication on the internet, as a downloadable or non-downloadable file,
broadcasting by any channel, public display or presentation, communicating through press information services, or inclusion in widely accessible databases or
indexes);
(c)
editing or redrafting
for communication and publicising activities (including shortening, summarising,
inserting
other
elements
(such
as
meta-data,
legends,
other
graphic,
visual,
audio or text elements), extracting parts (e.g. audio or video files), dividing into parts, use in a compilation);
(d)
translation
;
(e)
giving
access in response to individual requests
under Regulation No 1049/2001
25
, without the right to reproduce or
exploit;
(f)
storage
in paper, electronic or other
form;
(g)
archiving
, in line with applicable document-management rules,
and
(h)
the right to authorise third parties to act on its behalf or sub-license the modes of use set out in Points (b), (c), (d) and (f) to third parties if needed for the communication and publicising activities of the
Commission.
If the right of use is subject to rights of a third party (including personnel of the beneficiary), the beneficiary must ensure that it complies with its obligations under this Agreement (in particular, by obtaining the necessary approval from the third parties concerned).
Where applicable (and if provided by the beneficiaries), the Commission will insert the following information:
“© – [year] – [name of the copyright owner]. All rights reserved. Licensed to the European Union (EU) under conditions.”
38.3
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 43).
25
Regulation (EC) No 1049/2001 of the European Parliament and of the Council of 30 May 2001 regarding public access to European Parliament, Council and Commission documents, OJ L 145, 31.5.2001, p. 43.
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 39 — PROCESSING OF PERSONAL DATA
39.1
Processing of personal data by the
Commission
Any personal data under the Agreement will be processed by the Commission under Regulation No 45/2001
26
and according to the ‘notifications of the processing operations’ to the Data Protection Officer (DPO) of the Commission (publicly accessible in the DPO
register).
Such data will be processed by the ‘
data controller
’ of the Commission for the purposes of implementing, managing and monitoring the Agreement or protecting the financial interests of the EU or Euratom (including checks, reviews, audits and investigations; see Article 22).
The
persons
whose
personal
data
are
processed
have
the
right
to
access
and
correct
their
own
personal data. For this purpose, they must send any queries about the processing of their personal data to the data controller, via the contact point indicated in the privacy statement(s) that are published on the Commission
websites.
They also have the right to have recourse at any time to the European Data Protection Supervisor (EDPS).
39.2
Processing of personal data by the
beneficiaries
The
beneficiaries
must
process
personal
data
under
the
Agreement
in
compliance
with
applicable
EU and national law on data protection (including authorisations or notification
requirements).
The beneficiaries may grant their personnel access only to data that is strictly necessary for implementing, managing and monitoring the Agreement.
The beneficiaries must inform the personnel whose personal data are collected and processed by the Commission. For this purpose, they must provide them with the privacy statement(s) (see above), before transmitting their data to the Commission.
39.3
Consequences of
non-compliance
If a beneficiary breaches any of its obligations under Article 39.2, the Commission may apply any
of the measures described in Chapter
6.
ARTICLE 40 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE COMMISSION
The beneficiaries may not assign any of their claims for payment against the Commission to any third party, except if approved by the Commission on the basis of a reasoned, written request by the coordinator (on behalf of the beneficiary concerned).
If
the
Commission
has
not
accepted
the
assignment
or
the
terms
of
it
are
not
observed,
the
assignment will have no effect on
it.
26
Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December 2000 on the protection of individuals with regard to the processing of personal data by the Community institutions and bodies and on the
free movement of such data (OJ L 8, 12.01.2001, p.
1).
60
In no circumstances will an assignment release the beneficiaries from their obligations towards the Commission.
CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES
— RELATIONSHIP WITH COMPLEMENTARY BENEFICIARIES — RELATIONSHIP WITH PARTNERS OF A JOINT ACTION
ARTICLE 41 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES
— RELATIONSHIP WITH COMPLEMENTARY BENEFICIARIES — RELATIONSHIP WITH PARTNERS OF A JOINT ACTION
41.1
Roles and responsibilities towards the
Commission
The beneficiaries have full responsibility for implementing the action and complying with the Agreement.
The beneficiaries are jointly and severally liable for the
technical implementation
of the action as described
in
Annex
1.
If
a
beneficiary
fails
to
implement
its
part
of
the
action,
the
other
beneficiaries become responsible for implementing this part (without being entitled to any additional EU funding for doing so), unless the Commission expressly relieves them of this
obligation.
The
financial responsibility
of each beneficiary is governed by Articles 44, 45 and 46.
41.2
Internal division of roles and
responsibilities
The internal roles and responsibilities of the beneficiaries are divided as follows:
(a)
Each
beneficiary
must:
(i)
keep information stored in the Participant Portal Beneficiary Register (via the electronic exchange system) up to date (see Article
17);
(ii)
inform the coordinator immediately of any events or circumstances likely to affect significantly or delay the implementation of the action (see Article
17);
(iii)
submit to the coordinator in good
time:
·
individual financial statements for itself and its linked third parties and, if required, certificates on the financial statements (see Article
20);
·
the data needed to draw up the technical reports (see Article
20);
·
ethics
committee
opinions
and
notifications
or
authorisations
for
activities
raising
ethical issues (see Article
34);
·
any other documents or information required by the Commission under the Agreement, unless the Agreement requires the beneficiary to submit this information directly to the Commission.
(b)
The
coordinator
must:
(i)
monitor that the action is implemented properly (see Article
7);
69
(ii)
act
as
the
intermediary
for
all
communications
between
the
beneficiaries
and
the
Commission (in
particular,
providing
the
Commission
with
the
information
described
in
Article
17),
unless the Agreement specifies
otherwise;
(iii)
request and review any documents or information required by the Commission and verify their completeness and correctness before passing them on to the
Commission;
(iv)
submit the deliverables and reports to the Commission (see Articles 19 and
20);
(v)
ensure that all payments are made to the other beneficiaries without unjustified delay (see Article
21);
(vi)
inform the Commission of the amounts paid to each beneficiary, when required under the Agreement (see Articles 44 and 50) or requested by the
Commission.
The coordinator may not delegate or subcontract the above-mentioned tasks to any other beneficiary or third party (including linked third parties).
41.3
Internal arrangements between beneficiaries — Consortium
agreement
The beneficiaries must have internal arrangements regarding their operation and co-ordination to ensure
that
the
action
is
implemented
properly.
These
internal
arrangements
must
be
set
out
in
a
written ‘
consortium agreement
’ between the beneficiaries, which may
cover:
·
internal organisation of the
consortium;
·
management of access to the electronic exchange
system;
·
distribution of EU
funding;
·
additional
rules
on
rights
and
obligations
related
to
background
and
results
(including
whether access rights remain or not, if a beneficiary is in breach of its obligations) (see Section 3 of Chapter
4);
·
settlement of internal
disputes;
·
liability, indemnification and confidentiality arrangements between the
beneficiaries.
The consortium agreement must not contain any provision contrary to the Agreement.
41.4
Relationship with complementary beneficiaries — Collaboration
agreement
Not applicable
41.5
Relationship with partners of a joint action — Coordination
agreement
Not applicable
CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY
·
SANCTIONS — DAMAGES — SUSPENSION — TERMINATION — FORCE
MAJEURE
SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY
·
SANCTIONS
ARTICLE 42 — REJECTION OF INELIGIBLE COSTS
42.1
Conditions
The Commission will — at the time of an
interim payment
, after
termination of the participation of a beneficiary
, at the time of an
interim payment
,
at the payment of the balance
or
afterwards
·
reject
any
costs
which
are
ineligible
(see
Article
6),
in
particular
following
checks,
reviews,
audits or investigations (see Article
22).
The rejection may also be based on the
extension of findings from other grants to this grant
(see Article 22.5.2).
42.2
Ineligible costs to be rejected — Calculation —
Procedure
Ineligible costs will be rejected in full.
If the rejection of costs does not lead to a recovery (see Article 44), the Commission will formally notify
the
coordinator
or
beneficiary
concerned
of
the
rejection
of
costs,
the
amounts
and
the
reasons why (if applicable, together with the notification of amounts due; see Article 21.5). The coordinator or beneficiary concerned may — within 30 days of receiving notification — formally notify the Commission of its disagreement and the reasons
why.
If the rejection of costs leads to a recovery, the Commission will follow the contradictory procedure with pre-information letter set out in Article 44.
42.3
Effects
If
the
Commission
rejects
costs
at
the
time
of
an
interim
payment
or
the
payment
of
the
balance
,
it will
deduct
them
from
the
total
eligible
costs
declared,
for
the
action,
in
the
periodic
or
final
summary financial
statement
(see
Articles
20.3
and
20.4).
It
will
then
calculate
the
interim
payment
or
payment of the balance as set out in Articles 21.3 or
21.4.
If
the
Commission
rejects
costs
after
termination
of
the
participation
of
a
beneficiary
,
it
will
deduct them from the costs declared by the beneficiary in the termination report and include the rejection in the calculation after termination (see Article 50.2 and
50.3).
If the Commission —
after an interim payment but before the payment of the balance
—
rejects costs declared in a periodic summary financial statement, it will deduct them from the total eligible costs
declared,
for
the
action,
in
the
next
periodic
summary
financial
statement
or
in
the
final
summary financial statement. It will then calculate the interim payment or payment of the balance as set out in Articles 21.3 or
21.4.
If
the
Commission
rejects
costs
after
the
payment
of
the
balance
,
it
will
deduct
the
amount
rejected from the total eligible costs declared, by the beneficiary, in the final summary financial statement. It will then calculate the revised final grant amount as set out in Article
5.4.
ARTICLE 43 — REDUCTION OF THE GRANT
43.1
Conditions
The Commission may —
after termination of the participation of a beneficiary
,
at the payment of the balance
or
afterwards
— reduce the grant amount (see Article 5.1), if :
(a)
a
beneficiary
(or
a
natural
person
who
has
the
power
to
represent
or
take
decisions
on
its
behalf) has
committed:
(i)
substantial errors, irregularities or fraud
or
(ii)
serious breach of obligations under the Agreement or during the award procedure (including
improper
implementation
of
the
action,
submission
of
false
information,
failure to provide required information, breach of ethical principles)
or
(b)
a
beneficiary
(or
a
natural
person
who
has
the
power
to
represent
or
take
decision
on
its
behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (
extension of findings from other grants to this grant
; see Article
22.5.2).
43.2
Amount to be reduced — Calculation —
Procedure
The amount of the reduction will be proportionate to the seriousness of the errors, irregularities or fraud or breach of obligations.
Before
reduction
of
the
grant,
the
Commission
will
formally
notify
a
‘
pre-information
letter
’
to
the coordinator or beneficiary
concerned:
·
informing
it
of
its
intention
to
reduce
the
grant,
the
amount
it
intends
to
reduce
and
the
reasons why
and
·
inviting it to submit observations within 30 days of receiving
notification
If the Commission does not receive any observations or decides to pursue reduction despite the observations it has received, it will formally notify
confirmation
of the reduction (if applicable, together with the notification of amounts due; see Article 21).
43.3
Effects
If
the
Commission
reduces
the
grant
after
termination
of
the
participation
of
a
beneficiary
,
it
will calculate the reduced grant amount for that beneficiary and then determine the amount due to that beneficiary (see Article 50.2 and
50.3).
If
the
Commission
reduces
the
grant
at
the
payment
of
the
balance
,
it
will
calculate
the
reduced
grant amount
for
the
action
and
then
determine
the
amount
due
as
payment
of
the
balance
(see
Articles
5.3.4 and
21.4).
If the Commission reduces the grant
after the payment of the balance
, it will calculate the revised final grant amount for the beneficiary concerned (see Article 5.4). If the revised final grant amount for the beneficiary concerned is lower than its share of the final grant amount, the Commission will recover the difference (see Article 44).
ARTICLE 44 — RECOVERY OF UNDUE AMOUNTS
44.1
Amount to be recovered — Calculation —
Procedure
The Commission will — after
termination of the participation of a beneficiary, at the payment of the balance
or
afterwards
— claim back any amount that was paid but is not due under the Agreement.
Each beneficiary’s financial responsibility in case of recovery is limited to its own debt (including undue amounts paid by the Commission for costs declared by its linked third parties), except for the amount retained for the Guarantee Fund (see Article 21.4).
44.1.1 Recovery after termination of a beneficiary’s participation
If
recovery
takes
place
after
termination
of
a
beneficiary’s
participation
(including
the
coordinator),
the Commission
will
claim
back
the
undue
amount
from
the
beneficiary
concerned,
by
formally
notifying it
a
debit
note
(see
Article
50.2
and
50.3).
This
note
will
specify
the
amount
to
be
recovered,
the
terms and the date for
payment.
If payment is not made by the date specified in the debit note, the Commission will
recover
the amount:
(a)
by ‘
offsetting
’ it — without the beneficiary’s consent — against any amounts owed to the beneficiary concerned by the Commission or an executive agency (from the EU or Euratom budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Commission may offset before the payment date specified in the debit note;
(b)
not
applicable;
(c)
by
taking legal action
(see Article 57) or by
adopting an enforceable decision
under Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the Financial regulation No
966/2012.
If
payment
is
not
made
by
the
date
specified
in
the
debit
note,
the
amount
to
be
recovered
(see
above) will
be
increased
by
late-payment
interest
at
the
rate
set
out
in
Article
21.11,
from
the
day
following the
payment
date
in
the
debit
note,
up
to
and
including
the
date
the
Commission
receives
full
payment of the
amount.
Partial payments will be first credited against expenses, charges and late-payment interest and then against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless Directive 2007/64/EC
27
applies.
44.1.2
Recovery at payment of the
balance
If the payment of the balance takes the form of a recovery (see Article 21.4), the Commission will formally notify a ‘
pre-information letter
’ to the coordinator:
27
Directive 2007/64/EC of the European Parliament and of the Council of 13 November 2007 on payment services in the internal market amending Directives 97/7/EC, 2002/65/EC, 2005/60/EC and 2006/48/EC and repealing Directive 97/5/EC (OJ L 319, 05.12.2007, p.
1).
·
informing it of its intention to recover, the amount due as the balance and the reasons
why;
·
specifying that it intends to deduct the amount to be recovered from the amount retained for the Guarantee
Fund;
·
requesting
the
coordinator
to
submit
a
report
on
the
distribution
of
payments
to
the
beneficiaries within 30 days of receiving notification,
and
·
inviting the coordinator to submit observations within 30 days of receiving
notification.
If no observations are submitted or the Commission decides to pursue recovery despite the observations
it
has
received,
it
will
confirm
recovery
(together
with
the
notification
of
amounts
due; see Article 21.5)
and:
·
pay the difference between the amount to be recovered and the amount retained for the Guarantee Fund,
if the difference is positive
or
·
formally notify to the coordinator a
debit note
for the difference between the amount to be recovered and the amount retained for the Guarantee Fund,
if the difference is negative
.
This note will also specify the terms and the date for
payment.
If the coordinator does not repay the Commission by the date in the debit note and has not
submitted the report on the distribution of payments: the Commission will
recover
the amount set out in the debit note from the coordinator (see
below).
If the coordinator does not repay the Commission by the date in the debit note, but has submitted
the report on the distribution of payments: the Commission
will:
(a)
identify the beneficiaries for which the amount calculated as follows is
negative:
{
{
{
{beneficiary’s costs declared in the final summary financial statement and approved by the Commission multiplied by the reimbursement rate set out in Article 5.2 for the beneficiary concerned
plus
its linked third parties’ costs declared in the final summary financial statement and approved by the Commission multiplied by the reimbursement rate set out in Article 5.2 for each linked third party concerned}
divided by
the EU contribution for the action calculated according to Article 5.3.1
}
multiplied by
the final grant amount (see Article 5.3)
}
, minus
{pre-financing and interim payments received by the beneficiary}
}
.
(b)
formally
notify
to
each
beneficiary
identified
according
to
point
(a)
a
debit
note
specifying
the terms and date for payment. The amount of the debit note is calculated as
follows:
{
{amount calculated according to point (a) for the beneficiary concerned divided by
the
sum
of
the
amounts
calculated
according
to
point
(a)
for
all
the
beneficiaries
identified
according to point
(a)}
multiplied by
the amount set out in the debit note formally notified to the coordinator}.
If payment is not made by the date specified in the debit note, the Commission will
recover
the amount:
(a)
by ‘
offsetting
’ it — without the beneficiary’s consent — against any amounts owed to the beneficiary concerned by the Commission or an executive agency (from the EU or Euratom budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Commission may offset before the payment date specified in the debit note;
(b)
by
drawing on the Guarantee Fund
. The Commission will formally notify the beneficiary concerned the debit note on behalf of the Guarantee Fund and recover the
amount:
(i)
not
applicable;
(ii)
by
taking legal action
(see Article 57) or by
adopting an enforceable decision
under Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the Financial Regulation No
966/2012.
If payment is not made by the date in the debit note, the amount to be recovered (see above) will be increased by
late-payment interest
at the rate set out in Article 21.11, from the day following the payment date in the debit note, up to and including the date the Commission receives full payment of the
amount.
Partial payments will be first credited against expenses, charges and late-payment interest and then against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless Directive 2007/64/EC
applies.
44.1.3
Recovery of amounts after payment of the
balance
If,
for
a
beneficiary,
the
revised
final
grant
amount
(see
Article
5.4)
is
lower
than
its
share
of
the
final grant amount, it must repay the difference to the
Commission.
The beneficiary’s share of the final grant amount is calculated as follows:
{
{
{beneficiary’s costs declared in the final summary financial statement and approved by the Commission multiplied by the reimbursement rate set out in Article 5.2 for the beneficiary concerned
plus
its linked third parties’ costs declared in the final summary financial statement and approved by the Commission multiplied by the reimbursement rate set out in Article 5.2 for each linked third party concerned}
divided by
the EU contribution for the action calculated according to Article 5.3.1
}
multiplied by
the final grant amount (see Article 5.3)
}
.
If the coordinator has not distributed amounts received (see Article 21.7), the Commission will also recover these amounts.
The Commission will formally notify a
pre-information letter
to the beneficiary concerned:
·
informing it of its intention to recover, the due amount and the reasons why
and
·
inviting it to submit observations within 30 days of receiving
notification.
If no observations are submitted or the Commission decides to pursue recovery despite the observations it has received, it will
confirm
the amount to be recovered and formally notify to the beneficiary concerned a
debit note
. This note will also specify the terms and the date for payment.
If payment is not made by the date specified in the debit note, the Commission will
recover
the amount:
(a)
by ‘
offsetting
’ it — without the beneficiary’s consent — against any amounts owed to the beneficiary concerned by the Commission or an executive agency (from the EU or Euratom budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Commission may offset before the payment date specified in the debit note;
(b)
by
drawing on the Guarantee Fund
. The Commission will formally notify the beneficiary concerned the debit note on behalf of the Guarantee Fund and recover the
amount:
(i)
not
applicable;
(ii)
by
taking legal action
(see Article 57) or by
adopting an enforceable decision
under Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the Financial Regulation No
966/2012.
If payment is not made by the date in the debit note, the amount to be recovered (see above) will be increased by
late-payment interest
at the rate set out in Article 21.11, from the day following the date
for
payment
in
the
debit
note,
up
to
and
including
the
date
the
Commission
receives
full
payment of the
amount.
Partial payments will be first credited against expenses, charges and late-payment interest and then against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless Directive 2007/64/EC
applies.
ARTICLE 45 — ADMINISTRATIVE SANCTIONS
In addition to contractual measures, the Commission may also adopt administrative sanctions under Articles 106 and 131(4) of the Financial Regulation No 966/2012 (i.e. exclusion from future procurement contracts, grants and expert contracts and/or financial penalties).
SECTION 2 LIABILITY FOR DAMAGES
ARTICLE 46 — LIABILITY FOR DAMAGES
46.1
Liability of the
Commission
The Commission cannot be held liable for any damage caused to the beneficiaries or to third parties as a consequence of implementing the Agreement, including for gross negligence.
The Commission cannot be held liable for any damage caused by any of the beneficiaries or third parties involved in the action, as a consequence of implementing the Agreement.
46.2
Liability of the
beneficiaries
Except in case of force majeure (see Article 51), the beneficiaries must compensate the Commission for any damage it sustains as a result of the implementation of the action or because the action was not implemented in full compliance with the Agreement.
SECTION 3 SUSPENSION AND TERMINATION
ARTICLE 47 — SUSPENSION OF PAYMENT DEADLINE
47.1
Conditions
The Commission may — at any moment — suspend the payment deadline (see Article 21.2 to 21.4) if a request for payment (see Article 20) cannot be approved because:
(a)
it does not comply with the provisions of the Agreement (see Article
20);
(b)
the technical or financial reports have not been submitted or are not complete or additional information is needed,
or
(c)
there
is
doubt
about
the
eligibility
of
the
costs
declared
in
the
financial
statements
and
additional checks, reviews, audits or investigations are
necessary.
47.2
Procedure
The Commission will formally notify the coordinator of the suspension and the reasons why. The suspension will
take effect
the day notification is sent by the Commission (see Article 52).
If the conditions for suspending the payment deadline are no longer met, the suspension will be
lifted
·
and the remaining period will
resume.
If
the
suspension
exceeds
two
months,
the
coordinator
may
request
the
Commission
if
the
suspension will
continue.
If the payment deadline has been suspended due to the non-compliance of the technical or financial reports
(see
Article
20)
and
the
revised
report
or
statement
is
not
submitted
or
was
submitted
but
is
also rejected, the Commission may also terminate the Agreement or the participation of the beneficiary (see Article
50.3.1(l)).
ARTICLE 48 — SUSPENSION OF PAYMENTS
48.1
Conditions
The Commission may — at any moment — suspend payments, in whole or in part and interim payments or the payment of the balance for one or more beneficiaries, if:
(a)
a
beneficiary
(or
a
natural
person
who
has
the
power
to
represent
or
take
decision
on
its
behalf) has committed or is suspected of having
committed:
(i)
substantial errors, irregularities or fraud
or
(ii)
serious breach of obligations under the Agreement or during the award procedure (including
improper
implementation
of
the
action,
submission
of
false
information,
failure to provide required information, breach of ethical principles)
or
(b)
a
beneficiary
(or
a
natural
person
who
has
the
power
to
represent
or
take
decision
on
its
behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (
extension of findings from other grants to this grant
; see Article
22.5.2).
If
payments
are
suspended
for
one
or
more
beneficiaries,
the
Commission
will
make
partial
payment(s) for
the
part(s)
not
suspended.
If
suspension
concerns
the
payment
of
the
balance,
—
once
suspension is lifted — the payment or the recovery of the amount(s) concerned will be considered the payment of the balance that closes the
action.
48.2
Procedure
Before suspending payments, the Commission will formally notify the coordinator or beneficiary concerned:
·
informing it of its intention to suspend payments and the reasons why
and
·
inviting it to submit observations within 30 days of receiving
notification.
If the Commission does not receive observations or decides to pursue the procedure despite the observations
it
has
received,
it
will
formally
notify
confirmation
of
the
suspension.
Otherwise,
it
will formally notify that the suspension procedure is not
continued.
The suspension will
take effect
the day the confirmation notification is sent by the Commission.
If the conditions for resuming payments are met, the suspension will be
lifted
. The Commission
will formally notify the coordinator or beneficiary
concerned.
During the suspension, the periodic report(s) for all reporting periods except the last one (see Article
20.3),
must
not
contain
any
individual
financial
statements
from
the
beneficiary
concerned
70
and its linked third parties. The coordinator must include them in the next periodic report after the suspension
is
lifted
or
—
if
suspension
is
not
lifted
before
the
end
of
the
action
—
in
the
last
periodic report.
The beneficiaries may suspend implementation of the action (see Article 49.1) or terminate the Agreement or the participation of the beneficiary concerned (see Article 50.1 and 50.2).
ARTICLE 49 — SUSPENSION OF THE ACTION IMPLEMENTATION
49.1
Suspension of the action implementation, by the
beneficiaries
49.1.1
Conditions
The beneficiaries may suspend implementation of the action or any part of it, if exceptional circumstances — in particular
force majeure
(see Article 51) — make implementation impossible or excessively difficult.
49.1.2
Procedure
The
coordinator
must
immediately
formally
notify
to
the
Commission
the
suspension
(see
Article
52), stating:
·
the reasons why
and
·
the expected date of
resumption.
The suspension will
take effect
the day this notification is received by the Commission.
Once
circumstances
allow
for
implementation
to
resume,
the
coordinator
must
immediately
formally notify the Commission and request an
amendment
of the Agreement to set the date on which the action will be resumed, extend the duration of the action and make other changes necessary to adapt the action to the new situation (see Article 55) — unless the Agreement or the participation of a beneficiary has been terminated (see Article
50).
The suspension will be
lifted
with effect from the resumption date set out in the amendment. This date may be before the date on which the amendment enters into force.
Costs incurred during suspension of the action implementation are not eligible (see Article 6).
49.2
Suspension of the action implementation, by the
Commission
49.2.1 Conditions
The Commission may suspend implementation of the action or any part of it, if:
(a)
a
beneficiary
(or
a
natural
person
who
has
the
power
to
represent
or
take
decisions
on
its
behalf) has committed or is suspected of having
committed:
(i)
substantial errors, irregularities or fraud
or
(ii)
serious breach of obligations under the Agreement or during the award procedure (including
improper
implementation
of
the
action,
submission
of
false
declaration,
failure to provide required information, breach of ethical
principles);
79
(b)
a
beneficiary
(or
a
natural
person
who
has
the
power
to
represent
or
take
decisions
on
its
behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (
extension of findings from other grants to this grant
; see Article 22.5.2),
or
(c)
the action is suspected of having lost its scientific or technological
relevance.
49.2.2
Procedure
Before
suspending
implementation
of
the
action,
the
Commission
will
formally
notify
the
coordinator or beneficiary
concerned:
·
informing it of its intention to suspend the implementation and the reasons why
and
·
inviting it to submit observations within 30 days of receiving
notification.
If the Commission does not receive observations or decides to pursue the procedure despite the observations
it
has
received,
it
will
formally
notify
confirmation
of
the
suspension.
Otherwise,
it
will formally notify that the procedure is not
continued.
The
suspension
will
take
effect
five
days
after
confirmation
notification
is
received
(or
on
a
later
date specified in the
notification).
It will be
lifted
if the conditions for resuming implementation of the action are met.
The coordinator or beneficiary concerned will be formally notified of the lifting and the Agreement will
be
amended
to
set
the
date
on
which
the
action
will
be
resumed,
extend
the
duration
of
the
action and make other changes necessary to adapt the action to the new situation (see Article 55) — unless the Agreement has already been terminated (see Article
50).
The
suspension
will
be
lifted
with
effect
from
the
resumption
date
set
out
in
the
amendment.
This
date may be before the date on which the amendment enters into
force.
Costs incurred during suspension are not eligible (see Article 6).
The beneficiaries may not claim damages due to suspension by the Commission (see Article 46).
Suspension of the action implementation does not affect the Commission’s right to terminate the Agreement or participation of a beneficiary (see Article 50), reduce the grant or recover amounts unduly paid (see Articles 43 and 44).
ARTICLE 50 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION OF ONE OR MORE BENEFICIARIES
50.1
Termination of the Agreement, by the
beneficiaries
50.1.1
Conditions and
procedure
The beneficiaries may terminate the Agreement.
The coordinator must formally notify termination to the Commission (see Article 52), stating:
·
the reasons why
and
·
the date the termination will take effect. This date must be after the
notification.
If no reasons are given or if the Commission considers the reasons do not justify termination, the Agreement will be considered to have been ‘
terminated improperly
’.
The termination will
take effect
on the day specified in the notification.
50.1.2
Effects
The coordinator must — within 60 days from when termination takes effect — submit:
(i)
a periodic report (for the open reporting period until termination; see Article 20.3)
and
(ii)
the final report (see Article
20.4).
If the Commission does not receive the reports within the deadline (see above), only costs which are included in an approved periodic report will be taken into account.
The Commission will
calculate
the final grant amount (see Article 5.3) and the balance (see Article 21.4) on the basis of the reports submitted. Only costs incurred until termination are eligible (see Article 6). Costs relating to contracts due for execution only after termination are not
eligible.
Improper termination may lead to a reduction of the grant (see Article 43).
After termination, the beneficiaries’ obligations (in particular Articles 20, 22, 23, Section 3 of Chapter 4, 36, 37, 38, 40, 42, 43 and 44) continue to apply.
50.2
Termination of the participation of one or more beneficiaries, by the
beneficiaries
50.2.1
Conditions and
procedure
The participation of one or more beneficiaries may be terminated by the coordinator, on request of the beneficiary concerned or on behalf of the other beneficiaries.
The coordinator must formally notify termination to the Commission (see Article 52) and inform the beneficiary concerned.
If the coordinator’s participation is terminated without its agreement, the formal notification must be done by another beneficiary (acting on behalf of the other beneficiaries).
The notification must include:
·
the reasons
why;
·
the opinion of the beneficiary concerned (or proof that this opinion has been requested in writing);
·
the date the termination takes effect. This date must be after the notification,
and
·
a request for amendment (see Article 55), with a proposal for reallocation of the tasks and the estimated budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the addition of one or more new beneficiaries (see Article 56). If termination takes effect after
the
period set out in Article 3, no request for amendment must be included unless the beneficiary concerned is the coordinator. In this case, the request for amendment must propose a new coordinator.
If this information is not given or if the Commission considers that the reasons do not justify termination, the participation will be considered to have been
terminated improperly
.
The termination will
take effect
on the day specified in the notification.
50.2.2
Effects
The coordinator must — within 30 days from when termination takes effect — submit:
(i)
a report on the distribution of payments to the beneficiary concerned
and
(ii)
if termination takes effect during the period set out in Article 3, a ‘
termination report
’ from the beneficiary concerned, for the open reporting period until termination, containing an overview of the progress of the work, an overview of the use of resources, the individual
financial
statement
and,
if
applicable,
the
certificate
on
the
financial
statement
(see Articles 20.3 and
20.4).
The information in the termination report must also be included in the periodic report for the next reporting period (see Article 20.3).
If
the
request
for
amendment
is
rejected
by
the
Commission,
(because
it
calls
into
question
the
decision awarding
the
grant
or
breaches
the
principle
of
equal
treatment
of
applicants),
the
Agreement
may
be terminated according to Article
50.3.1(c).
If
the
request
for
amendment
is
accepted
by
the
Commission,
the
Agreement
is
amended
to
introduce the necessary changes (see Article
55).
The Commission will — on the basis of the periodic reports, the termination report and the report on the distribution of payments —
calculate
the amount which is due to the beneficiary and if the (pre-financing and interim) payments received by the beneficiary exceed this
amount.
The
amount which is due
is calculated in the following steps:
Step 1 — Application of the reimbursement rate to the eligible costs
The grant amount for the beneficiary is calculated by applying the reimbursement rate(s) to the total eligible costs declared by the beneficiary and its linked third parties in the termination report and approved by the Commission.
Only costs incurred by the beneficiary concerned until termination takes effect are eligible (see Article 6). Costs relating to contracts due for execution only after termination are not eligible.
Step
2
—
Reduction
due
to
substantial
errors,
irregularities
or
fraud
or
serious
breach
of obligations
In case of a reduction (see Article 43), the Commission will calculate the reduced grant amount for the beneficiary by deducting the amount of the reduction (calculated in proportion to the seriousness of the errors, irregularities or fraud or
breach of obligations, in accordance with Article 43.2) from the grant amount for the beneficiary.
If the payments received
exceed the amounts due
:
·
if termination takes effect during the period set out in Article 3 and the request for amendment
is
accepted,
the
beneficiary
concerned
must
repay
to
the
coordinator
the
amount unduly received. The Commission will formally notify the amount unduly received and request the beneficiary concerned to repay it to the coordinator within 30 days of receiving notification. If it does not repay the coordinator, the Commission will draw upon the Guarantee Fund to pay the coordinator and then notify a
debit note
on behalf of the Guarantee Fund to the beneficiary concerned (see Article
44);
·
in
all
other
cases,
in
particular
if
termination
takes
effect
after
the
period
set
out
in
Article
3, the Commission will formally notify a
debit note
to the beneficiary concerned. If
payment is
not
made
by
the
date
in
the
debit
note,
the
Guarantee
Fund
will
pay
to
the
Commission
the amount due and the Commission will notify a debit note on behalf of the Guarantee Fund to the beneficiary concerned (see Article
44);
·
if the beneficiary concerned is the former coordinator, it must repay the new coordinator according to the procedure above,
unless:
·
termination takes effect after an interim payment
and
·
the former coordinator has not distributed amounts received as pre-financing or interim payments (see Article
21.7).
In this case, the Commission will formally notify a
debit note
to the former coordinator. If payment is not made by the date in the debit note, the Guarantee Fund will pay to the Commission
the
amount
due.
The
Commission
will
then
pay
the
new
coordinator
and
notify a debit note on behalf of the Guarantee Fund to the former coordinator (see Article
44).
If the payments received
do not exceed the amounts due
: amounts owed to the beneficiary concerned will be included in the next interim or final payment.
If the Commission does not receive the termination report within the deadline (see above), only costs included in an approved periodic report will be taken into account.
If
the
Commission
does
not
receive
the
report
on
the
distribution
of
payments
within
the
deadline
(see above), it will consider
that:
·
the coordinator did not distribute any payment to the beneficiary concerned and
that
·
the beneficiary concerned must not repay any amount to the
coordinator.
Improper termination may lead to a reduction of the grant (see Article 43) or termination of the Agreement (see Article 50).
After
termination,
the
concerned
beneficiary’s
obligations
(in
particular
Articles
20,
22,
23,
Section
3 of Chapter 4, 36, 37, 38, 40, 42, 43 and 44) continue to
apply.
50.3
Termination of the Agreement or the participation of one or more beneficiaries, by
the Commission
50.3.1
Conditions
The Commission may terminate the Agreement or the participation of one or more beneficiaries, if:
(a)
one or more beneficiaries do not accede to the Agreement (see Article
56);
(b)
a change to their legal, financial, technical, organisational or ownership situation (or those of its linked third parties) is likely to substantially affect or delay the implementation of the action or calls into question the decision to award the
grant;
(c)
following
termination
of
participation
for
one
or
more
beneficiaries
(see
above),
the
necessary changes
to
the
Agreement
would
call
into
question
the
decision
awarding
the
grant
or
breach the principle of equal treatment of applicants (see Article
55);
(d)
implementation of the action is prevented by force majeure (see Article 51) or suspended by the coordinator (see Article 49.1) and
either:
(i)
resumption is impossible,
or
(ii)
the necessary changes to the Agreement would call into question the decision
awarding the grant or breach the principle of equal treatment of
applicants;
(e)
a beneficiary is declared bankrupt, being wound up, having its affairs administered by the courts, has entered into an arrangement with creditors, has suspended business activities, or is subject to any other similar proceedings or procedures under national
law;
(f)
a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has been found guilty of professional misconduct, proven by any
means;
(g)
a beneficiary does not comply with the applicable national law on taxes and social
security;
(h)
the action has lost scientific or technological
relevance;
(i)
not
applicable;
(j)
not
applicable;
(k)
a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed fraud, corruption, or is involved in a criminal organisation, money laundering or any other illegal
activity;
(l)
a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has
committed:
(i)
substantial errors, irregularities or fraud
or
(ii)
serious breach of obligations under the Agreement or during the award procedure (including improper implementation of the action, submission of false information, failure to provide required information, breach of ethical
principles);
(m)
a beneficiary has committed — in other EU or Euratom grants awarded to it under similar conditions
—
systemic
or
recurrent
errors,
irregularities,
fraud
or
serious
breach
of
obligations that have a material impact on this grant (
extension of findings from other grants to this grant
; see Article
22.5.2).
(n)
despite a specific request by the Commission, a beneficiary does not request — through the coordinator — an amendment to the Agreement to end the participation of one of its linked third parties that is in one of the situations under points (e), (f), (g), (k), (l) or (m) and to reallocate its
tasks.
50.3.2
Procedure
Before terminating the Agreement or participation of one or more beneficiaries, the Commission will formally notify the coordinator or beneficiary concerned:
·
informing it of its intention to terminate and the reasons why
and
·
inviting it, within 30 days of receiving notification, to submit observations and — in case of Point (l.ii) above — to inform the Commission of the measures to ensure compliance with
the obligations under the
Agreement.
If the Commission does not receive observations or decides to pursue the procedure despite the observations it has received, it will formally notify to the coordinator or beneficiary concerned
confirmation
of
the
termination
and
the
date
it
will
take
effect.
Otherwise,
it
will
formally
notify
that the procedure is not
continued.
The termination will
take effect
:
·
for
terminations
under
Points
(b),
(c),
(e),
(g),
(h),
(j),
(l.ii)
and
(n)
above:
on
the
day
specified in the notification of the confirmation (see
above);
·
for terminations under Points (a), (d), (f), (i), (k), (l.i) and (m) above: on the day after the notification of the confirmation is
received.
50.3.3
Effects
(a)
for
termination of the
Agreement
:
The coordinator must — within 60 days from when termination takes effect — submit:
(i)
a
periodic
report
(for
the
last
open
reporting
period
until
termination;
see
Article
20.3)
and
(ii)
a final report (see Article
20.4).
If
the
Agreement
is
terminated
for
breach
of
the
obligation
to
submit
reports
(see
Articles
20.8 and 50.3.1(l)), the coordinator may not submit any reports after
termination.
If the Commission does not receive the reports within the deadline (see above), only costs which are included in an approved periodic report will be taken into account.
The Commission will
calculate
the final grant amount (see Article 5.3) and the balance (see Article 21.4) on the basis of the reports submitted. Only costs incurred until termination takes effect are eligible (see Article 6). Costs relating to contracts due for execution only after termination are not eligible.
This does not affect the Commission’s right to reduce the grant (see Article 43) or to impose administrative sanctions (Article 45).
The beneficiaries may not claim damages due to termination by the Commission (see Article
46).
After termination, the beneficiaries’ obligations (in particular Articles 20, 22, 23, Section 3
of Chapter 4, 36, 37, 38, 40, 42, 43 and 44) continue to
apply.
(b)
for
termination of the participation of one or more
beneficiaries
:
The coordinator must — within 60 days from when termination takes effect — submit:
(i)
a report on the distribution of payments to the beneficiary
concerned;
(ii)
a
request
for
amendment
(see
Article
55),
with
a
proposal
for
reallocation
of
the
tasks
and estimated budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the addition of one or more new beneficiaries (see Article 56). If termination is notified after the period set out in Article 3, no request for amendment must be submitted unless the
beneficiary
concerned
is
the
coordinator.
In
this
case
the
request
for
amendment
must propose a new coordinator,
and
(iii)
if termination takes effect during the period set out in Article 3, a
termination report
from
the
beneficiary
concerned,
for
the
open
reporting
period
until
termination,
containing an overview of the progress of the work, an overview of the use of resources, the individual
financial
statement
and,
if
applicable,
the
certificate
on
the
financial
statement (see Article
20).
The information in the termination report must also be included in the periodic report for the next reporting period (see Article 20.3).
If the request for amendment is rejected by the Commission, (because it calls into question the decision awarding the grant or breaches the principle of equal treatment of applicants),
the Agreement may be terminated according to Article
50.3.1(c).
If the request for amendment is accepted by the Commission, the Agreement is
amended
to introduce the necessary changes (see Article 55).
The Commission will — on the basis of the periodic reports, the termination report and the report
on
the
distribution
of
payments
—
calculate
the
amount
which
is
due
to
the
beneficiary and
if
the
(pre-financing
and
interim)
payments
received
by
the
beneficiary
exceed
this
amount.
The
amount which is due
is calculated in the following steps:
Step
1
—
Application of the reimbursement rate to the eligible
costs
The grant amount for the beneficiary is calculated by applying the reimbursement rate(s) to the total eligible costs declared by the beneficiary and its linked third parties in the termination report and approved by the Commission.
Only costs incurred by the beneficiary concerned until termination takes effect
are
eligible
(see
Article
6).
Costs
relating
to
contracts
due
for
execution only after termination are not
eligible.
Step
2
—
Reduction due to substantial errors, irregularities or fraud or
serious
breach
of
obligations
In case of a reduction (see Article 43), the Commission will calculate the reduced grant amount for the beneficiary by deducting the amount of the reduction (calculated in proportion to the seriousness of the errors, irregularities or fraud or breach of obligations, in accordance with Article 43.2) from the grant amount for the
beneficiary.
If the payments received
exceed the amounts due
:
·
if termination takes effect during the period set out in Article 3 and the request for amendment is accepted, the beneficiary concerned must repay to the coordinator
the amount unduly received. The Commission will formally notify the amount unduly received and request the beneficiary concerned to repay it to the coordinator within 30
days
of
receiving
notification.
If
it
does
not
repay
the
coordinator,
the
Commission will draw upon the Guarantee Fund to pay the coordinator and then notify a
debit note
on behalf of the Guarantee Fund to the beneficiary concerned (see Article
44);
·
in all other cases, in particular if termination takes effect after the period set out in Article 3, the Commission will formally notify a
debit note
to the beneficiary concerned. If payment is not made by the date in the debit note, the Guarantee Fund will pay to the Commission the amount due and the Commission will notify a debit note on behalf of the Guarantee Fund to the beneficiary concerned (see Article
44);
·
if the beneficiary concerned is the former coordinator, it must repay the new coordinator according to the procedure above,
unless:
·
termination takes effect after an interim payment
and
·
the former coordinator has not distributed amounts received as pre-financing or interim payments (see Article
21.7).
In this case, the Commission will formally notify a
debit note
to the former coordinator.
If
payment
is
not
made
by
the
date
in
the
debit
note,
the
Guarantee
Fund will pay to the Commission the amount due. The Commission will then pay the
new coordinator and notify a debit note on behalf of the Guarantee Fund to the former coordinator (see Article
44).
If
the
payments
received
do
not
exceed
the
amounts
due
:
amounts
owed
to
the
beneficiary concerned will be included in the next interim or final
payment.
If
the
Commission
does
not
receive
the
termination
report
within
the
deadline
(see
above),
only costs included in an approved periodic report will be taken into
account.
If the Commission does not receive the report on the distribution of payments within the deadline (see above), it will consider that:
·
the coordinator did not distribute any payment to the beneficiary concerned and
that
·
the beneficiary concerned must not repay any amount to the
coordinator.
After termination, the concerned beneficiary’s obligations (in particular Articles 20, 22, 23, Section 3 of Chapter 4, 36, 37, 38, 40, 42, 43 and 44) continue to apply.
SECTION 4 FORCE MAJEURE
ARTICLE 51 — FORCE MAJEURE
‘Force majeure’ means any situation or event that:
·
prevents either party from fulfilling their obligations under the
Agreement,
·
was unforeseeable, exceptional situation and beyond the parties’
control,
·
was not due to error or negligence on their part (or on the part of third parties involved in the action),
and
·
proves to be inevitable in spite of exercising all due
diligence.
The following cannot be invoked as force majeure:
·
any default of a service, defect in equipment or material or delays in making them available, unless they stem directly from a relevant case of force
majeure,
·
labour disputes or strikes,
or
·
financial
difficulties.
Any situation constituting force majeure must be formally notified to the other party without delay, stating the nature, likely duration and foreseeable effects.
The parties must immediately take all the necessary steps to limit any damage due to force majeure and do their best to resume implementation of the action as soon as possible.
The party prevented by force majeure from fulfilling its obligations under the Agreement cannot be considered in breach of them.
CHAPTER 7 FINAL PROVISIONS
ARTICLE 52 — COMMUNICATION BETWEEN THE PARTIES
52.1
Form and means of
communication
Communication
under
the
Agreement
(information,
requests,
submissions,
‘formal
notifications’,
etc.) must:
·
be made in writing
and
·
bear the number of the
Agreement.
80
Until
the
payment
of
the
balance
:
all
communication
must
be
made
through
the
electronic
exchange system and using the forms and templates provided
there.
After the payment of the balance
: formal notifications must be made by registered post with proof of delivery (‘formal notification on paper’).
Communications
in
the
electronic
exchange
system
must
be
made
by
persons
authorised
according
to the
Participant
Portal
Terms
&
Conditions.
For
naming
the
authorised
persons,
each
beneficiary
must have
designated
—
before
the
signature
of
this
Agreement
—
a
‘legal
entity
appointed
representative (LEAR)’.
The
role
and
tasks
of
the
LEAR
are
stipulated
in
his/her
appointment
letter
(see
Participant Portal
Terms
&
Conditions).
If the electronic exchange system is temporarily unavailable, instructions will be given on the Commission websites.
52.2
Date of
communication
Communications
are considered to have been made when they are sent by the sending party (i.e.
on the date and time they are sent through the electronic exchange
system).
Formal
notifications
through
the
electronic
exchange
system
are
considered
to
have
been
made
when they
are
received
by
the
receiving
party
(i.e.
on
the
date
and
time
of
acceptance
by
the
receiving
party,
as
indicated
by
the
time
stamp).
A
formal
notification
that
has
not
been
accepted
within
10
days
after sending is considered to have been
accepted.
Formal
notifications
on
paper
sent
by
registered
post
with
proof
of
delivery
(only
after
the
payment of the balance) are considered to have been made on
either:
·
the delivery date registered by the postal service
or
·
the deadline for collection at the post
office.
If the electronic exchange system is temporarily unavailable, the sending party cannot be considered in breach of its obligation to send a communication within a specified deadline.
52.3
Addresses for
communication
The
electronic
exchange system must be accessed via the following URL:
https://ec.europa.eu/research/participants/portal/desktop/en/projects/
The Commission will formally notify the coordinator and beneficiaries in advance any changes to this URL.
Formal notifications on paper
(only after the payment of the balance) addressed
to the Commission
must be sent to the following address:
European Commission
Communications Networks, Content and Technology Data Policy & Innovation
L-2920 Luxembourg Luxembourg
Formal notifications on paper (only after the payment of the balance) addressed
to the beneficiaries
must be sent to their legal address as specified in the Participant Portal Beneficiary Register.
84
ARTICLE 53 — INTERPRETATION OF THE AGREEMENT
53.1
Precedence of the
Terms
and Conditions over the
Annexes
The provisions in the Terms and Conditions of the Agreement take precedence over its Annexes. Annex 2 takes precedence over Annex 1.
53.2
Privileges and
immunities
Not applicable
ARTICLE 54 — CALCULATION OF PERIODS, DATES AND DEADLINES
In
accordance
with
Regulation
No
1182/71
28
,
periods
expressed
in
days,
months
or
years
are
calculated from the moment the triggering event
occurs.
The day during which that event occurs is not considered as falling within the period.
ARTICLE 55 — AMENDMENTS TO THE AGREEMENT
55.1
Conditions
The Agreement may be amended, unless the amendment entails changes to the Agreement which would call into question the decision awarding the grant or breach the principle of equal treatment of
applicants.
Amendments may be requested by any of the parties.
55.2
Procedure
The party requesting an amendment must submit a request for amendment signed in the electronic exchange system (see Article 52).
The coordinator submits and receives requests for amendment on behalf of the beneficiaries (see Annex 3).
If
a
change
of
coordinator
is
requested
without
its
agreement,
the
submission
must
be
done
by
another beneficiary (acting on behalf of the other
beneficiaries).
The request for amendment must include:
·
the reasons
why;
·
the appropriate supporting
documents;
·
for
a
change
of
coordinator
without
its
agreement:
the
opinion
of
the
coordinator
(or
proof
that this opinion has been requested in
writing).
The Commission may request additional information.
28
Regulation (EEC, Euratom) No 1182/71 of the Council of 3 June 1971 determining the rules applicable to periods, dates and time-limits (OJ L 124, 8.6.1971, p. 1).
If
the
party
receiving
the
request
agrees,
it
must
sign
the
amendment
in
the
electronic
exchange
system within
45
days
of
receiving
notification
(or
any
additional
information
the
Commission
has
requested). If it does not agree, it must formally notify its disagreement within the same deadline. The deadline may be extended, if necessary for the assessment of the request. If no notification is received within the deadline, the request is considered to have been
rejected
An amendment
enters into force
on the day of the signature of the receiving party.
An
amendment
takes
effect
on
the
date
agreed
by
the
parties
or,
in
the
absence
of
such
an
agreement, on the date on which the amendment enters into
force.
ARTICLE 56 — ACCESSION TO THE AGREEMENT
56.1
Accession of the beneficiaries mentioned in the
Preamble
The
other
beneficiaries
must
accede
to
the
Agreement
by
signing
the
Accession
Form
(see
Annex
3)
in the
electronic
exchange
system
(see
Article
52)
within
30
days
after
its
entry
into
force
(see
Article
58).
They
will
assume
the
rights
and
obligations
under
the
Agreement
with
effect
from
the
date
of
its
entry into force (see Article
58).
If a beneficiary does not accede to the Agreement within the above deadline, the coordinator must
·
within 30 days — request an amendment to make any changes necessary to ensure proper implementation
of
the
action.
This
does
not
affect
the
Commission’s
right
to
terminate
the
Agreement (see Article
50).
56.2
Addition of new
beneficiaries
In justified cases, the beneficiaries may request the addition of a new beneficiary.
For
this
purpose,
the
coordinator
must
submit
a
request
for
amendment
in
accordance
with
Article
55. It must include an Accession Form (see Annex 3) signed by the new beneficiary in the electronic exchange system (see Article
52).
New beneficiaries must assume the rights and obligations under the Agreement with effect from the date of their accession specified in the Accession Form (see Annex 3).
ARTICLE 57 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES
57.1
Applicable
law
The Agreement is governed by the applicable EU law, supplemented if necessary by the law of Belgium.
57.2
Dispute
settlement
If a dispute concerning the interpretation, application or validity of the Agreement cannot be settled amicably,
the
General
Court
—
or,
on
appeal,
the
Court
of
Justice
of
the
European
Union
—
has
sole jurisdiction. Such actions must be brought under Article 272 of the Treaty on the Functioning of the EU
(TFEU).
As an exception, if such a dispute is between the Commission and STIFTELSEN SINTEF, SINTEF FISKERI
OG
HAVBRUK
AS,
IBM
ISRAEL
-
SCIENCE
AND
TECHNOLOGY
LTD,
KINGS
BAY
AS, EROS AS, ERVIK & SAEVIK AS, LIEGRUPPEN FISKERI AS, CSEM CENTRE SUISSE D'ELECTRONIQUE ET DE MICROTECHNIQUE SA - RECHERCHE ET DEVELOPPEMENT,
UNIVERSITAET ST. GALLEN, NORGES SILDESALGSLAG SA, the competent Belgian courts have sole jurisdiction.
If
a
dispute
concerns
administrative
sanctions,
offsetting
or
an
enforceable
decision
under
Article
299 TFEU (see Articles 44, 45 and 46), the beneficiaries must bring action before the General Court —
or,
on appeal, the Court of Justice of the European Union — under Article 263 TFEU.
ARTICLE 58 — ENTRY INTO FORCE OF THE AGREEMENT
The Agreement will enter into force on the day of signature by the Commission or the coordinator, depending on which is later.
SIGNATURES
For
the
coordinator
For the
Commission
Alexandros Stergios MANOS with ECAS id nmnosale signed in the Participant Portal on 26/10/2016 at 09:42:11 (transaction id SigId-55133- ZimW3ysw8qxPLR0ftAoGUeLxo6ngDfiOyS6OH0ly6bGVXzqjq7VFLfmq hOMcJXJWq4GnzfljbM5vFfRxgzgMdZm-Jj71zxYb8yrkmoAceBIUCa- ACzzzzJEnBcEy2SGoP5cmoYbfsv1WkRsi4KKfb58vN7I). Timestamp by third party at
Wed Oct 26 10:42:23 CEST 2016
Signed by Gustav KALBE with ECAS id kalbegu as an authorised representative on 09-11-2016 09:26:09 (transaction id SigId-18158- KySDD1cnskVZRtLbSQhirJEGbicBSoxebUVYzzgcZB3mzo0DuS9 RoQX94MbfiddLM2Xpn2XkHrFMYgIE7ip9vHG- PHslUMVSXYCEbaUOEcOk1C-
8rnuC33rsBdzWHb0qzuFZzTi5Hzbjy6euEYqD8UTzjg
EW) Wed Nov 09 09:26:16 CET 201
Digitally sealed by the European Commission Date: 2016.10.19 13:56:00 CEST
This document is digitally sealed. The digital sealing mechanism uniquely binds the document to the modules of the Participant Portal of the European Commission, to the transaction for which it was generated and ensures its integrity and authenticity.
Any attempt to modify the content will lead to a breach of the electronic seal, which can be verified at any time by clicking on the digital seal validation symbol.
Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel.
+32 22991111