Document Title: DOCUMENTED CHANGE REQUEST
Date Modified: Revision: V1.1.1
Revision Note: Alt Doc #:
IFS Document #:
Proposal Number: PROJECT INFORMATION
Project Number: QXQ1K1017B_V1.5
Project Name: P4CZ009933
Project Manager: Personal Safety Interlock System
Stephan Richter / Georg Näger
CHANGE INFORMATION
DCR#: 07 Date: 6-Dec-19
Subject: DCR05_Add. PSX_Cabinet R01 Initiated By: Eli Beam
Classification of Request: Functional Change Documentation Error
Clarification Operational Suggestion
X Final Design Detail X Schedule Change
Other
Recommended Priority: High Medium X Low
Areas Impacted:
X Hardware & Engineering Software & Engineering
X Drafting X Assembly
Other:
Description of Change
Item Item Description Price
No.
Reason of the additional request:
Eli requested additional changes to the approved system which requires to design, build,
test and install an additional cabinet.
Subject of the change:
This DCR requires additional HW to be installed, including:
o Electrical design,
o Production including materials (Rittal AE 800x1000x300mm, relays, terminals)
o Small assembly material – cable ducts, wires, labels,
o Cabinet test protocols & test execution
o Installation on site of cabinet
o Supervision of subcontractor, review of installation and cabinet
Document Class: Template Rev: V1.1.1
File: P4CZ009933-DCR05_Add. PSX_Cabinet R02.docx
Confidential Information Page: 1/4
Copyright © 2011 Rockwell Automation, Inc. All Rights Reserved.
Document Title: DOCUMENTED CHANGE REQUEST
Date Modified: Revision: V1.1.1
Revision Note: Alt Doc #:
IFS Document #:
Delivery time is:
o Electrical design 10d after approval
o Delivery of cabinet: 3 working days after approval of drawings.
Affected areas:
E1
Required customer support
As for main project.
RFQ received:
As per request by Eli Beam
Proposal includes:
A/ Material
See above
B/Services
Project management and administration
Supervision of subcontractor
Installation on site
Drawings update
Proposal does not include:
Modification and changes of another parts then described
Modification and changes of another part of technologies
Document Class: Template Rev: V1.1.1
File: P4CZ009933-DCR05_Add. PSX_Cabinet R02.docx
Confidential Information Page: 2/4
Copyright © 2011 Rockwell Automation, Inc. All Rights Reserved.
Document Title: DOCUMENTED CHANGE REQUEST
Date Modified: Revision: V1.1.1
Revision Note: Alt Doc #:
IFS Document #:
Notes:
Project Impact Estimate Labor X
Expenses
Lost Time: Material X
Schedule: X
Other:
Offer Expires 30 Days from Date of Record DCR Value 1.834 €
Approved Customer Notes:
Rejected
Revise as Noted & Re-submit
Document Class: Template Rev: V1.1.1
File: P4CZ009933-DCR05_Add. PSX_Cabinet R02.docx
Confidential Information Page: 3/4
Copyright © 2011 Rockwell Automation, Inc. All Rights Reserved.
Document Title: DOCUMENTED CHANGE REQUEST Date:
Date Modified: Revision: V1.1.1 27-Nov-19
Revision Note: Alt Doc #:
IFS Document #:
Date:
Customer Approval:
Copyright Notice Warning
Except for any customer content incorporated herein, this document, including but not limited to, text, language structure, graphics, logos, methodologies
and/or other content, is the property of Rockwell Automation, Inc. and is protected by U.S. and international copyright laws.
Any use, unless otherwise authorized in writing by Rockwell Automation, Inc. or its subsidiaries and affiliates, including the reproduction, modification,
distribution, transmission, or republication of this document or any portion thereof, is strictly prohibited.
Copyright © 2011 Rockwell Automation, Inc. All Rights Reserved.
Document Class: Template Rev: V1.1.1
File: P4CZ009933-DCR05_Add. PSX_Cabinet R02.docx
Confidential Information Page: 4/4