                        Installation requirements
Compressed air 
The compressed air should have a pressure of minimum 5.5 bar pressure. The air consumption is 0.24 m³/min or less. The compressed air should be clean from dust particles and oil sediments and dried from water with a dew point below 3°C. The compressed air should be of class 4 or better according to ISO 8573-1.

Electricity 
Required electricity outfit is 400 Volt with three phases 50 Hz, protective ground and a neutral line, with 3*16 A fuses. Earth fault breaker is mandatory to use, this can be provided as an extra option. The mean electrical effect used is 1.35 kW.

DI-water
· Clean particle free deionised water, or reversed osmosis water or similar with a conductivity of less than 5 µS.
· The water must have a pressure of min 3.5 bar and max of 4.5 bar. The pressure should be constant during consumption.
· Consumption depends on the test method.
· When raining a consumption of app. 110 litres per hour for a period of 15 minutes is necessary for the Volvo methods. Within a normal climate cycle approximately 1 litre per hour is needed. For the salt fog methods less than 15 litres per hour is needed during the downfall sections, only TC 220 v2
Drainage 
A drainage point that can take the used a water, containing mainly 0.5-1% of slightly acidified sodium chloride water solution. 
The drain should be placed no more than 50 mm above floor level and in connection with the Test Cabinet unit, preferably behind a line that could be described as the centre line in the longitudinal direction, see diagram below. 
If drainage is not a hand nearby a drainage pump unit can be provided as an option.

The unit can be orientated in several directions. However, the unit must be placed in such a way that doors are not blocked. Also, there must be adequate space for maintenance. 
The cooling/freezing unit can be placed at a maximum of seven meters away from the Test Cabinet from a point on the right low part of the test cabinet, in the same level or higher than the Test Cabinet.


	Name of document
	Type of document
	 
	 

	Capacity diagram TC 220 V2
	Specifications
	 
	 

	Address
	Issue
	Issue date
	Page

	ControlArt AB, Tärnvägen 13 B, SE-475 40 Hönö, Sweden
	1.0
	2025-06-05
	1 (1)

	Tel: +46 (0)700 903734
	 
	 
	 

image1.png

image2.png