                        STT100 - Test Strategy

XBID
Deutsche Borse AG       Version V6.00
XBID Projects            Page 2 of 30
STT100 - Test Strategy

1      In tro d u c tio n ................................................................................................................................................................4

1.1    P u rp o se ................................................................................................................................................. 4

1.2    Intended Audience...............................................................................................................................4

1.3    Reference Docum ents........................................................................................................................ 4

2      Test S c o p e ...................................................................................................................................................................5

2.1    Solution Modules in Scope forTesting...............................................................................................5

2.2    Underlying Documentation forTesting...............................................................................................5

2.2.1  Functional Specification in Scope for Testing.......................................................................................................................... 6
2.2.2  Non Functional Specification in Scopefor Testing.................................................................................................................. 6

3      Test A p p ro a c h ........................................................................................................................................................... 7

3.1    General Test Approach....................................................................................................................... 7

3.2    Test Automation................................................................................................................................... 7

4      Preconditions, Dependenciesand D e lim ita tio n ...........................................................................................8

4.1    Preconditions........................................................................................................................................ 8

4.2    Dependencies.......................................................................................................................................8

4.3    Delimitations........................................................................................................................................ 8

5      Test Process................................................................................................................................................................9

5.1    Test Planning and Control.................................................................................................................. 9

5.1.1  Agree on Testing Framework...................................................................................................................................................... 9
5.1.2  Create Test Phase P la n ............................................................................................................................................................. 10
5.1.3  Agree Test Phase Plan with Project Management................................................................................................................ 10

5.2    Test Analysis and Design..................................................................................................................11

5.2.1  Test Analysis................................................................................................................................................................................11
5.2.2  Review Existing Test M odels....................................................................................................................................................11
5.2.3  Create New Test Models............................................................................................................................................................12
5.2.4  Review Defined Test M odels....................................................................................................................................................12
5.2.5  Prepare Test D ata...................................................................................................................................................................... 13
5.2.6  Prepare Test Environments...................................................................................................................................................... 13
5.2.7  Prepare Test T o o ls ..................................................................................................................................................................... 13

5.3    Test Implementation and Execution............................................................................................... 14

5.3.1  Check Entry Criteria....................................................................................................................................................................14
5.3.2  Perform Test Stand-up.............................................................................................................................................................. 14
5.3.3  Execute Smoke T e s t.................................................................................................................................................................. 15
5.3.4  Execute Test Models.................................................................................................................................................................. 15
5.3.5  Monitor Test Progress against Test P la n ................................................................................................................................ 15
5.3.6  Prepare and Lead Weekly Test StatusM eetings.....................................................................................................................16
5.3.7  Create Weekly Test Status Report............................................................................................................................................16

5.4    Evaluating Exit Criteria and Reporting........................................................................................... 17

5.4.1  Check Exit Criteria...................................................................................................................................................................... 17
5.4.2  Create Test Phase Completion Report.................................................................................................................................... 17

5.5    Test Closing Activities....................................................................................................................... 18

5.5.1  Create Test Completion Report................................................................................................................................................18

5.5.2  Test Closing Activities................................................................................................................................................................18

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any

unauthorized copying of this document or part of it or unauthorized distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects            Page 3 of 30
STT100 - Test Strategy

6       Release Process D e s c rip tio n ............................................................................................................................ 19

7       Planned Test T y p e s ..............................................................................................................................................2 0
7.1     System Test........................................................................................................................................ 20
7.2     Functional T e s t..................................................................................................................................20
7.3     Performance T e s t..............................................................................................................................20
7.4     System Integration T e s t................................................................................................................... 20
7.5     Security Test.......................................................................................................................................20
7.6     Smoke T e s t........................................................................................................................................ 20
7.7     Release T e st.......................................................................................................................................20
7.8     Re-test................................................................................................................................................. 21
7.9     Shakedown Test................................................................................................................................ 21
7.10    Regression Test..................................................................................................................................21
7.11    Infrastructure T e s t............................................................................................................................ 21

8       Detailed Description of Test P hases.............................................................................................................2 2

8.1.1   Unit Test LevelUnit Tests (XBID Solution)............................................................................................................................. 22
8.1.2   Unit Tests (Optional Trading Solution).................................................................................................................................. 22
8.1.3   System Test - FAT Phase I ...................................................................................................................................................... 23
8.1.4   System Test - FAT Phase II .....................................................................................................................................................24
8.1.5   Integration Acceptance Test - IA T .......................................................................................................................................... 24
8.1.6   UAT Phase I - Functional Tests.............................................................................................................................................. 25
8.1.7   UAT Phase II - Performance T e sts......................................................................................................................................... 25
8.1.8   UAT Phase III - Integration Tests............................................................................................................................................25
8.1.9   UAT Phase IV - Simulation Tests............................................................................................................................................26
8.1.10  UAT Phase V - Emergency Plan Sim ulation......................................................................................................................... 26

9       E n v iro n m e n ts ..........................................................................................................................................................2 7

9.1     System Integration Environments...................................................................................................27

9.2     XBID Testing Environment.............................................................................................................. 27

9.3     Simulation/Training Environment.................................................................................................... 27

9.4     Production Environment.................................................................................................................. 27

10      Roles and R esponsibilities................................................................................................................................ 2 8

10.1 PXs Test Manager..............................................................................................................................28

10.2 DBAG Test Manager..........................................................................................................................28

10.3 PXs Tester...........................................................................................................................................28

10.4 DBAG Tester.......................................................................................................................................28

10.5 DBAG Development Lead.................................................................................................................28

10.6 DBAG Developer................................................................................................................................ 29

11      Defect Reporting and T ra c k in g ....................................................................................................................... 3 0

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorized copying of this document or part of it or unauthorized distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG          Version V6.00
XBID Projects               Page 4 of 30
S T T 100 - Test Strategy

1 Introduction

This document details the test strategy for the project as described in the document PER100 Project
Quality Plan. It explains the three quality gates of testing: The unit/developer tests, the factory tests as
well as the user acceptance tests. This document serves as a management tool describing the overall
test strategy as well as the various test methodologies that will be applied for each of the planned test
phases.

Note: The planning details for each test phase will be described in the actual test plan of the
respective test phase, not in this document.

1.1 Purpose

This document provides details on-.

     • The test scope for functional and non-functional tests.
     • The preconditions, dependencies and constraints taken into account.
     • The testing principles underlying the test approach and process.
     • The high level approach taken for the tests including the test levels and types of testing

           planned.
     • The test process applied.
     • A clear definition of roles and responsibilities throughout the testing process.
     • The test types applied for the defined test phases.

1.2 Intended Audience

The intended audience is the following:

          • Project management,
          • Project team members,
          • DBAG’s contractual party, the PXs and PX project stakeholders.

1.3 Reference Documents

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG                          Version V6.00
XBID Projects                               Page 5 of 30
S T T 100 - Test Strategy

2 Test Scope

2.1 Solution Modules in Scope for Testing

2.2 Underlying Documentation for Testing

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG          Version V6.00
XBID Projects               Page 6 of 30
S T T 100 - Test Strategy

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG          Version V6.00
XBID Projects               Page 7 of 30
STT100 - Test Strategy

3 Test Approach

3.1 General Test Approach

3.2 Test Automation

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG                               Version V6.00
XBID Projects                                    Page 8 of 30
S T T 100 - Test Strategy

4 Preconditions, Dependencies and Delimitation

4.1 Preconditions

4.2 Dependencies

4.3 Delimitations

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG                                                                                                Version V6.00
XBID Projects                                                                                                     Page 9 of 30
S T T 100 - Test Strategy

5 Test Process

                                                                                                             v\

5.1 Test Planning and Control

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects           Page 10 of 30
STT100 - Test Strategy

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG             Version V6.00
XBID Projects                 Page 11 of 30
STT100 - Test Strategy

5.2 Test Analysis and Design

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects           Page 12 of 30
STT100 - Test Strategy

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects           Page 13 of 30
STT100 - Test Strategy

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects           Page 14 of 30
STT100 - Test Strategy

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects           Page 15 of 30
STT100 - Test Strategy

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects           Page 16 of 30
STT100 - Test Strategy

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects           Page 17 of 30
STT100 - Test Strategy

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG            Version V6.00
XBID Projects                Page 18 of 30
STT100 - Test Strategy

5.5 Test Closing Activities

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG              Version V6.00
XBID Projects                  Page 19 of 30
STT100 - Test Strategy

6 Release Process Description

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects           Page 20 of 30
STT100 - Test Strategy

7 Planned Test Types

7.1 System Test

7.2 Functional Test

7.3 Performance Test

7.4 System Integration Test

7.5 Security Test
7.6 Smoke Test

7.7 Release Test

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG                                         Version V6.00
XBID Projects                                             Page 21 of 30
STT100 - Test Strategy

7.8 Re-test

7.9 Shakedown Test

                                                     le.

7.10 Regression Test

7.11 Infrastructure Test

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG                      Version V6.00
XBID Projects                          Page 22 of 30
STT100 - Test Strategy

8 Detailed Description of Test Phases

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any unauthorised copying of this document or part of it or unauthorised distribution of the
information contained herein is prohibited. All materials provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects           Page 23 of 30
STT100 - Test Strategy

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any unauthorised copying of this document or part of it or unauthorised distribution of the
information contained herein is prohibited. All materials provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects           Page 24 of 30
STT100 - Test Strategy

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any unauthorised copying of this document or part of it or unauthorised distribution of the
information contained herein is prohibited. All materials provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects           Page 25 of 30
STT100 - Test Strategy
                                        —

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any unauthorised copying of this document or part of it or unauthorised distribution of the
information contained herein is prohibited. All materials provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects           Page 26 of 30
STT100 - Test Strategy

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any unauthorised copying of this document or part of it or unauthorised distribution of the
information contained herein is prohibited. All materials provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG                    Version V6.00
XBID Projects                        Page 27 of 30
STT100 - Test Strategy

9 Environments

9.1 System Integration Environments
9.2 XBID Testing Environment

9.3 Simulation/Training Environment
9.4 Production Environment

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG              Version V6.00
XBID Projects                  Page 28 of 30
STT100 - Test Strategy

10 Roles and Responsibilities

10.1 PXs Test Manager

10.2 DBAG Test Manager

10.3 PXs Tester

10.4 DBAG Tester

10.5 DBAG Development Lead

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG       Version V6.00
XBID Projects           Page 29 of 30
STT100 - Test Strategy

10.6 DBAG Developer

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any
unauthorised copying of this document or part of it or unauthorised distribution of the information contained herein is prohibited. All materials
provided by DB in this context are and remain the intellectual property of DB and all rights therein are reserved.
Deutsche Borse AG                 Version V6.00
XBID Projects                     Page 30 of 30
STT100 - Test Strategy

11 Defect Reporting and Tracking

© 2014 - Deutsche Borse AG - All rights reserved. The information contained in this document is confidential or protected by law. Any