                        Document Title:             DOCUMENTED CHANGE REQUEST
Date Modified:                               Revision: V1.1.1
Revision Note:                               Alt Doc #:
IFS Document #:

Proposal Number:                   PROJECT INFORMATION
Project Number:   QXQ1K1017B_V1.5
Project Name:     P4CZ009933
Project Manager:  Personal Safety Interlock System
                  Stephan Richter / Georg Näger

                            CHANGE INFORMATION

DCR#: 07                                                           Date: 6-Dec-19

Subject: DCR05_Add. PSX_Cabinet R01                                Initiated By: Eli Beam

Classification of Request:      Functional Change                        Documentation Error
                                Clarification                            Operational Suggestion
                            X Final Design Detail                  X Schedule Change
                                Other

Recommended Priority:       High                          Medium   X Low
Areas Impacted:
                            X Hardware & Engineering                  Software & Engineering
                            X Drafting                            X Assembly

                                Other:

Description of Change

Item                                     Item Description                                             Price

No.

      Reason of the additional request:

           Eli requested additional changes to the approved system which requires to design, build,

                 test and install an additional cabinet.

      Subject of the change:
           This DCR requires additional HW to be installed, including:
                    o Electrical design,
                    o Production including materials (Rittal AE 800x1000x300mm, relays, terminals)
                    o Small assembly material – cable ducts, wires, labels,
                    o Cabinet test protocols & test execution
                    o Installation on site of cabinet
                    o Supervision of subcontractor, review of installation and cabinet

Document Class:                                                           Template Rev: V1.1.1

File: P4CZ009933-DCR05_Add. PSX_Cabinet R02.docx

                                         Confidential Information                                     Page: 1/4

                 Copyright © 2011 Rockwell Automation, Inc. All Rights Reserved.
Document Title:  DOCUMENTED CHANGE REQUEST
Date Modified:                    Revision: V1.1.1
Revision Note:                    Alt Doc #:
IFS Document #:

     Delivery time is:
              o Electrical design 10d after approval
              o Delivery of cabinet: 3 working days after approval of drawings.

Affected areas:

      E1

Required customer support

      As for main project.

RFQ received:

      As per request by Eli Beam

Proposal includes:

A/ Material
      See above

B/Services
      Project management and administration
      Supervision of subcontractor
      Installation on site
      Drawings update

Proposal does not include:

      Modification and changes of another parts then described
      Modification and changes of another part of technologies

Document Class:                                                                  Template Rev: V1.1.1

File: P4CZ009933-DCR05_Add. PSX_Cabinet R02.docx

                 Confidential Information                                         Page: 2/4

                 Copyright © 2011 Rockwell Automation, Inc. All Rights Reserved.
Document Title:          DOCUMENTED CHANGE REQUEST
Date Modified:                            Revision: V1.1.1
Revision Note:                            Alt Doc #:
IFS Document #:

Notes:

Project Impact Estimate                               Labor X
                                                  Expenses
 Lost Time:                                        Material X
  Schedule: X

      Other:

Offer Expires 30 Days from Date of Record       DCR Value 1.834 €
    Approved                               Customer Notes:
    Rejected
    Revise as Noted & Re-submit

Document Class:                                                    Template Rev: V1.1.1

File: P4CZ009933-DCR05_Add. PSX_Cabinet R02.docx

                         Confidential Information                                 Page: 3/4

                 Copyright © 2011 Rockwell Automation, Inc. All Rights Reserved.
Document Title:     DOCUMENTED CHANGE REQUEST                                     Date:
Date Modified:                       Revision: V1.1.1                             27-Nov-19
Revision Note:                       Alt Doc #:
IFS Document #:
                      Date:
Customer Approval:

Copyright Notice Warning
Except for any customer content incorporated herein, this document, including but not limited to, text, language structure, graphics, logos, methodologies
and/or other content, is the property of Rockwell Automation, Inc. and is protected by U.S. and international copyright laws.

Any use, unless otherwise authorized in writing by Rockwell Automation, Inc. or its subsidiaries and affiliates, including the reproduction, modification,
distribution, transmission, or republication of this document or any portion thereof, is strictly prohibited.

Copyright © 2011 Rockwell Automation, Inc. All Rights Reserved.

Document Class:                                        Template Rev: V1.1.1

File: P4CZ009933-DCR05_Add. PSX_Cabinet R02.docx

                    Confidential Information                                      Page: 4/4

                 Copyright © 2011 Rockwell Automation, Inc. All Rights Reserved.